Solicitation Details - MCC 7360 RPQ HLMP-2023-ROOF

Back To Search Solicitations

Title:
Hurricane Loss Mitigation Program - HLMP
Opening Date:
6/12/2024 2:00:00 PM
Announcement Info:
Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). Client: Mary Green Address: 971 NE 155 Terr North Miami Beach 33162 1) Re-roof Complete: ROOFING GENERAL SPECIFICATION All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no butt joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material ROOFING GENERAL SPECIFICATIONS All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE # 5: Contractor will be responsible for water tight tie-in to existing shingle roof. All Low slope roofing (Labor and Materials) must be guaranteed for minimum of 10 years for Shingles and 5 years for Flat deck and Provide owner with manufactures warrantee. NOTE # 6 COMPLY WITH ALL HURRICANE MITIGATION RETROFIT REQUIREMENTS. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all deteriorated fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. New wood to be primed and painted. Replace damaged continuous or spot vents for roof ventilation in soffits. Vent types should be the same style as to maintain uniformity. Soffit Ln. Ft. _50________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Fascia Ln. Ft. _50________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Spot Vent Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $__________ DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material SHINGLES: Remove existing roof cover including accessories and flashing and replace any damaged sheathing as per specifications below. Install one layer of # 30 felt nailed per Code, re-install required accessories, and vent stacks, flashings and edge drip. Install fungus resistant shingles carrying UL label on package and approved by MDC product Control Division; minimum pitch 2-1/2 /12. No Maximum. Install as per Florida Building Code. Provide inspection approval, release of lien, and 10 year warranty on labor, and life time warranty on shingles, shingle color selection by owner. Note: Shingles to be used Timberline Life Time Warranty. Shingles Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ BUILD-UP MEMBRANE: Remove existing roof cover including accessories and flashings and replace any damaged sheathing as per specifications below. Install one layer of # 75 base sheet nailed per Code and two layers of intermediate fiberglass sheets fully mopped with hot asphalt. Re-install required accessories, flashings, vent stacks and edge drip as needed. Top layer consist of a cap sheet granule surface modified membrane carrying UL label on package and MDC Product Control Division approval, fully mopped applied to entire roof surface. Install as per current code and manufacturer's specifications. Provide inspection approval, release of lien, and 5 year warranty. Provide Close cell ridge 1½” foam insulation. 11/2 Insulation Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ ROOF-LOW SLOPE/FLAT DECK, MODIFIED BITUMEN CAP SHEET: Remove existing low slope roof to bare sheathing, must be swept broom clean before new roofing is installed. Furnish and install #43 glass base sheet, over base sheet, install ply(s) #15 fiberglass felt, per UL requirements for combustibility of roofing assembly. Final roof cover must be Fire Rated SBS modified bitumen cap sheet. Installation of all products will be in strict accordance with Manufactures specifications and in compliance with MDC Product Control Division. Provide Close cell ridge 1½” insulation. 11/2 Insulation Sq. Ft._________, Price per Sq. Ft. $_________, Labor cost $________, Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies, _________, Price per unit. $_________, Labor cost $________, Cost $_________ Total Cost $___________ SECONDARY WATER BARRIER (Deck is T & G or Ship-Lap material) Apply a Self-Adhering Polymer Bitumen underlayment; such as Peal and Stick TM or equivalent, over the entire roof surface to cover all joints between ship-lap or tongue and grove decking PRIOR to installation of the roof covering underlayment and roof covering system. Apply 6" wide strips on all joints. Secondary water barrier Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________ Secondary water barrier Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Total Cost $___________ METAL ROOF STRAPS AND GABBLE END BRACING: Provide labor, materials and equipment to install Gable end bracing and metal roof straps if not existing. Gable Ends: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Metal Roof Straps or Double Clips: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Total Cost $___________ TOTAL LUMP SUM BID: $________________ Client: Cynthia McCall Address: 16520 NW 18 Ave Miami Gardens 33054 1) Re-roof Complete: ROOFING GENERAL SPECIFICATION All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no butt joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material ROOFING GENERAL SPECIFICATIONS All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE # 5: Contractor will be responsible for water tight tie-in to existing shingle roof. All Low slope roofing (Labor and Materials) must be guaranteed for minimum of 10 years for Shingles and 5 years for Flat deck and Provide owner with manufactures warrantee. NOTE # 6 COMPLY WITH ALL HURRICANE MITIGATION RETROFIT REQUIREMENTS. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all deteriorated fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. New wood to be primed and painted. Replace damaged continuous or spot vents for roof ventilation in soffits. Vent types should be the same style as to maintain uniformity. Soffit Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Fascia Ln. Ft. 50 _________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Spot Vent Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $__________ DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material SHINGLES: Remove existing roof cover including accessories and flashing and replace any damaged sheathing as per specifications below. Install one layer of # 30 felt nailed per Code, re-install required accessories, and vent stacks, flashings and edge drip. Install fungus resistant shingles carrying UL label on package and approved by MDC product Control Division; minimum pitch 2-1/2 /12. No Maximum. Install as per Florida Building Code. Provide inspection approval, release of lien, and 10 year warranty on labor, and life time warranty on shingles, shingle color selection by owner. Note: Shingles to be used Timberline Life Time Warranty. Shingles Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ BUILD-UP MEMBRANE: Remove existing roof cover including accessories and flashings and replace any damaged sheathing as per specifications below. Install one layer of # 75 base sheet nailed per Code and two layers of intermediate fiberglass sheets fully mopped with hot asphalt. Re-install required accessories, flashings, vent stacks and edge drip as needed. Top layer consist of a cap sheet granule surface modified membrane carrying UL label on package and MDC Product Control Division approval, fully mopped applied to entire roof surface. Install as per current code and manufacturer's specifications. Provide inspection approval, release of lien, and 5 year warranty. Provide Close cell ridge 1½” foam insulation. 11/2 Insulation Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ ROOF-LOW SLOPE/FLAT DECK, MODIFIED BITUMEN CAP SHEET: Remove existing low slope roof to bare sheathing, must be swept broom clean before new roofing is installed. Furnish and install #43 glass base sheet, over base sheet, install ply(s) #15 fiberglass felt, per UL requirements for combustibility of roofing assembly. Final roof cover must be Fire Rated SBS modified bitumen cap sheet. Installation of all products will be in strict accordance with Manufactures specifications and in compliance with MDC Product Control Division. Provide Close cell ridge 1½” insulation. 11/2 Insulation Sq. Ft._________, Price per Sq. Ft. $_________, Labor cost $________, Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies, _________, Price per unit. $_________, Labor cost $________, Cost $_________ Total Cost $___________ SECONDARY WATER BARRIER (Deck is T & G or Ship-Lap material) Apply a Self-Adhering Polymer Bitumen underlayment; such as Peal and Stick TM or equivalent, over the entire roof surface to cover all joints between ship-lap or tongue and grove decking PRIOR to installation of the roof covering underlayment and roof covering system. Apply 6" wide strips on all joints. Secondary water barrier Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________ Secondary water barrier Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Total Cost $___________ METAL ROOF STRAPS AND GABBLE END BRACING: Provide labor, materials and equipment to install Gable end bracing and metal roof straps if not existing. Gable Ends: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Metal Roof Straps: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Total Cost $___________ TOTAL LUMP SUM BID: $________________ Client: Amontil Camille Address: 1340 NW 121 St North Miami 33167 1) Re-roof Complete: ROOFING GENERAL SPECIFICATION All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no butt joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material ROOFING GENERAL SPECIFICATIONS All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE # 5: Contractor will be responsible for water tight tie-in to existing shingle roof. All Low slope roofing (Labor and Materials) must be guaranteed for minimum of 10 years for Shingles and 5 years for Flat deck and Provide owner with manufactures warrantee. NOTE # 6 COMPLY WITH ALL HURRICANE MITIGATION RETROFIT REQUIREMENTS. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all deteriorated fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. New wood to be primed and painted. Replace damaged continuous or spot vents for roof ventilation in soffits. Vent types should be the same style as to maintain uniformity. Soffit Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Fascia Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Spot Vent Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $__________ DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material SHINGLES: Remove existing roof cover including accessories and flashing and replace any damaged sheathing as per specifications below. Install one layer of # 30 felt nailed per Code, re-install required accessories, and vent stacks, flashings and edge drip. Install fungus resistant shingles carrying UL label on package and approved by MDC product Control Division; minimum pitch 2-1/2 /12. No Maximum. Install as per Florida Building Code. Provide inspection approval, release of lien, and 10 year warranty on labor, and life time warranty on shingles, shingle color selection by owner. Note: Shingles to be used Timberline Life Time Warranty. Shingles Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ BUILD-UP MEMBRANE: Remove existing roof cover including accessories and flashings and replace any damaged sheathing as per specifications below. Install one layer of # 75 base sheet nailed per Code and two layers of intermediate fiberglass sheets fully mopped with hot asphalt. Re-install required accessories, flashings, vent stacks and edge drip as needed. Top layer consist of a cap sheet granule surface modified membrane carrying UL label on package and MDC Product Control Division approval, fully mopped applied to entire roof surface. Install as per current code and manufacturer's specifications. Provide inspection approval, release of lien, and 5 year warranty. Provide Close cell ridge 1½” foam insulation. 11/2 Insulation Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ ROOF-LOW SLOPE/FLAT DECK, MODIFIED BITUMEN CAP SHEET: Remove existing low slope roof to bare sheathing, must be swept broom clean before new roofing is installed. Furnish and install #43 glass base sheet, over base sheet, install ply(s) #15 fiberglass felt, per UL requirements for combustibility of roofing assembly. Final roof cover must be Fire Rated SBS modified bitumen cap sheet. Installation of all products will be in strict accordance with Manufactures specifications and in compliance with MDC Product Control Division. Provide Close cell ridge 1½” insulation. 11/2 Insulation Sq. Ft._________, Price per Sq. Ft. $_________, Labor cost $________, Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies, _________, Price per unit. $_________, Labor cost $________, Cost $_________ Total Cost $___________ SECONDARY WATER BARRIER (Deck is T & G or Ship-Lap material) Apply a Self-Adhering Polymer Bitumen underlayment; such as Peal and Stick TM or equivalent, over the entire roof surface to cover all joints between ship-lap or tongue and grove decking PRIOR to installation of the roof covering underlayment and roof covering system. Apply 6" wide strips on all joints. Secondary water barrier Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________ Secondary water barrier Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Total Cost $___________ METAL ROOF STRAPS AND GABBLE END BRACING: Provide labor, materials and equipment to install Gable end bracing and metal roof straps if not existing. Gable Ends: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Metal Roof Straps or Double Clips: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Total Cost $___________ TOTAL LUMP SUM BID: $________________ Client: Shirley Morgan Address: 527 NW 95 Terr Miami FL 33150 1) Re-roof Complete: ROOFING GENERAL SPECIFICATION All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no butt joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material ROOFING GENERAL SPECIFICATIONS All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE # 5: Contractor will be responsible for water tight tie-in to existing shingle roof. All Low slope roofing (Labor and Materials) must be guaranteed for minimum of 10 years for Shingles and 5 years for Flat deck and Provide owner with manufactures warrantee. NOTE # 6 COMPLY WITH ALL HURRICANE MITIGATION RETROFIT REQUIREMENTS. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all deteriorated fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. New wood to be primed and painted. Replace damaged continuous or spot vents for roof ventilation in soffits. Vent types should be the same style as to maintain uniformity. Soffit Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Fascia Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Spot Vent Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $__________ DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material SHINGLES: Remove existing roof cover including accessories and flashing and replace any damaged sheathing as per specifications below. Install one layer of # 30 felt nailed per Code, re-install required accessories, and vent stacks, flashings and edge drip. Install fungus resistant shingles carrying UL label on package and approved by MDC product Control Division; minimum pitch 2-1/2 /12. No Maximum. Install as per Florida Building Code. Provide inspection approval, release of lien, and 10 year warranty on labor, and life time warranty on shingles, shingle color selection by owner. Note: Shingles to be used Timberline Life Time Warranty. Shingles Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ BUILD-UP MEMBRANE: Remove existing roof cover including accessories and flashings and replace any damaged sheathing as per specifications below. Install one layer of # 75 base sheet nailed per Code and two layers of intermediate fiberglass sheets fully mopped with hot asphalt. Re-install required accessories, flashings, vent stacks and edge drip as needed. Top layer consist of a cap sheet granule surface modified membrane carrying UL label on package and MDC Product Control Division approval, fully mopped applied to entire roof surface. Install as per current code and manufacturer's specifications. Provide inspection approval, release of lien, and 5 year warranty. Provide Close cell ridge 1½” foam insulation. 11/2 Insulation Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ ROOF-LOW SLOPE/FLAT DECK, MODIFIED BITUMEN CAP SHEET: Remove existing low slope roof to bare sheathing, must be swept broom clean before new roofing is installed. Furnish and install #43 glass base sheet, over base sheet, install ply(s) #15 fiberglass felt, per UL requirements for combustibility of roofing assembly. Final roof cover must be Fire Rated SBS modified bitumen cap sheet. Installation of all products will be in strict accordance with Manufactures specifications and in compliance with MDC Product Control Division. Provide Close cell ridge 1½” insulation. 11/2 Insulation Sq. Ft._________, Price per Sq. Ft. $_________, Labor cost $________, Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies, _________, Price per unit. $_________, Labor cost $________, Cost $_________ Total Cost $___________ SECONDARY WATER BARRIER (Deck is T & G or Ship-Lap material) Apply a Self-Adhering Polymer Bitumen underlayment; such as Peal and Stick TM or equivalent, over the entire roof surface to cover all joints between ship-lap or tongue and grove decking PRIOR to installation of the roof covering underlayment and roof covering system. Apply 6" wide strips on all joints. Secondary water barrier Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________ Secondary water barrier Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Total Cost $___________ METAL ROOF STRAPS AND GABBLE END BRACING: Provide labor, materials and equipment to install Gable end bracing and metal roof straps if not existing. Gable Ends: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Metal Roof Straps: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Total Cost $___________ TOTAL LUMP SUM BID: $________________ Client: Marcus Hall Address: 1315 NW 84 Terr Miami FL 33147 1) Re-roof Complete: ROOFING GENERAL SPECIFICATION All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no butt joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material ROOFING GENERAL SPECIFICATIONS All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE # 5: Contractor will be responsible for water tight tie-in to existing shingle roof. All Low slope roofing (Labor and Materials) must be guaranteed for minimum of 10 years for Shingles and 5 years for Flat deck and Provide owner with manufactures warrantee. NOTE # 6 COMPLY WITH ALL HURRICANE MITIGATION RETROFIT REQUIREMENTS. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all deteriorated fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. New wood to be primed and painted. Replace damaged continuous or spot vents for roof ventilation in soffits. Vent types should be the same style as to maintain uniformity. Soffit Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Fascia Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Spot Vent Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $__________ DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material SHINGLES: Remove existing roof cover including accessories and flashing and replace any damaged sheathing as per specifications below. Install one layer of # 30 felt nailed per Code, re-install required accessories, and vent stacks, flashings and edge drip. Install fungus resistant shingles carrying UL label on package and approved by MDC product Control Division; minimum pitch 2-1/2 /12. No Maximum. Install as per Florida Building Code. Provide inspection approval, release of lien, and 10 year warranty on labor, and life time warranty on shingles, shingle color selection by owner. Note: Shingles to be used Timberline Life Time Warranty. Shingles Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ BUILD-UP MEMBRANE: Remove existing roof cover including accessories and flashings and replace any damaged sheathing as per specifications below. Install one layer of # 75 base sheet nailed per Code and two layers of intermediate fiberglass sheets fully mopped with hot asphalt. Re-install required accessories, flashings, vent stacks and edge drip as needed. Top layer consist of a cap sheet granule surface modified membrane carrying UL label on package and MDC Product Control Division approval, fully mopped applied to entire roof surface. Install as per current code and manufacturer's specifications. Provide inspection approval, release of lien, and 5 year warranty. Provide Close cell ridge 1½” foam insulation. 11/2 Insulation Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ ROOF-LOW SLOPE/FLAT DECK, MODIFIED BITUMEN CAP SHEET: Remove existing low slope roof to bare sheathing, must be swept broom clean before new roofing is installed. Furnish and install #43 glass base sheet, over base sheet, install ply(s) #15 fiberglass felt, per UL requirements for combustibility of roofing assembly. Final roof cover must be Fire Rated SBS modified bitumen cap sheet. Installation of all products will be in strict accordance with Manufactures specifications and in compliance with MDC Product Control Division. Provide Close cell ridge 1½” insulation. 11/2 Insulation Sq. Ft._________, Price per Sq. Ft. $_________, Labor cost $________, Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies, _________, Price per unit. $_________, Labor cost $________, Cost $_________ Total Cost $___________ SECONDARY WATER BARRIER (Deck is T & G or Ship-Lap material) Apply a Self-Adhering Polymer Bitumen underlayment; such as Peal and Stick TM or equivalent, over the entire roof surface to cover all joints between ship-lap or tongue and grove decking PRIOR to installation of the roof covering underlayment and roof covering system. Apply 6" wide strips on all joints. Secondary water barrier Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________ Secondary water barrier Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Total Cost $___________ METAL ROOF STRAPS AND GABBLE END BRACING: Provide labor, materials and equipment to install Gable end bracing and metal roof straps if not existing. Gable Ends: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Metal Roof Straps or Double Clips: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Total Cost $___________ TOTAL LUMP SUM BID: $________________ Client: Antonia Figueroa Address: 5621 E 1 Ave Hialeah FL 33013 1) Re-roof Complete: ROOFING GENERAL SPECIFICATION All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no butt joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material ROOFING GENERAL SPECIFICATIONS All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE # 5: Contractor will be responsible for water tight tie-in to existing shingle roof. All Low slope roofing (Labor and Materials) must be guaranteed for minimum of 10 years for Shingles and 5 years for Flat deck and Provide owner with manufactures warrantee. NOTE # 6 COMPLY WITH ALL HURRICANE MITIGATION RETROFIT REQUIREMENTS. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all deteriorated fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. New wood to be primed and painted. Replace damaged continuous or spot vents for roof ventilation in soffits. Vent types should be the same style as to maintain uniformity. Soffit Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Fascia Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Spot Vent Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $__________ DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material SHINGLES: Remove existing roof cover including accessories and flashing and replace any damaged sheathing as per specifications below. Install one layer of # 30 felt nailed per Code, re-install required accessories, and vent stacks, flashings and edge drip. Install fungus resistant shingles carrying UL label on package and approved by MDC product Control Division; minimum pitch 2-1/2 /12. No Maximum. Install as per Florida Building Code. Provide inspection approval, release of lien, and 10 year warranty on labor, and life time warranty on shingles, shingle color selection by owner. Note: Shingles to be used Timberline Life Time Warranty. Shingles Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ BUILD-UP MEMBRANE: Remove existing roof cover including accessories and flashings and replace any damaged sheathing as per specifications below. Install one layer of # 75 base sheet nailed per Code and two layers of intermediate fiberglass sheets fully mopped with hot asphalt. Re-install required accessories, flashings, vent stacks and edge drip as needed. Top layer consist of a cap sheet granule surface modified membrane carrying UL label on package and MDC Product Control Division approval, fully mopped applied to entire roof surface. Install as per current code and manufacturer's specifications. Provide inspection approval, release of lien, and 5 year warranty. Provide Close cell ridge 1½” foam insulation. 11/2 Insulation Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ ROOF-LOW SLOPE/FLAT DECK, MODIFIED BITUMEN CAP SHEET: Remove existing low slope roof to bare sheathing, must be swept broom clean before new roofing is installed. Furnish and install #43 glass base sheet, over base sheet, install ply(s) #15 fiberglass felt, per UL requirements for combustibility of roofing assembly. Final roof cover must be Fire Rated SBS modified bitumen cap sheet. Installation of all products will be in strict accordance with Manufactures specifications and in compliance with MDC Product Control Division. Provide Close cell ridge 1½” insulation. 11/2 Insulation Sq. Ft._________, Price per Sq. Ft. $_________, Labor cost $________, Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies, _________, Price per unit. $_________, Labor cost $________, Cost $_________ Total Cost $___________ SECONDARY WATER BARRIER (Deck is T & G or Ship-Lap material) Apply a Self-Adhering Polymer Bitumen underlayment; such as Peal and Stick TM or equivalent, over the entire roof surface to cover all joints between ship-lap or tongue and grove decking PRIOR to installation of the roof covering underlayment and roof covering system. Apply 6" wide strips on all joints. Secondary water barrier Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________ Secondary water barrier Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Total Cost $___________ METAL ROOF STRAPS AND GABBLE END BRACING: Provide labor, materials and equipment to install Gable end bracing and metal roof straps if not existing. Gable Ends: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Metal Roof Straps: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Total Cost $___________ TOTAL LUMP SUM BID: $________________ Client: Patricia Ridgeway Address: 26412 SW 134 Ct Naranja FL 33032 1) Re-roof Complete: ROOFING GENERAL SPECIFICATION All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no butt joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material ROOFING GENERAL SPECIFICATIONS All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE # 5: Contractor will be responsible for water tight tie-in to existing shingle roof. All Low slope roofing (Labor and Materials) must be guaranteed for minimum of 10 years for Shingles and 5 years for Flat deck and Provide owner with manufactures warrantee. NOTE # 6 COMPLY WITH ALL HURRICANE MITIGATION RETROFIT REQUIREMENTS. SPECIFICATIONS FOR ROOF DECK REPAIRS: Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replace all deteriorated fascia and soffits to match existing. No splicing shall be less than 5 ft. in length. New wood to be primed and painted. Replace damaged continuous or spot vents for roof ventilation in soffits. Vent types should be the same style as to maintain uniformity. Soffit Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Fascia Ln. Ft. 50_________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Spot Vent Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $__________ DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tong & grove as per code. Include in your bid first 100 Sq. Ft. of decking material SHINGLES: Remove existing roof cover including accessories and flashing and replace any damaged sheathing as per specifications below. Install one layer of # 30 felt nailed per Code, re-install required accessories, and vent stacks, flashings and edge drip. Install fungus resistant shingles carrying UL label on package and approved by MDC product Control Division; minimum pitch 2-1/2 /12. No Maximum. Install as per Florida Building Code. Provide inspection approval, release of lien, and 10 year warranty on labor, and life time warranty on shingles, shingle color selection by owner. Note: Shingles to be used Timberline Life Time Warranty. Shingles Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ BUILD-UP MEMBRANE: Remove existing roof cover including accessories and flashings and replace any damaged sheathing as per specifications below. Install one layer of # 75 base sheet nailed per Code and two layers of intermediate fiberglass sheets fully mopped with hot asphalt. Re-install required accessories, flashings, vent stacks and edge drip as needed. Top layer consist of a cap sheet granule surface modified membrane carrying UL label on package and MDC Product Control Division approval, fully mopped applied to entire roof surface. Install as per current code and manufacturer's specifications. Provide inspection approval, release of lien, and 5 year warranty. Provide Close cell ridge 1½” foam insulation. 11/2 Insulation Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Total Cost $___________ ROOF-LOW SLOPE/FLAT DECK, MODIFIED BITUMEN CAP SHEET: Remove existing low slope roof to bare sheathing, must be swept broom clean before new roofing is installed. Furnish and install #43 glass base sheet, over base sheet, install ply(s) #15 fiberglass felt, per UL requirements for combustibility of roofing assembly. Final roof cover must be Fire Rated SBS modified bitumen cap sheet. Installation of all products will be in strict accordance with Manufactures specifications and in compliance with MDC Product Control Division. Provide Close cell ridge 1½” insulation. 11/2 Insulation Sq. Ft._________, Price per Sq. Ft. $_________, Labor cost $________, Felt Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________, Cost $_________ Other roof supplies, _________, Price per unit. $_________, Labor cost $________, Cost $_________ Total Cost $___________ SECONDARY WATER BARRIER (Deck is T & G or Ship-Lap material) Apply a Self-Adhering Polymer Bitumen underlayment; such as Peal and Stick TM or equivalent, over the entire roof surface to cover all joints between ship-lap or tongue and grove decking PRIOR to installation of the roof covering underlayment and roof covering system. Apply 6" wide strips on all joints. Secondary water barrier Ln. Ft. _________, Price per Ln. Ft. $_________, Labor cost $________ Secondary water barrier Sq. Ft. _________, Price per Sq. Ft. $_________, Labor cost $________ Total Cost $___________ METAL ROOF STRAPS AND GABBLE END BRACING: Provide labor, materials and equipment to install Gable end bracing and metal roof straps if not existing. Gable Ends: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Metal Roof Straps or Double Clips: Material cost $_________ Labor Cost $__________Total Cost $__________ $___________ Total Cost $___________ TOTAL LUMP SUM BID: $________________
Technical Certification:
Roofing Contractor

Commodities
Code Description
770 ROOFING
Solicitation Package/Addendums
Type File Name
Package MCC_7360_RPQ_HLMP-2023-ROOF.pdf