Solicitation Details - MCC 7360 RPQ I190015-R
Back To Search SolicitationsTitle:
DPCC Roof Replacement and New Drainage Installation
Opening Date:
9/3/2024 2:00:00 PM
Announcement Info:
Scope of Work:
(Contractor must obtain and submit all permits prior to performing any work).
The scope of work consists of, but is not limited to, furnishing all supervision, labor, material, services, equipment, permits, and testing necessary to successfully perform work required for demolition/new construction as indicated and described on the approved plans (Miami-Dade Building Department Process No. C2022123476) and specifications as noted on the approved plans. Bid price is to include purchasing, removal and replacement of the specified materials as described below and identified in the construction documents, and all related permit fees and permitting expenses related therewith. Contractor must obtain and submit all permits prior to performing any work.
Prospective bidder shall carefully examine the site of the work and be satisfied as to all observable conditions. Bidder shall be responsible for measuring, calculating, and performing adequate field verification takeoffs for the scope of work. Bid price is to include the removal and proper disposal of all work-related debris. The scope includes but is not limited to the following:
a) Re-roof of the existing High Roof “A” on the East end the existing structure;
b) Re-roof of the existing High Roof “B” on the North-Center of the existing structure;
c) Re-roof of the existing High Roof “C” at the Center on the existing structure;
d) Re-roof of the existing High Roof “D” at the West end of the existing structure;
e) Re-roof of the existing Low Roof “E” at the South of the existing structure;
f) Re-roof of the existing Low Roof “F” at the South-Center of the existing structure;
g) Adjust existing roof slopes as described above and add scuppers in compliance with current Florida Building Code.;
h) Removal, re-grade, and finish to new elevations of earth berm at the East Side of the Atrium on East Wing the existing building.
i) Repair cracks on miscellaneous concrete walls throughout existing facility and apply waterproofing.
j) Paint all wall surfaces that are affected by the re-roofing and other repairs.
k) Build Antenna Distribution Panel housing enclosure.
At the close of the project, submit all documentation, warranty, equipment specifications, etc.
This project falls under the jurisdiction of the Miami-Dade County Building Department. The permit dry run approved plans process number with the Miami-Dade County Building Department is C2022123476.
Restrictions/Requirements:
a) Alternate Manufacturer meeting or exceeding all the specification and requirements, including Warranty will be accepted as long as they
have current MDC NOA. Contractor to submit complete product shop-drawing for final approval. The specifications indicate a Johns
Manville “80 mil” TPO. As per the NOA, there is a maximum 502.5psf Wind Uplift.
b) Spec Section 07 54 23, wind uplift pressures are to be followed; 2) Refer to S-3.0, Note: Consider only the value of Zone 3 (-167.0 PSF)
for all areas for all roofing design; and 3) A-401 uplift wind pressures shown were reduced.
c) Opening for cables penetrating the CBE shall be capped with 1/4" thk. aluminum standard closure plate, screwed to CBE, with rubber
sleeves filled with sealant after cables are installed. Please refer to photos on D / A-207 showing cable penetration to existing connection
boxes. Use similar detail. Coordinate with MDC Vendor that will be responsible for communication cable management.
d) The contactor will be responsible to install and maintain proper critical barriers. Contractor shall provide 24 hours’ notice to building
management prior to setting up or relocating barriers so any cars can be moved and tenants notified. Work should be completed in
stages to ensure that areas of work are clean and safe at all times, as this is an occupied structure.
e) The contractor shall perform all construction work related activity within designated off limit/staging areas designated but the Building
Manager.
f) The facility is open 24/7 and the gates are opened from 6 A.M. until 6 P.M. Monday through Friday except weekends and holidays.
Access can be granted by calling 305-596-8000 or using the telecom at the entrance off of SW 87th Ave. Work can be done during
normal business hours and on weekends and holidays as detailed in the Working Hours section of Bid Documents’ Special Provisions.
g) All personnel must wear company uniforms when on-site.
h) All personnel will be responsible to provide a clean background check. The contractor will be responsible for conducting their own
background checks at their own expense, to be provided to Miami-Dade County.
i) Access into the facility is restricted therefore the contractor should furnish “Porta Potties” for staff working on site.
j) Care should be taken to protect walls and windows of the facility.
k) Deliveries should be done during normal business hours.
l) An asbestos survey was completed and no asbestos was detected. The notice of Demolition or Asbestos Renovation was already
completed and submitted by the County and will not be required from the GC.
m) Contractor will submit, to the County, its documents and drawings OR confirmation that its installation is in accordance with Miami-Dade
County’s bid/contract documents. This will be provided to the roofing manufacturer and its loss control consultant.
n) The lowest responsive, responsible Bidder must demonstrate, when requested by County after Bid Opening, that it meets the Required
Experience/Qualifications detailed in Bid Documents’ RPQ Comments and Special Provisions.
The project is located at 5680 SW 87th Ave, Miami, FL 33173.
The estimated Construction cost is $1,637,999.84. This estimate includes $39,831.71 estimated permit fees. The Bid shall consist of the Base Bid amount (Lum Sum) inclusive of all permit fees and excluding Contingency.
NOTE: There are no Dedicated Allowances on this Project. There is a 10% Contingency on this Project
Technical Certification:
Building contractor
General Building Contractor
Roofing Contractor
Commodities
Code | Description |
---|---|
96820 | BUILDING CONSTRUCTION |
96842 | GENERAL CONSTRUCTION |
770 | ROOFING |
Solicitation Package/Addendums
Type | File Name |
---|---|
Package | MCC_7360_RPQ_I190015-R.pdf |
Addendum | I190015-R_AddendumNo1_w_Attachments.pdf |
Addendum | I190015-R_AddendumNo2.pdf |
Addendum | I190015_R_AddendumNo3.pdf |
Addendum | I190015-R_AddendumNo4.pdf |
Addendum | I190015-R_AddendumNo5_w_Attachments.pdf |
Addendum | I190015-R_AddendumNo6.pdf |