Construction projects new connection

A Sewer Service Connection as first time is for properties with no construction or remodeling that are in WASD service area and an existing sewer lateral has been found, and you are required to connect to WASD sewer facilities as First Time connection.

How to Find the Location of the Sewer Lateral

Please check Request Lateral Location or As-built to verify if there are sewer lateral at the property before requesting your Sewer Service Connection.

To connect your property to the WASD sewer system, you will need to click on VF or Ordinance Letter to submit your request.

Residents in Miami-Dade County whose property currently use a septic tank and are connecting to a sewer main with an existing later should be prepared to:

 

Note: In accordance with ARTICLE V. - Water and Sewer Connection Sec. 32-79 of the Miami-Dade County Code, WASD allows 90 days after the water and sewer connection charges payment date before it begins the process to start sewer billing.

If you are changing a property's previous type of use (example: building multiple residential units on land that was previously zoned for single-family use), please note the following: in addition to any permits you would need for making the proposed change, as well as all of the items listed below, WASD would need the Sewage Flow Allocation Letter to reflect any additional gallonage demand created by the change. WASD will determine if the sewer main fronting the property is of sufficient size for the additional gallonage demand and if it provides complete property frontage.

Read more about Sewer Capacity Certification

Phone Number(s)

  • Construction Complaint Unit (non-billing)
    786-552-8970786-552-8970

Locations and Hours

Water and Sewer

Jay Fink, Director

Water and Sewer Douglas Office
3071 SW 38th Ave, Miami, FL 33146
305-665-7477

Contact UsRequest Public Records