Hurricane Irma
As we continue our recovery and cleanup efforts, please visit the Emergency website for the latest information on openings and closings in Miami-Dade County.
Construction / CSBE
Construction/CSBE projects and the review status of each are listed below. A Verification of Availability form is available below (when applicable) and may be submitted any time prior to the posting of the SBD Final Recommendation. Simply download form accompanying the applicable project and return as instructed. Comments on any project may be sent to [email protected].
Date Received |
Project Number |
Project Title |
Project Package |
Dept. RCMD |
SBD Project Breakout |
Additional Information |
Verification of Availability |
SBD Analysis & RCMD |
SBD Final RCMD |
Comments |
7/18/24 |
P20119 |
Various Wellfields and Pumping Facilities Multiple Roof Replacement |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
7/17/24 |
TP-0000018108 |
Metromover Fire Panel Upgrade |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
6/4/2024 |
S-973 |
GOB Basin 0107 (Wastewater Improvements) |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/28/24 |
C39520119001 |
North Trail Park - Splash Pad, Playground Replacement, and ADA Compliance
|
SBE/Cons - No Measure |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/21/24 |
C40180019002AA |
Concord Park Playground Renovation
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/7/24 |
RPQ No. HLMP-23-Shutter |
Hurricane Loss Mitigation Program (HLMP)
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/7/24 |
RPQ No. HLMP-2023-ROOF |
Hurricane Loss Mitigation Program (HLMP)
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
4/26/24 |
DRM-BBWQ2-2024 |
Biscayne Bay Water Quality Characterization and Pollution Reduction, Phase II
|
SBE/Cons - 1.4% Goal |
N/A | N/A | N/A | 1.4% Goal - SBE/Cons | Under Review | N/A | |
4/24/24 |
20240071 |
Intersection Improvements on SW 162nd Avenue & SW 104th Street
|
SBE/Cons - 11.63% Goal |
N/A | N/A | N/A | 11.63% Goal - SBE/Cons | Under Review | N/A | |
4/9/24 |
S-978 |
Central District Wastewater Treatment Plant Chlorination Facility Hardening
|
SBE/Cons - 9.48% Goal |
N/A | N/A | N/A | 9.48% Goal - SBE/Cons | Under Review | N/A | |
3/25/24 |
S-15152 |
WW Service to Commercial Properties - Green Tech Corridor - S-5 -Gravity, Force Mains and Water Mains
|
SBE/Cons - 2.66% Goal |
N/A | N/A | N/A | 2.66% Goal - SBE/Cons | Under Review | N/A | |
3/12/24 |
RPQ No. TP-0000021555 |
Traction Power Switchgear Replacement
Project Phase IV |
SBE/Cons - No Measure |
N/A | N/A | N/A | No Measure - SBE/Cons | Under Review | N/A | |
2/20/24 |
V008F-1 |
MIA Cc F Refurbishment - Checkpoint Relocation Imrpovement Works Demolition Scope
|
SBE/Cons - No Measure |
N/A | N/A | N/A | Under Review - SBE/Cons | Under Review | N/A | |
2/14/24 |
20230196 |
North Miami Ave. Bridge No. 847035 Replacement Over C-8 Canal
|
SBE/Cons - 1.28% Goal |
N/A | N/A | N/A | 1.28% Goal - SBE/Cons | Under Review | N/A | |
10/23/23 |
20230146 |
Paving Markings Contract
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review - SBE/Cons | Under Review | N/A | |
10/18/23 |
RPQ No. MDFR-785-VAR-FA |
MDFR Fire Alarm System upgrades - 2023 Florida Legislative Funding
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review - SBE/Cons | Under Review | N/A | |
10/17/23 |
TAC-N-CA-124A |
AA MIA Next Gen Kiosk at Terminal D 2nd Floor
|
SBE/Cons - No Measure |
N/A | N/A | N/A | No Measure - SBE/Cons | Under Review | N/A | |
10/17/23 |
TAC-N-CA-030A |
The Bar Refurbishment and Extensions S Terminal Food Ct. Post Security
|
SBE/Cons - 14.00% Goal |
N/A | N/A | N/A | 14.00% Goal - SBE/Cons | Under Review | N/A | |
10/17/23 |
W-955 |
South West Wellfield Electrical Distribution Improvements for Raw Water Well
|
SBE/Cons - 12.25% Goal |
N/A | N/A | N/A | 12.25% Goal - SBE/Cons | Under Review | N/A | |
10/17/23 |
S-20076 |
Two-Year County-Wide Contract for Rehabilitation of Sanitary Sewer by the Cure-in-Place Pipe
(CIPP) Method with County Option to Renew for an Additional One-Year
|
SBE/Cons - No Measure |
N/A | N/A | N/A | No Measure - SBE/Cons | Under Review | N/A | |
10/17/23 |
20230169 |
Historic Bridge No. 874129 and 874130 Rehabilitation and Painting |
SBE/Cons - 3.5% Goal |
N/A | N/A | 3.5% Goal - SBE/Cons | Under Review | N/A | ||
10/13/23 |
TP-0000017936 |
Installation of Electrical Vehicle Charging Stations at the Lehman Center |
SBE/Cons - 17.2% Goal |
N/A | N/A | N/A | 17.2% Goal - SBE/Cons | Under Review | N/A | |
10/10/23 |
20230197 | Biscayne Shores Pump Station Retrofit Nos. 109 & 110 and MIC Stormwater Pump Station Trash Rack Repair |
SBE/Cons - 1.43% Goal |
N/A | N/A | N/A | 1.43% Goal - SBE/Cons | Under Review | N/A | |
9/29/23 |
W-16904 |
CDWWTP New Materials Management Building and Storage Areas |
SBE/Cons - 10.64% Goal |
N/A | N/A | N/A | 10.64% Goal - SBE/Cons | Under Review | N/A | |
9/25/23 |
LC-RENO-23 |
Roof Replacement, and New Impact Resistant Windows, Doors and Storefront at the Lemon City Branch Library |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review - SBE/Cons | Under Review | N/A | |
9/15/23 |
C23-MDPLS-02-ML-ESP |
Construction Services for Exterior improvements and Interior Renovation of the Miami Lakes Branch Library |
SBE/Cons - 27.33% Goal |
N/A | N/A | N/A | 27.33% Goal - SBE/Cons | Under Review | N/A | |
9/15/23 |
007-E15/02-NOVA |
Pre-Construction Assessment at the Amelia Earhart Park, located at 200 W 74 PL, on behalf of Parks, Recreation and Open Spaces (PROS) |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | Under Review | N/A | |
9/6/23 |
20233HBPSWR |
Homestead Bayfront Park - Sewage Treatment Replacement | SBE/Cons - Under Review | N/A | N/A | N/A | Under Review | Under Review | N/A | |
9/5/23 |
MCC-Y145A (MCC-9-18) |
Miami-Homestead General Aviation Aiport (Security Fence Gate) | DBE Goal - 54% | N/A | N/A | N/A | 54% Goal - DBE | Under Review | N/A | |
8/24/23 |
50030115001 |
Continental Park - Site Remediation Project |
SBE/Cons - 1.5% Goal |
N/A | N/A | N/A | 1.5% Goal - SBE/Cons | Under Review | N/A | |
8/24/23 |
601805-20-004 |
JL (Joe) and Enid W. Demps Park Playground Replacement Rebid |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | Under Review | N/A | |
8/23/23 |
Arena-8-23-2023-C |
Construction Manager at Risk Services - Removal and Replacement of Seating Bowl LED Displays and Broadcasting Enhancements Project |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/21/23 |
S-16302 |
Dredging of the Southwest Wellfield South Lagoon to Remove Calcium Carbonate Residual |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | No Measure | Under Review | N/A | ||
8/18/23 |
S-20074 |
Two-Year Countywide Contract for Removal and Replacement of Sanitary Sewer Gravity mains, with County Option to Renew for an Additional Two Years on a Yearly Basis |
SBE/Cons - 6% Goal |
N/A | N/A | 6% Goal - SBE/cons | Under Review | N/A | ||
8/15/23 |
C23-MDPLS-01-GOB-ESP |
Renovation of the South Dade Regional Libray |
SBE/Cons - 27% Goal |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/15/23 |
TAC-R #CA-074A |
AAR Hangar Expansion |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/15/23 |
TAC-N BA-021B |
FOF Red Road Tenant Improvement |
SBE/Cons - 12.21% Goal |
N/A | N/A | N/A | 12.21% Goal - SBE/Cons | Under Review | N/A | |
8/14/23 |
RPQ No. 20230159 |
Roadway Resurfacing - Multiple Sites |
SBE/Cons - Trade Set-Aside |
N/ | N/A | N/A | Trade Set-Aside - SBE/Cons | Under Review | N/A | |
8/14/23 |
RPQ No. 20230158 |
Roadway Resurfacing - Multiple Sites |
SBE/Cons - Trade Set-Aside |
N/A | N/A | N/A | Trade Set-Aside - SBE/Cons | Under Review | N/A | |
8/9/23 |
S-967 |
Site Preparation (NT-2B) North District Wastewater Treatment Plant |
SBE/Cons - 2.99% Goal |
N/A | N/A | 2.99% Goal - SBE/Cons | Under Review | N/A | ||
7/31/23 |
RPQ No. MDFR-776-VAR-GC |
MDFR Roof and OPenings Replacement (Stations |
SBE/Cons - No Measure (Federally Funded) |
N/A | N/A | N/A | No Meassure (Federally Funded) - SBE/Cons | Under Review | N/A | |
7/28/23 |
X010A |
Miami/Opa-Locka Executive Airport (OPF) Run Up Pad |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
7/28/23 |
X005A |
OPF Blast Fence |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
7/27/23 |
C23-MDPLS-01-GOB-ESP |
Request to Advertise for Construction Services for the Interior Renovation of the South Dade Regional Library |
SBE/Cons - 27% Goal |
N/A | N/A | N/A | 27% Goal - SBE/Cons | Under Review | N/A | |
7/21/23 |
2022-010 (under DB23SP01) |
Design-Build Services for the New Cruise Terminal G Program |
SBE/Cons - 8.92% Goal |
N/A | N/A | 8.92% Goal - SBE/Con | Under Review | N/A | ||
7/21/23 |
RPQ No. TP-0000017889 |
Upgrade Chiller Units at William Lehman Center |
SBE/Cons - 10% Goal |
N/A | N/A | N/A | 10% Goal - SBE/Cons | Under Review | N/A | |
7/20/23 |
Arena-7-20-2023-D (WA 2024-4HAC) |
Event Level Executive Rooms Refresh |
SBE/Cons - 13% Goal |
N/A | N/A | N/A | 13% Goal - SBE/Cons | Under Review | N/A | |
7/20/23 |
Arena-7-20-2023-C (WA 2024_3)
|
Event Level Restroom Refresh |
SBE/Cons - 9% Goal |
N/A | N/A | N/A | 9% Goal - SBE/Cons | Under Review | N/A | |
7/20/23 |
Arena-7-20-2023-B (WA 2024-2HAC)
|
Event Level Weight Room Refresh |
SBE/Cons - 13% Goal |
N/A | N/A | N/A | 13% Goal - SBE/Cons | Under Review | N/A | |
7/20/23 |
Arena-7-20-2023-A (WA 2024-1HAC)
|
Mez Level Offices Restrooms Refresh |
SBE/Cons - 11% Goal |
N/A | N/A | N/A | 11% Goal - SBE/Cons | Under Review | N/A | |
7/19/23 |
S-16030 |
Upgrade of Pump Station 0300 |
SBE/Cons - 2% Goal |
N/A | N/A | N/A | 2% Goal - SBE/Cons | Under Review | N/A | |
6/28/23 |
TAC-N CA-073A |
PS MIA at Bldg. 874 – The Private Suite MIA, LLC, Restoration of Old |
SBE/Cons - 10% Goal |
N/A | N/A | N/A | 10% Goal - SBE/Cons |
Under Review |
N/A | |
6/22/23 |
20230123 |
Drainage Improvements Multiple Sites |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
6/20/23 |
C50200121002 |
Ferguson Park - Fitness Court and Shelter |
SBE/Cons - 6.06% Goal |
N/A | N/A | N/A | 6.06%Goal - SBE/Cons |
Under Review |
N/A | |
6/16/23 |
MCC-AB050A |
MIA - Building 3050 Demolition - STE Enabling |
SBE/Cons - Trade Set-Aside |
N/A | N/A | N/A | Trade Set-Aside - SBE/Cons |
Under Review |
N/A | |
6/15/23 |
TAC-N-BA-088A |
Aero Miami 1/LATAM Secutiry Camera Update ar Bldg. 709 & 710 |
SBE/Cons - 16% Goal |
N/A | N/A | N/A | 16% Goal - SBE/Cons |
Under Review |
N/A | |
6/15/23 |
RPQ No. 20230118 |
Intersection Improvements Along NW 18th Ave. from NW 62nd St to NW 71 St. |
SBE/Cons - 14.49% Goal |
N/A | N/A | N/A | 14.49% Goal - SBE/Cons |
Under Review |
N/A | |
6/7/23 |
RPQ No. 284052 |
Multiple Parks Swimming Pool and Splashpad Repairs - North of Tamiami Trail |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
6/7/23 |
RPQ No. 284053 |
Multiple Parks Swimming Pool and Splashpad Repairs - South of Tamiami Trail |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/31/23 |
ZC2023ATBR |
Zoo Miami - Aviary Temple Building Renovations |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/30/23 |
592801-17-003 GOB ESP |
Chuck Pezoldt Park Recreation Center & Library |
SBE/Con - Trade Set-Aside |
N/A | N/A | N/A | Set-Aside | Under Review | N/A | |
5/24/23 |
P16062 |
Upgrade of Sewage Station #0064 & Installation pf 8inch FM From PS-0064 running north on Halissee St. |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/24/23 |
282487 |
Multiple Parks North of Tamiami Trail - Court Resurfacing |
SBE/Con – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
5/24/23 |
282488 |
Multiple Parks South of Tamiami Trail - Court Resurfacing |
SBE/Con – No Measure |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/23/23 |
P0272 |
LineStop for 42 Inch CIP at Pump Station No. 2 |
SBE/Con – No Measure |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/22/23 |
RPQ No. MDFRD-767-10-C |
Concrete Apron Removal and Replacement at MDFR Station 10 |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/17/23 |
401403-19-001 |
Boardwalk Renovation and Nature Center Signage |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/9/23 |
W-945 |
Alexander Orr Jr. Water Treatment Plant Lime Slaker Replacement Project |
SBE/Con – 2.20% Goal |
N/A | N/A | N/A | 2.20% SBE-Con Goal |
Under Review |
N/A | |
5/4/23 |
RPQ No. 20230013 |
Bridge Replacement at SW 136th St Over Canal C-100A (Bridge No. 874420) |
SBE/Con – 2.9% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/1/23 |
C2023CDESHR (50250120002) |
Charles Deering Estate – Stone House Repairs |
SBE/Cons – 10.48% SBE-Con |
N/A | N/A | N/A | 10.48% SBE-Con Goal | N/A | ||
4/27/23 | SURFWHLOAD-DOCK | Surfside Evidence Warehouse Loading Dock repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
4/20/23 | TAC-N-AC129B Con | KOPF Acquisitions Phase 1B |
SBE/Cons – 7.68% Goal |
N/A | N/A |
7.68% SBE-Con Goal 10% CWP Goal |
N/A | |||
4/20/23 | MDFRD-757-23-RW | MDC Fire Rescue HMGP Wind Retrofit Project at Station 23 MDFRD-757-23-RW |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/19/23 | 20230072 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230071 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230070 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230069 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230068 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230067 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/18/23 | TAC-N-AC129A Con | KOPF Acquisitions Phase 1A |
SBE/Cons – 11.44% Goal |
N/A | N/A | N/A | 11.44% SBE-Con Goal | N/A | ||
4/17/23 | CIP227A-DTPW22-CT | South Miami-Dade Electric Bus Maintenance Facility |
SBE/Cons – 20.00% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
4/7/23 | RPQ No. MDFRD-757-23-RW | MDC Fire Rescue HMGP Wind Retrofit Project at Station 23 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | Under Review |
Under Review |
N/A | ||
4/7/23 | 22230223001 | Haulover Park - Pickleball Courts |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | 20.44% SBE-Con Goal | N/A | |||
3/31/23 | IRP338-DTPW23-CT | Construction Services for the Third Rail Isolation Disconnect Switch Replacement |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
3/30/23 | TP-0000008233-R | Lehman Curve N41 Realighnment |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
3/28/23 | TAC-N-BA-086A | Aero Miami LATAM Fire Suppression and updates at Warehouse Bldg. 709 |
SBE/Cons – 9% Goal |
N/A | N/A | N/A |
9% SBE-Con Goal 10% CWP Goal |
N/A | ||
3/28/23 | 019-E15/03-SCS (E15-RER-03) | Tank Closure Assessment Report (TCAR) at the Coral Way Bus Maintenance Facility |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/27/23 | RPQ No. 2023GRPBR | Greynolds Park – Bridge Repairs |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
13.07% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
3/24/23 | RPQ No. 18497-23 | DSWM Repair of Hoppers, Chutes and Compactors at Northeast Transfer Station |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/24/23 | RPQ No. 18496-23 | DSWM Repair of Hoppers, Chutes and Compactors at Central Transfer Station |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/24/23 | 2022-MDFR-CR-OR-HQ | MDFR Crandon Park Ocean Rescue Headquarters |
SBE/Cons – 10% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/24/23 | 20220132 | Intersection Improvements to NE 2 Ave. and NE 36 St. |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
3/20/23 | RPQ No. 76986 | PHCD WORK-ORDER CONTRACT 2023 – South Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/20/23 | RPQ No. 76987 | PHCD WORK-ORDER CONTRACT 2023 – Central Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/20/23 | RPQ No. 76988 | PHCD WORK-ORDER CONTRACT 2023 – North Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/16/23 | RPQ No. 20230052 | Intersection Improvements Contract – Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 and Trade Set-Aside 10.00% CWP Goal |
N/A | ||
3/16/23 | GS-35F-364BA | LCP Tracker for SBD |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/16/23 | S-976 | HVAC Improvements Package “D” – Main Switchgear Building #2 and Polymer Building |
SBE/Cons – 10.13% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
3/13/23 | WAP-056 | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
3/10/23 | DRM-MCH-2023 | Secondary Canal Maintenance Mechanical Harvesting of Drainage Canals |
SBE/Cons – 6% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/10/23 | 60060318001 GOB ESP | South ridge Park- Community Aquatic Center |
SBE/Cons – 11.80% Goal |
N/A | N/A |
11.80% SBE-Con Goal 10% CWP Goal |
N/A | |||
3/10/23 | 20220215 | Bridge Repair at SW 57 Avenue - Bridge No. 874251 |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | N/A | |||
3/8/23 | MDFRD-754-VAR | HMGP - MDFR Roof and Openings Replacement |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
3/8/23 | CIP271-DTPW23-CT | Metrorail Martin Luther King (MLK) Parking Garage Emergency Demolition |
SBE/Cons – 20% Goal |
N/A | N/A | N/A |
20% SBE-Con goal 10.00% CWP goal |
N/A | ||
3/7/23 | 20220176 | Bear Cut Bridge No. 874544 Rehab |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
2/21/23 | RPQ No. 20230030 | Guardrail – Multiple Sites |
No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
2/17/23 | S-20069 | CDWWTP – Plant 1 and 2 Primary Clarifiers Rehab (CD 2.07 and 2.08) |
SBE/Cons – 7.82% Goal |
N/A | N/A | N/A | 7.82% SBE - Con goal | N/A | ||
2/16/23 | TAC-N-AB-011A | Delta Air Lines Sky Club Expansion at Concourse H |
SBE/Cons – 15.11% Goal |
N/A | N/A |
15.11% SBE-Con Goal 10% CWP Goal |
N/A | |||
2/14/23 | TAC-N-BA-037A | Homestead Executive Jet Center at X51 New Aircraft Storage Hangar & Associated Ramp/Apron |
SBE/Cons – 15.11% Goal |
N/A | N/A |
16% SBE-Con Goal 10% CWP Goal |
N/A | |||
2/13/23 | WAP-055 | Weatherization Assistance Program |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | Under Review |
Under Review |
N/A | ||
2/10/23 | MCC AC007A (MCC-9-18) | Building 3030 1st Floor D Wing Tenant Relocation MCC AC007A (MCC-9-18) |
SBE/Cons– Trade Set-Aside |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
2/3/23 | TAC-N-AB-081A | Johnston and Murphy Refurb Project |
SBE/Cons – 15% Goal |
N/A | N/A | 15% SBE-Con Goal | N/A | |||
1/31/23 | S-16376 | Lateral Expansion Program |
SBE/Cons – 16.34% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
1/27/23 | RPQ No. 20230013 | Bridge Replacement at SW 136TH St Over Canal C-100A |
SBE/Cons – 2.14% Goal |
N/A | N/A | N/A | 2.24% SBE-Con Goal | N/A | ||
1/26/23 | ZC2023MD | Zoo Miami – Monorail Removal and Renovation |
SBE/Cons – 5.80% SBE- Con Goal |
N/A | N/A | N/A | 5.80% SBE-Con Goal | N/A | ||
1/25/23 | RPQ No. 76721 | PHCD Vacant Unit Preparations 2023 – Contract 1 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | N/A | |||
1/25/23 | RPQ No. 76722 | PHCD Vacant Unit Preparations 2023 – Contract 2 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | N/A | |||
1/25/23 | DB23-PHCD-01 | Development of Senior Housing at the Westchester Regional Library Site |
SBE/Cons – 20% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
1/24/23 | W-951 | Alexander Orr Water Treatment Plant West High Service Pump Room Electrical Upgrade |
SBE/Cons – 10.42% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
1/24/23 | TAC-N-BA-110A | Enterprise Holdings – Signage Replacement and Wayfinding |
SBE/Cons – 0% Goal (Justification from the tenant) |
N/A | N/A | N/A | No Measure | N/A | ||
1/17/23 | W220034 | SBE/Cons – 5.96% Goal |
SBE/Cons – 5.96% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
1/13/23 | S-985 | Green Technology Corridor Wastewater Collection, Transmission and Water Distribution System Expansion for S-2 Basin; Phase 2, West side of NW 27th Avenue |
SBE/Cons – 6% Goal |
N/A |
7.50% SBE-Con Goal 10.00% SBE-CWP Goal |
N/A | ||||
1/12/23 | PDC-W22002 (FEMA No. 33489) | Roof Replacement/Waterproofing of MDPD Kendall Station 5 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
1/11/23 | RPQ No. 76609 | 100% SURTAX Funded Project New Construction of One CBS One Story Duplex (2 dwelling units) |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
1/5/23 | 2022-017 | Seaboard Cargo Yard Sewer Main Replacement |
SBE/Cons – 9.28% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
12/22/22 | 21300117001 GOB ESP | Amelia Earhart Park Recreation Center and Park Improvements |
SBE/Cons – 7.00% Goal |
N/A | N/A | N/A |
10.09% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
12/22/22 | TAC-N-AB-028A | Jackson Square/ Chick-Fil-A |
SBE/Cons – 25% Goal |
N/A | N/A | N/A |
25% SBE-Con Goal 10% CWP Goal |
N/A | ||
12/21/22 | TAC-N-AC-130A (AC-130A) | DHL MIA Hub Bonded holds Mezzanine Expansion at Bldg. 716 |
SBE/Cons – 4.37% Goal |
N/A | N/A | N/A | 4.37% SBE-Con Goal | N/A | ||
12/21/22 | WAP-054 | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
12/21/22 | S-949A | Ocean Outfall Legislation Program, Construction Package CT-3C-A, Electrical Distribution Building 2 (EDB-2) |
SBE/Cons – 7.35% Goal |
N/A | N/A | 7.35% SBE-Con Goal | N/A | |||
12/16/22 | RPQ No. TP 0000011620 | Roof Replacement at Passenger Transportation Regulatory Division Building |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | Under Review |
Under Review |
N/A | ||
11/14/22 | RPQ 75085 | Biscayne Plaza Exterior Repairs and New Generator |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | N/A | |||
10/31/22 | PDF-W20003 | High Security Vault for the Miami-Dade Police Department |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
10/25/22 | 20220180 | Joint Participation (JPA) between Miami-Dade County and the Village Key Biscayne for the Intersection Improvements of Crandon Boulevard |
SBE/Cons – 20% Goal |
N/A | N/A | N/A | 23.90% SBE-Con Goal | N/A | ||
10/25/22 | TAC-R-W057A | Miami International Airport Fuel Facility Tank 21 – Water Supply |
SBE/Cons – 16% SBE-Con 10% CWP Goal |
N/A | N/A |
16% SBE-Con Goal 10% CWP Goal |
N/A | |||
10/24/22 | X009A | Miami Opa-Locka Executive Airport (OPF) Runway 09L-27R Rehabilitation |
SBE/Cons – 7.11% DBE Goal |
N/A | N/A | 7.11% DBE Goal | N/A | |||
10/21/22 | P15703 | Installation of Protective Articulated Concrete Mats for Central District and North District and North District Plant Outfalls |
SBE/Cons – No Measure (Insufficient Availability) SBE/G&S – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
10/19/22 | TAC-N-AC-034A | The Rental Car Center – Stormwater Drainage Project |
SBE/A&E – 0.0% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
10/18/22 | MDAD-CIP-AA018B | MIA Concourse H Glazing, Curtain Wall Assessment & Corrective Action |
SBE/Cons – 17.46% SBE-Con Goal |
N/A | N/A | N/A |
17.46% SBE-Con Goal 10% CWP Goal |
N/A | ||
10/14/22 | P16141 | Alex Orr Wells 1 to 10 Transformer Upgrades |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | 9.98% SBE Cons Goal | N/A | ||
10/14/22 | TP-0000008807 | Metrorail Public Address System Replacement |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | No Measure | N/A | ||
10/7/22 | S-984 | Water and Wastewater Services to Commercial Properties - Green Tech Corridor – Basin S-2, Phase 1, East Side of NW 27th Avenue |
SBE/Cons – 10.89% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
10/7/22 | RPQ No. 376954-R | Installation of a Horizontal Fall Arrest System |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
10/7/22 | W-953 | Two-Year County Contract for WASD Pavement Restoration, with County Option to Renew for an Additional Year Project A (2023-2025 Year) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
10/5/22 | 412223 R1 | Car Cleaner Platform Replacement Project |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
10/4/22 | TWH-73420-D8 | 100% SURTAX Funded Project New Construction of One CBS One Story Duplex (2 dwelling units) |
SBE/G&S – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
9/12/22 | S-971 | Furnish and Install 16-inch Sanitary Force Main along W, N & E Country Club DR from William Lehman Causeway to Yacht Club Way |
SBE/Cons – 9.20% Goal |
N/A | N/A | 9.20% SBE-Con Goal | N/A | |||
8/17/22 | 20220141 | Intersection Improvement at SW 57 Ave. and SW 72 St., FM# 449752-1 |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
8/17/22 | 14973-22 | Construction Services with U.S. Department of Homeland Security Federal Emergency Management Agency (FEMA) Funds |
SBE/Cons– No Measure (Federally Funded) |
N/A | N/A | Under Review |
Under Review |
N/A | ||
7/27/22 | 20220136 | Culvert Replacement at SW 132 Avenue and C-100 Canal |
SBE/Cons – 4.5% Goal – Concrete, Paving Markings and Sodding |
N/A | N/A | N/A | 4.50% SBE-Con Goal | N/A | ||
7/25/22 | MDFRD-731-CAM | MDFR FIRE STATION INTEGRATED SECURITY MANAGEMENT SYSTEM |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
7/25/22 | BA-070A | Spirit Airlines Inc. requests approval to make minor modifications to spaces on the 3rd floor of Terminal G |
SBE/Cons – 24% Goal |
N/A | N/A | 24.49% SBE-Con Goal | N/A | |||
7/22/22 | TAC-N-BA-021AC | FOF Red Road Project Vacant Land on NW 57 Ave btwn NW 140 AND 142 St. at OPF |
SBE/Cons – 10.53% Goal |
N/A | N/A | N/A | 14.43% SBE-Con Goal | N/A | ||
7/20/22 | W-949 | John E Preston Water Treatment Plant High Service Pump Station Electrical Upgrades |
SBE/Cons – 3.60% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
7/19/22 | MCC-D105C-1A | MIA – Dolphin – Flamingo – 40 Year Re-Certification Repairs |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Packages A, C, and D Trade Set Aside Package B - No Measure 10% CWP Goal |
N/A | ||
7/18/22 | BA-004A | HMS Host Starbuck’s Refurbishment MIA Gate J7 |
SBE/Cons – 28.82% Goal |
N/A | N/A | 28.82% SBE-Con Goal | N/A | |||
7/18/22 | BA-006A | HMS Host Starbuck’s Refurbishment MIA Gate H4 |
SBE/Cons – 27.25% Goal |
N/A | N/A | 27.75% SBE-Con Goal | N/A | |||
7/18/22 | BA-007A | HMS Host Starbuck’s Refurbishment MIA Gate D10 |
SBE/Cons – 28.99% Goal |
N/A | N/A | N/A | 28.99% SBE-Con Goal | N/A | ||
7/15/22 | W-952 | Alexander Orr Water Treatment Plant Sodium Hypochlorite Feed & Storage Facility |
SBE/Cons – 7.99% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
6/29/22 | W200011 | Zelda Glazer Soundscape Project |
SBE/Cons – 18.84% Goal |
N/A | N/A | N/A | 18.13% SBE-Con | N/A | ||
6/24/22 | DRM-PILOT-2022 | Biscayne Bay Quality Characterization and Pollution Reduction |
SBE/Cons – NO Measure |
N/A | N/A | N/A | No Measure | N/A | ||
6/23/22 | HI-51060118003B | Hurricane Irma – Matheson Hammocks Wading Beach Renovations |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | NO Measure | N/A | ||
6/22/22 | 2022HOPC | Highland Oaks Park – Pickleball Court |
SBE/Cons – 3.76% Goal |
N/A | N/A | 3.76% SBE-Con Goal | N/A | |||
6/21/22 | RPQ No. 1847-22 | North Dade Landfill LFG System |
SBE/G&S – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
6/17/22 | TP-0000008861 | Secondary Unit Substations A & B replacement at Metrorail Stations |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
6/13/22 | RFQ 22-19175-KG(r) | LTCC Lobby Restroom Renovation |
SBE/Cons – 100% Level 1 set-aside |
N/A | N/A | N/A | Level 1 Set Aside | N/A | ||
6/7/22 | S-961 | New Regional Fats, Oils, and Grease (FOG) Facility at the South District Wastewater Treatment Plant |
SBE/Cons – 5.05% Goal |
N/A | Under Review |
Under Review |
N/A | |||
6/1/22 | RPQ No. 2022MPB1 | Tamiami Park Sport Courts Renovations for Pickleball |
SBE/Cons – 19.51% Goal |
N/A | N/A | N/A | 19.51% SBE-Con Goal | N/A | ||
5/26/22 | MCC-T012A-3 | MIA – Concourse H Vertical Circulation Core Modifications |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Package (A - D, F&G) - Trade Set Aside Package E - No Measure 10% CWP goal |
N/A | ||
5/24/22 | MCC-X010A | Opa-Locka Executive Airport Engine Run-Up Pad |
DBE – 17% Goal |
N/A | N/A | 17% DBE Goal | 17% DBE Goal | N/A | ||
5/23/22 | C21230420001 | Jeb Estates Park – Playground and General Plan Build-Out Project |
SBE/Cons – 24.17% Goal |
N/A | 24.01% SBE-Con Goal | N/A | ||||
5/23/22 | TP-0000008233 | Lehman Curve N41 Realignment |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/23/22 | RPQ No. 71286 | PHCD Work-Order Contract 2022 – Central Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/23/22 | RPQ No. 71285 | PHCD Work-Order Contract 2022 – South Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
5/23/22 | RPQ No. 71291 | PHCD Work-Order Contract 2022 – North Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
5/20/22 | I190086 | LightSpeed – Re-Roof and HVAC Replacement |
SBE/Cons – Under Review |
N/A | N/A | Under Review |
Under Review |
N/A | ||
5/20/22 | RPQ No. 71184 | Arthur Mays Brick Up 2 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | N/A | |||
5/11/22 | 18310-21 | Department of Solid Waste Management’s (DSWM) West Transfer Station Tipping Floor and Improvements |
SBE/Cons – Under Review |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
5/11/22 | RPQ No. 70899 | PHCD Boiler Inspections, Preventive Maintenance & Repair Services & Parts |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/9/22 | RPQ No. 20220084 | Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside(s): Traffic Stripes and Markings and signage: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American Disabilities (ADA) items) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
5/9/22 | RPQ No. 20220085 | Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside(s): Traffic Stripes and Markings and signage: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American Disabilities (ADA) items |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
5/9/22 | W-945 | Alexander Orr Jr. Water Treatment Plant Lime Slaker Replacement Project |
SBE/Cons – 2.20% Goal |
N/A | N/A | N/A | 2.20% SBE-Con Goal | 2.20% SBE-Con Goal | N/A | |
5/4/22 | S-981 | HVAC Improvements – Package “C” Effluent Pump Station Back Up Chiller Addition, North Filter Building Substation 23 and 24, and South Filter Building Substation 27 and 28F. |
– SBE/Cons – 9.50% Goal |
N/A | N/A | 15.29% SBE-Con Goal | N/A | |||
5/4/22 | MCC AA046A | MIA – Lower Concourse E and Satellite E 3rd Floor APMPlatform Annunication |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Package A & B Trade 10% CWP Goal |
N/A | ||
5/3/22 | RPQ No. 18297-22 | DSWM Central Transfer Station Tipping Floor Project – Phase II |
SBE/G&S – Under Review |
N/A |
Under Review |
Under Review |
N/A | |||
5/3/22 | 259734-A | Multiple Parks Swimming Pool and Splashpad Repairs – North of Tamiami Trail |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/2/22 | TAC-N-BA-021A | FOF Red Road Project Vacant Land on NW 57th Ave btwn NW 140 and 142 St. at OPF |
SBE/Cons – TBD |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/14/22 | 2021-010 | Construction Contract Services for Shore Power For Terminals |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/6/22 | 20220040 | Roadway improvements to NE 151 Street from East of Railroad Tracks to Bay Vista Boulevard |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/6/22 | 20210092 | Roadway improvements to NE 151 Street from East of Railroad Tracks to Bay Vista Boulevard |
SBE/Cons – 6.36% Goal |
N/A | N/A | N/A |
6.11% SBE-Con Goal |
N/A | ||
4/5/22 | BA-016A | Frontier Airlines build out their crew rooms on 2nd and 3rd floor of CC F |
SBE/Cons – 30.89% |
N/A | N/A | N/A |
30.89% SBE-Con Goal 10% CWP Goal |
N/A | ||
3/28/22 | AC-100A | HMS Host – Peet’s Coffee – MIA North Terminal CcD Gate 51 Hold room |
SBE/Cons – 18.64% Goal |
N/A | N/A | N/A |
0.00% SBE-A&E 15.35% SBE-Con 10% CWP Goal |
N/A | ||
3/28/22 | TAC-N-AB023A | OPF – Off-Lease Only LLC Lot “I” Install 2-Security Booth and 2-Fuel Tanks |
No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/28/22 | TAC-N-AA175A | OPF – Off-Lease Only-Interior Renovations to Building “J” |
20% SBE-Con Goal |
N/A | N/A | N/A |
20% SBE-Con Goal |
N/A | ||
3/28/22 | TAC-N-AA175B | OPF – Off-Lease Only LLC Building. “J” Dent Wizard – Paint Booth |
25.14% SBE-Con Goal |
N/A | N/A | N/A |
25.14% SBE-Con Goal |
N/A | ||
3/2/22 | E22-DTPW-01 | Construction Engineering and Inspection Services & Resident Compliance Specialist Services for Florida Department of Transportation Local Agency Program Projects |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/18/22 | 20220030 | Safe Route to Schools Locations, Phase 22 FM #439895-1 |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/18/22 | 20220010 | SW 87 AVENUE BRIDGE OVER CANAL C-100 |
SBE/Cons – 3.60% Goal |
N/A | N/A | N/A |
3.60% SBE-Con Goal
|
N/A | ||
2/18/22 | 20220017 | Intersection Improvements to Old Cutler Rd at SW 136th Street and SW 67th Avenue |
SBE/Cons – 11.59% Goal |
N/A | N/A | N/A |
11.57% SBE-Con Goal |
N/A | ||
2/16/22 | RPQ No. MDCR Boilers | Boiler and Water Heater Maintenance and Repairs |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/16/22 | 999999-21-023 | Multiple Parks - Sport Courts Renovations for Pickleball |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
2/16/22 | RFQ 22-19175-KG | LTCC Lobby Restroom Renovation |
SBE/Cons – 100% Level 2 set-aside |
N/A | N/A | N/A |
Level 1 Set-Aside |
N/A | ||
2/16/22 | 20220032 | PTP Vision Zero Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set Asides 2 10.00% CWP Goal |
N/A | ||
2/14/22 | RPQ No. 68859 | PHCD WORK-ORDER CONTRACT 2022 - NORTH AREA |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
2/14/22 | RPQ No. 68856 | PHCD WORK-ORDER CONTRACT 2022 - SOUTH AREA |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/14/22 | RPQ No. 68855 | PHCD WORK-ORDER CONTRACT 2022 - CENTRAL AREA |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/14/22 | RPQ No. 69003 | PHCD VACANT UNIT PREPARATIONS - CONTRACT 1 - NORTH SECTOR 2022 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/14/22 | RPQ No. 69002 | PHCD VACANT UNIT PREPARATIONS - CONTRACT 2 - SOUTH SECTOR 2022 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
2/11/22 | 20210224 | Roadway Improvements to SW 268 St from SW 139 Ave to SW 119 Ave |
SBE/Cons – 8.83% SBE-Con Goal |
N/A | N/A | N/A |
8.83% SBE/Con Goal |
N/A | ||
2/3/22 | 2022-MDFR-CR-OR-HQ | Miami Dade Fire Rescue Crandon Park Ocean Rescue Headquarters |
SBE/Cons – 11.50% Goal |
N/A | N/A | N/A |
11.50% -SBE-Con Goal |
N/A | ||
1/28/22 | TAC-N-135A | Aero Miami I/LATAM Lan Cargo ULD Handling System Demolition & Installation of Caster Deck & High-Speed Doors at MIA Bldg. 709 |
SBE/Cons – 7.01% |
N/A | N/A | N/A |
7.01% SBE- Con Goal |
N/A | ||
1/25/22 | 32080117002-A | Pelican Harbor Marina – Dredging around D Dock Rebid |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/24/22 | 20220013 | Intersection Improvements to Old Cuttler Rd at SW 152nd Street and SW 184th St |
SBE/Cons – 10.21% Goal |
N/A | N/A | N/A |
10.21% SBE-Con Goal |
N/A | ||
1/21/22 | 005-E15/02-NOVA | Soil and Groundwater Sampling at the Pump Station #002 Property, on behalf of Water & Sewer Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/14/22 | 045-E14/03-ARC | Phase 2 Environmental site Assessment at the Goulds 5 Acre Property, located in the vicinity of 12821 SW 232 St., on behalf of the Department of Parks, Recreation & Open Spaces |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/13/22 | R-237491 | CDWWTP PLANT 2 CLARIFIER BASIN No. 4 STRUCTUAL REHABILITATION |
SBE/Cons – Trade Set Aside 100% |
N/A | N/A | N/A |
100% Trade Set Aside |
N/A | ||
1/13/22 | 037-E14-01-NOVA | Environmental site Assessment at the Future Miami Heights Park Facility, located in the vicinity of SW 117 Ave. and SW 172 St., on behalf of the Department of Parks, Recreation & Open Spaces |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/5/2022 | 006R1-E14-03-ARC | Monitoring Well Installation and Additional Groundwater Assessment at the County Club of Miami, located near 6801 NW 186 St., on behalf of the Department of Parks, Recreation & Open Spaces |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/27/21 | 20210253 | Intersection Improvements-Multiple Sites |
SBE/Cons – Trade Set-Aside(s): Traffic Stripes and Markings and signage: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/14/21 | S-932 | Clarifiers and HLD (ST-2B) South District Wastewater Treatment Plant |
SBE/Cons – 6.47% Goal |
N/A | N/A | N/A |
6.47% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
12/14/21 | S-933 | Clarifiers and HLD (ST-2B) South District Wastewater Treatment Plant |
SBE/Cons – 1.43% Goal |
N/A | N/A | N/A |
1.43% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
11/29/21 | RPQ No. 67284 | Edison Plaza full capacity generator-windows-doors replacement |
SBE/G&S – No Measure (Federally Funded) |
N/a | N/A | N/A |
No Measure |
N/A | ||
11/24/21 | P0260 | One-Year County-Wide Contract for Rehab of Manholes, Inflow and Infiltration Repair |
SBE/Cons – No Measure (Qualifications of Bidders/Single-Trade/No opportunity for sub-contracting) |
N/A | N/A |
No Measure |
N/A | |||
11/16/21 | Mech-051-HVAC | Weatherization Assistance Program (WAP) |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/16/21 | RPQ No. WAP-051-B | Weatherization Assistance Program (WAP) |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/4/21 | AC-089A | Remodeling of DFA Store 701 at Gate D15 |
SBE/Cons – 23.03% Goal |
N/A | N/A | N/A |
23.03% SBE-Con Goal |
N/A | ||
11/3/21 | TAC-R-AC-067A | Bridge Point BP Gratigny |
SBE/Cons – 9% Goal |
N/A | N/A | N/A |
9% SBE-Con Goal |
N/A | ||
11/1/21 | AC-081A | Swissport Cargo Building Cooler Expansion |
SBE/G&S – 38.32% Goal |
N/A | N/A | N/A |
38.32% SBE-Con Goal |
N/A | ||
10/29/21 | 422003-18-010 | Hobie Island North Side Shoreline Roadway Protection on Rickenbacker Causeway |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65 % DBE Goal |
N/A | ||
10/27/21 | AC-062A | Tampa Cargo BUP Infrastructure Bldg 708 |
SBE/Cons – 9.00% Goal |
N/A | N/A | N/A |
0.9% SBE-Con Goal |
N/A | ||
10/25/21 | AC069A | Signature Flight Support Remodel to Main Lobby and Bathrooms |
SBE/Cons – 10% Goal |
N/A | N/A | N/A |
10% SBE-Con Goal |
N/A | ||
10/25/21 | RPQ No. 65847 | PHCD Vacant Unit Securing – Arthur Mays |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
0.00% SBE-Con Goal |
N/A | ||
10/15/21 | 20210077 | Roadway Improvements to SW 328 Street from SW 187 Avenue to US-1 |
SBE/Cons – 37.06% Goal |
N/A | N/A | N/A |
28.85% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
10/12/21 | RFQ 21-20030-CW | General Interior Construction Tasks |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 1 Set-Aside |
N/A | ||
10/12/21 | R-233514 | CDWWTP PLANT 2 CLARIFIER No.5 |
SBE/Cons –100% Trade Set Aside |
N/A | N/A | N/A |
100% Trade Set Aside |
N/A | ||
10/12/21 | R-233518 | CDWWTP PLANT 2 CLARIFIER No.6 |
SBE/Cons –100% Trade Set Aside |
N/A | N/A | N/A |
100% Trade Set Aside |
N/A | ||
10/7/21 | RFQ 21-21243-HO | Jackson North General Construction Tasks |
SBE/Cons – 100% Level 2 Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/6/21 | Y145A | Security Fencing - Homestead Airport - Enhancements |
60% DBE Goal |
N/A | N/A | N/A |
60% DBE Goal |
N/A | ||
10/6/21 | 003-E14-03-AECOM | Source Removal located within the Vizcaya Museum and Gardens |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/5/21 | 65360 | James E Scott Building Rehabilitation |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
10/5/21 | 20210203 | FDOT Traffic Signals Preventative Maintenance |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
9/28/21 | C21-SMDCAC-BAS | Building Automation System Replacement and Related I |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
9/23/21 | 20210190 | Roadway Resurfacing - Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set-Aside 2 10% CWP Goal |
N/A | ||
9/23/21 | 20210191 | Roadway Resurfacing - Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set-Aside 2 10% CWP Goal |
N/A | ||
9/22/21 | SD-17168-21 | South Dade Regional Library Roof Replacement and Impact Resistant Windows & Storefront |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
9/16/21 | AB-052A-2 | Implementation of Oil Change Program at the Rental Car Center |
SBE/Cons – 5.23% Goal |
N/A | N/A | N/A |
5.23% SBE-Con Goal |
N/A | ||
9/16/21 | M2020-004 | Administration Buildings 1001 - 1015 - Generator |
SBE/Cons – 6.86% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
9/13/21 | AC-052A | Swissport Building 711 Office Renovation |
SBE/Cons – 15% SBE-Con Goal |
N/A | N/A | N/A |
15% SBE-Con Goal |
N/A | ||
9/9/21 | RFQ 21-19118-KG | Central Building Pipe Insulation |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 3 Set-Aside |
N/A | ||
9/7/21 | E14-RER-03-025R1-APTIM | Source (Soil) Removal at the Future World Literacy Center Site |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/2/21 | S-930A | ST-2D-A ELECTRICAL DISTRIBUTION BUILDING 3 SOUTH DISTRICT WASTEWATER TREATMENT PLANT |
SBE/Cons – 10.10% Goal |
N/A | N/A |
SBE-Con 10.16% Goal 1.34% SBE-Goods Goal |
N/A | |||
9/1/21 | 32080117002 | Pelican Harbor Marina – Dredging around D Dock |
SBE/Cons – No Measure (Grant Requirements) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/23/21 | DB21-DTPW-08 | Design-Build Services for Roadway Signs in the Vicinity of Metrorail Stations |
SBE/Cons– No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/11/21 | 035-E14/03-CEI | Source Removal at the BLDG 1 – Location J site, located within the Miami Opa-Locka Executive Airport, on behalf of MDAD |
SBE/Cons– No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/10/21 | 20210096 | Sweeping and Cleaning Operations |
SBE/Cons – Under Review |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/2/21 | I190203 | Dade County Courthouse Basement Column/Slab Remediation |
SBE/Cons – 16.55% Goal |
N/A | N/A |
16.55% SBE-Con Goal 3.00% SBE-Goods 10.00% CWP Goal |
N/A | |||
7/30/21 | 20210089-R | Push-Button Contract for Traffic Signal Improvements – North |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/29/21 | V006A | Demolition of Bldg. 3039 at Miami International Airport |
SBE/Cons – 47.2% Goal |
N/A | N/A | N/A |
47.2% DBE Goal |
N/A | ||
7/29/21 | AC-050A | Tampa Cargo Pharma Center MIA Bldg 708 |
SBE/Cons – 5% Goal |
N/A | N/A |
11.7% SBE-Con Goal |
N/A | |||
7/22/21 | AA005A | E Satellite Lower E and DE Connector |
SBE/Cons– 20.64% Goal |
N/A | N/A | N/A | 20.64% SBE-Con Goal | N/A | ||
7/21/21 | 210601-19-001 | Lake Stevens Splashpad and Park Development |
SBE/Cons – 18.12% Goal |
N/A | N/A | N/A |
23.31% SBE-Con Goal |
N/A | ||
7/21/21 | 221801-19-002 | Oak Grove Park – Turf Conversion, Lighting and ADA Compliance |
SBE/Cons – 9.11% Goal |
N/A | N/A |
9.11% SBE-Con Goal 10.00% CWP Goal |
N/A | |||
7/19/21 | TAC-N-AC021A | MIA Safegate Terminal D (A-VDGS) Replacement |
SBE/Cons– No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/19/21 | RPQ NO. WAP-050 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/6/21 | S-915R | CD 2.15(3) PLANT 2 CLUSTER 3 DIGESTER UPGRADES |
SBE/Cons – 6.75% Goal |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
7/2/21 | RFQ 21-19085-KG | Red Garage Pipe Hangers |
SBE/Cons – 100% Level 2 Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
7/1/21 | 031-E14/03-CEI | Soil and Groundwater Sampling at the NDLF Maintenance Shop, on behalf of ISD |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/28/21 | CMBJPA-2021.01 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Miami Beach for Interception Improvement of Pine Tree Drive and 46th Street |
SBE/Cons – Landscaping 6.2% |
N/A | N/A |
15.00% SBE-Con Goal |
N/A | |||
6/28/21 | RFP-01982 | Develop, Maintain and Operate Rickenbacker and Venetian Causeways |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/17/21 | ITB-21-20874-SW | JHS North Campus Elevator Modernization Program |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
No Measure |
N/A | ||||
6/15/21 | P0254 | CD 2.26 Actuator Platforms at Oxygenation Trains CDWWTP |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure |
N/A | |||
6/14/21 | 2020-003.01 | Cruise Terminal G Bollard Phase II (Bay 8.5) |
SBE/Cons – 6.84% Goal |
N/A | N/A | N/A |
6.84% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
6/11/21 | 2011-045.05 | Cargo Gates Modifications and Traffic Improvements (Phases 2 – 5) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/10/21 | RFQ 21-19071-KG | LTCC AHU Replacement |
SBE/Cons – Level 2 Set-Aside |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
6/4/21 | MDPDW21006 |
Roof Replacement of the MDPD Off-Site Maintenance Shop |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
6/3/21 | S-964 |
NW 27 Ave Waste Collection Transmission System Expansion and Water Distribution System Improvements D2-A-1 Phase 2 |
SBE/Cons – 14.09% |
N/A | N/A |
14.56% SBE-Con Goal 10.00% CWP Goal |
N/A | |||
6/3/21 | S-969 |
Emergency Sludge Line Repair in Biscayne Bay |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
6/2/21 | AC-035A |
MIA T-Mobile Fiber Optic Installation Flamingo & Dolphin Garage |
SBE/Cons– No Measure (Due to dollar value) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/1/21 | DB21-DTPW-06 |
Replacement of Existing Span-Wire Signalized Intersections for Mast-Arm Configuration |
SBE/Cons – 8.61% Goal |
N/A | N/A | N/A |
SBE-Cons 8.61% Goal 10% CWP Goal |
N/A | ||
5/27/21 | 229115 (RTQ-01055) |
2020 Saltfront Wells |
SBE/Cons – No Measure |
N/A | N/A |
No Measure |
N/A | |||
5/24/21 | 20210082 |
Safe Routes to Schools Locations, Phase 23 |
DBE – 10.65% Goal |
N/A | N/A |
DBE 10.65% Goal |
N/A | |||
5/21/21 | 222302-17-005 |
Boat Ramp and Parking Lot Renovation |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A |
No Measure |
N/A | |||
5/20/21 | DB21-DTPW-05 |
Roadway Improvements to Bay Vista Blvd. from NE 151 Street to Gwen Margolis Blvd |
SBE/Cons – 9.27% |
N/A | N/A |
9.27% SBE-Con Goal |
N/A | |||
5/14/21 | TOMLJPA-2021.01 |
Joint Participation Agreement (JPA) between Miami-Dade County and the Town of Miami Lakes for Roadway Extension of NW 59 Avenue over the C-8 Canal South to NW 151 Street |
SBE/Cons – Concrete – 7.06% |
N/A | N/A |
7.31% SBE-Con goal 3.56% SBE-Services Goal |
N/A | |||
5/14/21 | 048-E14/03-ARC |
Groundwater Sampling at Macy's Property, on behalf of Water & Sewer Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/11/21 | AC-036A |
QTA Fire Suppression System Modification at RCC |
SBE/Cons– 100% Goal |
N/A | N/A | N/A | 100% Set Aside | 100% Set Aside | N/A | |
5/10/21 | DB21-DTPW-04 |
Roadway Improvements to NW 84th Avenue between NW 58th Street and NW 74th Street |
SBE/Cons – 20.90% Goal |
N/A | N/A | N/A | 20.90% SBE/Cons Goal | 20.90% SBE/Cons Goal | N/A | |
5/10/21 | RPQ No. NMOFSMWINDOWS |
OFARRILL SOUTH MIAMI HEAD START IMPACT STORE FRONT WINDOW AND DOORS PROJECT |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/10/21 | RPQ No. MDFR-687-TRPOOL |
MDFR Training Facility Pool Repair and Renovation |
SBE/Cons – No Measure |
N/A | N/A | No Measure | No Measure | N/A | ||
5/10/21 | RPQ No. Mech 048- HVAC |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/10/21 | RPQ No. WAP-048 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/4/21 | P0223R |
Upgrade Sewage Pump Station No. 0014 |
SBE/Cons – 9.0% Goal |
N/A | N/A |
9.00% SBE-Con Goal 1.36% SBE-Goods |
N/A | |||
4/30/21 | 20210093 |
Roadway Improvements to NW 37th Avenue from NW 36 St to NW 79th Street |
SBE/Cons – 6.83% Concrete; 1.06% Pavement Marking & Signage |
N/A | N/A | N/A |
7.89% SBE-Con Goal 2.00% SBE-G&S Goal 10.00% CWP Goal |
N/A | ||
4/28/21 | P0244 |
Mural Restoration Alexander Orr Jr. Water Treatment Plant |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | No Measure | N/A | ||
4/26/21 | 20210071 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210072 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210073 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210074 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210075 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210076 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/19/21 | AC-011A |
Interior Build Out for Bldg. |
SBE/Cons– 4.68% Goal |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
4/19/21 | AC-005A |
Tenant Interior Build Out for MIA2 |
SBE/Cons– 9.42% Goal |
N/A | N/A | N/A | 9.42% SBE-Con Goal | 9.42% SBE-Con Goal | N/A | |
4/19/21 | S-930B |
ST-2D-B SOUTH DISTRICT WASTEWATER TREATMENT PLANT SUBSTATIONS 5-6 & 15-16 |
SBE/Cons – 11.85% Goal |
N/A | N/A |
11.85% SBE-Con Goal 1.00% SBE-Goods |
N/A | |||
4/13/21 | M2020-024 |
General Construction Services (Portwide) |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
100% Trade Set Aside 10.00% CWP Goal |
N/A | ||
4/13/21 | 227208 |
CDWWTP MIT 2021 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
4/9/21 | RPQ No. WAP-047 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/9/21 | RPQ No. 20210067 |
Drain Cleaning Contract |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/9/21 | RPQ No. 20210068 |
Drain Cleaning Contract |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/9/21 | RPQ No. 20210069 |
Drain Cleaning Contract |
DBE – 10.65% Goal |
N/A | N/A | N/A | DBE – 10.65% Goal | DBE – 10.65% Goal | N/A | |
4/5/21 | RPQ NO. I190167-R |
SPCC Exterior Ceiling Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | No Measure | N/A | ||
3/31/21 | 60993 |
PHCD Boiler Inspections, Preventive Maintenance & Repair Services at & Parts. |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/29/21 | DB21-DTPW-01 |
Design Build Services (RDBS) for a Project with Disadvantaged Business Enterprise Goals |
SBE/Con – No Measure DBE Goal - 10.65% |
N/A | N/A | N/A |
SBE/Con - No Measure DBE Goal - 10.65% |
N/A | ||
3/29/21 | S-955 |
Two-Year Countywide Contract for Removal and Replacement of Sanitary Sewer Gravity Mains, With County Option to Renew for an Additional Two Years on a Yearly Basis |
SBE/Cons – 22.97% Goal |
N/A | N/A |
22.97% SBE-Con Goal 4.00% SBE-G&S Goal |
N/A | |||
3/29/21 | S-962 |
Two-Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Cured-In-Place Pipe Lining Method for Well Protection Areas |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | No Measure | N/A | ||
3/26/21 | RPQ No. Mech 046-HVAC |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/25/21 | OLC-19341-21 |
Lemon City Library ADA Renovations and Impact Resistant Storefront and Windows |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/25/21 | 17032-21 |
DSWM South Dade Landfill Gas System Expansion |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
5.00% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
3/25/21 | 028-E14/03-CEI |
Soil and Groundwater Sampling at Gwen Cherry Park, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/25/21 | RPQ No. WAP-046 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/23/21 | RPQ No. 20210057 |
Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set-Aside 2 10.00% CWP Goal |
N/A | ||
3/23/21 | 20210062 |
Joint Participation Agreement - Roadway Improvements W 76 St from W 36 Ave to W 20 Ave - Phase V |
SBE/Cons – Concrete 17.21% |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/23/21 | RPQ No. 20210056 |
Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set-Aside 2 10.00% CWP Goal |
N/A | ||
3/22/21 | S-960 |
One-Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Sectional Lining Method with County Option to Renew for an Additional Three Years on a Yearly Basis |
SBE/Cons – Set Aside |
N/A | N/A |
Level 1 Set Aside 100% Goal
|
Level 1 Set Aside 100% Goal | N/A | ||
3/18/21 | DB21-DTPW-03 |
Design-Build Services for the Dadeland South Intermodal Station |
SBE/Cons – 8.22% SBE-Con Goal |
N/A | N/A | N/A | SBE/Cons – 8.22% SBE-Con Goal | SBE/Cons – 8.22% SBE-Con Goal | N/A | |
3/18/21 | 023-E14/03-CEI |
Groundwater Monitoring Plan Implementation for the Ludlam Trail Corridor project, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/18/21 | 033-E14/03-APTIM |
Site Assessment at the Miami-Dade Fire Rescue Training Facility, on behalf of Miami-Dade Fire Rescue |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/18/21 | RPQ No. SAPARKS21 |
Senior Housing Assistance Program |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/18/21 | RPQ No. SABRUNSON21 |
Senior Housing Assistance Program |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/18/21 | RPQ No. SAMCCRAY21 |
RPQ No. SAMCCRAY21 |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/11/21 | P0246 |
Alexander Orr Jr. WTP Radiator Installation for Engine No.6 |
SBE/Cons – 12.89% Goal |
N/A | N/A | 12.89% SBE-Con Goal | 12.89% SBE-Con Goal | N/A | ||
3/9/21 | 2021-MDFR-68 |
Miami Dade Fire Rescue Station No. 68 Dolphin |
SBE/Cons – 13.43% Goal |
N/A | N/A |
13.42% SBE-Con 3.77% SBE-Goods 10.00% CWP Goal |
N/A | |||
3/9/21 | 2017-035.03R |
North Cruise Boulevard Extension Phase III |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/9/21 | RPQ NO. 60440 |
PHCD Annie Coleman 014 Vacant Unit |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/8/21 | P0226RR |
CD 1.11 - EMERGENCY GENERATORS 1 THROUGH 4 REHAB SOUTH DISTRICT WASTE WATER TREATMENT PLANT |
SBE/Cons – 16.49% Goal |
N/A | N/A |
16.49% SBE-Con 3.02% SBE-Goods |
N/A | |||
3/5/21 | KN-21194-21 |
Kendall Library Impact Resistant Storefront and Windows |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/3/21 | RPQ No. 420224 |
Park & Ride Lot at SW 112 Avenue and SW 204 Street Busway |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
2/25/21 | RPQ NO. 60110 |
WORK ORDER CONTRACT 2021 – Central Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/24/21 | RPQ No. 60108 |
PHCD WORK ORDER CONTRACT |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/24/21 | RPQ NO. 60109 |
WORK ORDER CONTRACT 2021 – Central Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/24/21 | RTQ-01055 |
Well Drilling Services |
SBE/Cons – Bid Preference |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
2/17/21 | 20200297-R |
Emergency Culvert Replacement NW 57 Ave and NW 186 St - Tropical Storm ETA |
SBE/Cons – 7.22% Goal |
N/A | N/A | N/A | 7.22% SBE/Con Goal | 7.22% SBE/Con Goal | N/A | |
2/11/21 | P0247 |
Installation of 96-Inch Butterfly Valve on Hialeah WTP Raw Water Main |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | No Measure | N/A | ||
2/5/21 | 502501-17-002 |
Charles Deering Estate - Courtyard Drainage and Structural Improvements |
SBE/Cons – 17.53% Goal |
N/A | N/A | N/A |
17.53% SBE-Con Goal |
17.53% SBE-Con Goal | N/A | |
2/4/21 | S-935 |
Ocean Outfall Legislation Program Construction Package ST-1B Oxygenation Trains 1-7 Rehab and Electrical Buildings |
SBE/Cons – 12.06% Goal |
N/A | N/A | N/A |
10.95% SBE-Con Goal 1.02% SBE-Goods Goal |
N/A | ||
2/3/21 | 20210015 |
Push Button Intersection Improvements – North |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
2/2/21 | DB21-DTPW-02 |
Roadway Improvements to NE 2 Ave from NE 20 Street to NE 36 Street |
SBE/Cons – 7.7% Goal |
N/A | N/A | N/A |
5.43%-SBE-Con Goal 0.63% Services Goal 10.00% CWP Goal |
N/A | ||
1/29/21 | ITB 21-20057-TC |
Jackson Memorial Freestanding Emergency Department |
SBE/Cons – 23.20% Goal |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/26/21 | P0245 |
Furnish and Install 16-inch PVC 14-inch HDPE Force Main at NE 183 RD ST. & Island Blvd. |
SBE/Cons – 6.4% Goal |
N/A | N/A | N/A |
6.38% SBE-Con Goal 7.34% SBE-Goods Goal |
N/A | ||
1/19/21 | RPQ No. 57925 |
PHCD Vacant Unit Preparations - 2021 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/15/21 | RPQ No. WAP-045 B |
Weatherization Assistance Program |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/14/21 | 2020-005 |
FPL Substation Expansion In fracture Relocation and Improvements (Phase I) |
SBE/Cons – 8.32% Goal |
N/A | N/A | N/A |
8.32% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
1/14/21 | S-956 |
NDWWTP Municipal Injection Wells (NE-2) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/11/21 | H2019-034 |
RCCL Replacement of Light Posts and Luminaires |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/8/21 | 2020-003 |
Cruise Terminal G Bollards |
SBE/Cons – 7.55% Goal |
N/A | N/A | N/A |
7.55% SBE-Con Goal |
N/A | ||
12/30/20 | RPQ No. HLMP21-ROOF-2 |
Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Funded by the State of Florida) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/30/20 | RPQ No. HLMP21-ROOF |
Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Funded by the State of Florida) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/30/20 | AA-0171B | OPF Bridge Aviation Warehouse Bldg. MIA2 |
SBE/Cons– 5% Goal |
N/A | N/A | N/A |
5.34% SBE-Con goal |
N/A | ||
12/23/20 | AB-074A |
IFC New FBO Building & Storage Hangars |
SBE/Cons– 9% Goal |
N/A | N/A | N/A |
10.02% SBE-Con Goal |
N/A | ||
12/18/20 | E20-WASD-08 |
Integrated Master Plan and Engineering Technical Support Services |
SBE/Cons –15% Goal |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
12/17/20 | 2017-001.03 |
SFCT Facilities Demolition |
SBE/Cons – 19.92% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/10/20 | 20200297 |
Emergency Culvert Repair at NW 57 Ave and NW 186 St – Tropical Storm ETA |
SBE/Cons – 12.26% Goal |
N/A | N/A | N/A |
11.63% SBE-Con Goal |
N/A | ||
12/9/20 | AB-070A |
Amazon Parcel Sorter Machine Installation at OPF MIA1 Facility |
SBE/Cons– No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/4/20 | 014R1-E14/03-APTIM |
Limited Soil Assessment and Survey for the Amelia Earhart Park, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/3/20 | RPQ No. 412034 |
Traction Power Switchgear Replacement Project Phase III Update |
SBE/Cons – No Measure |
N/A | N/A |
No Measure |
N/A | |||
11/23/20 | W-942 |
72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street |
SBE/Cons – 5.47% Goal |
N/A | N/A |
N/A |
5.47% SBE-Con Goal 2.90% SBE-Goods Goal |
N/A | ||
11/17/20 | RQMT000006 |
Modernization, Maintenance, and Repair Services for Conveyance Equipment |
SBE/Cons– Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/17/20 | DB-20-LIB-01 |
Design and Construction of new 20,000 SQ.FT. Doral Branch Library |
SBE/Cons – 26% Goal |
N/A | N/A | N/A |
30.00% SBE-Con Goal |
N/A | ||
11/17/20 | S-958 |
D2-C-2, Proposed 16-inch, 12-inch, and 8-inch DI Water Main and 10-inch and 8-inch Gravity Sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and 8-inch Force Main along NW 87th Street |
SBE/Cons – 30% Goal |
N/A | N/A |
30.00% SBE-Con Goal No Measure- SBE Goods No Measure - SBE Services No Measure - CWP Goal |
N/A | |||
11/17/20 | HI-229378 |
Hurricane Irma – Redland Fruit and Spice Park Roof Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/16/20 | AA-084A |
Sky Harbour Hangars at OPF |
SBE/Cons– 9.65% Goal |
N/A | N/A | N/A |
9.65% SBE-Con Goal |
N/A | ||
11/16/20 | AB077A |
Amazon COVID-19 Work Station Separation Curtains |
Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/13/20 | 20200304 |
Drainage Improvements to C-100 Canal Outfalls Retrofit between SW 98 Ave. and SW 106 Ct. |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
11/12/20 | S-963 |
Installation of 10” HDPE Sewage Force Main Canal Crossing at NW 16 Ct. and NW 155 Terrace and Cut-In of 60” Plug Valve at NE 10 Ave. & NW 159 Street |
SBE/Cons – 3.00% Goal |
N/A | N/A |
3.00% SBE-Con Goal 0.50% SBE-Goods Goal 10.00% CWP Goal |
N/A | |||
11/9/20 | AB055A |
MIA Duty Free of the Americas Mont Blanc Boutique |
16.7% SBE-Con Goal | N/A | N/A | N/A |
16.7% SBE-Con Goal |
N/A | ||
11/9/20 | AB-055B |
MIA Duty Free of the Americans Lego Store |
SBE-Con 16.3% |
N/A | N/A | N/A |
16.3% SBE-Con Goal |
N/A | ||
11/6/20 | RPQ No. WAP-044 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/6/20 | RPQ No. Mech 044-HVAC |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
11/4/20 | DB20-PROS-01 |
Design- Build Services for the Country Club of Miami Golf Course Reconfiguration |
SBE/Cons – 4.05% Goal |
N/A | N/A | N/A |
4.05% SBE-Con Goal |
|
N/A | |
11/4/20 | 20200296 |
Drainage Improvements and F&I 12” D.I. Water Main at NW 18 Ave from NW 62 St to NW 71 St |
DBE– 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
10/29/20 | 20200289 |
Push-Button Contract for Safety Improvements |
DBE– 10.65% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/29/20 | 20-18935-KG |
Trauma Building AHU #202 Coil Replacement |
SBE/Cons – 100% Level-3 Set Aside |
N/A | N/A | N/A | Level 3 Set-Aside | N/A | ||
10/28/20 | 2017-001.01 |
Berth 9 Environmental Mitigation |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
10/27/20 | EDP-HD-S-JAMES-E. SCOTT |
James E Scott Building Revitalization |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Unde Review |
Under Review |
N/A | |
10/26/20 | S-931 |
Ocean Outfall Legislation Program Construction Package ST-2A Headworks 3, Oxygenation Trains 9 & 10, and Substation 57/58 |
SBE/Cons – 10.65% Goal |
N/A | N/A |
SBE/Cons – 10.65% Goal |
N/A | |||
10/14/20 | W-942 |
72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street |
SBE/Cons – 2.49% Goal |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
10/14/20 | RPQ No. MDFR-DIRCON |
Direct Connect/Source Capture System |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/8/20 | RFQ 20-18920-KG |
Jackson North Building Signage |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 3 Set Aside |
N/A | ||
10/7/20 | TEMP-LB-210 | Design and Construction of new 20,000 SQ. FT. Doral Branch Library |
SBE/Cons – Set-Aside |
N/A | N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
10/7/20 | 2017-001.02 |
Environmental Mitigation Project Berths 9 and H |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/6/20 | AB-052A |
Implementation of Oil Change Program at the Rental Car Center |
10% A/E Goal |
N/A | N/A | N/A |
10% A/E Goal |
N/A | ||
10/1/20 | 20200159 |
Safe Route to Schools Locations, Phase 22 |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
9/29/20 | RPQ No. WAP-043 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/29/20 | RPQ No. Mech 043-HVAC |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/28/20 | 026-E14-RER-03-WOOD |
Site Assessment at Future Embassair, Opa-Locka Airport, on behalf of MDAD |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/28/20 | DB20-WASD-02 |
Design-Build Services for the North District Wastewater Treatment Plant Oxygen Trains and Oxygen Production Facility Consent Decree |
SBE/Cons – 5.1432% Goal |
N/A | N/A | N/A |
SBE-Con - 5.143% Goal SBE-Goods - 1.00% Goal |
N/A | ||
9/28/20 | AB-058A |
Meek DFM9 Project (TAC N) |
3.33% SBE-A/E Goal |
N/A | N/A | N/A | 3.33% SBE-A/E Goal | N/A | ||
9/28/20 | W-942 |
72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street |
SBE/Cons – 2.49% Goal |
N/A | N/A | N/A |
5.47% SBE-Con goal
|
N/A | ||
9/23/20 | RPQ No. MDFR-666-OR-B |
Crandon Ocean Rescue Headquarters |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
32.61% SBE-Con Goal |
N/A | ||
9/21/20 | 2011-045.04 |
Cargo Gates Modification and Process Improvements – Secondary Electrical Service |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
SBE/Cons - 100% Trade Set Aside SBE/Goods - 2.97% goal SBE/Service - No Measure CWP - 10% goal |
N/A | ||
9/18/20 | ZC2020BIBR |
Zoo Miami – Black & Indian Rhino Barn Renovations |
SBE/Cons – 2.96% Goal |
N/A | N/A | N/A |
SBE/Cons – 2.97% Goal |
N/A | ||
9/18/20 | 016-E14/01-NOVA |
OPF ACTC Site Assessment, on behalf of Miami-Dade Aviation Department (MDAD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/18/20 | RPQ No. 20200255 |
Traffic Circle Improvements at SW 97th Ave. and SW 120th St. |
SBE/Cons – 10.17% Goal |
N/A | N/A |
10.17% SBE-Con Goal
|
N/A | |||
9/17/20 | S-951 |
Water and Wastewater Services to Commercial Properties Green Tech Corridor S-8 – Gravity Basin 30-0073 |
SBE/Cons – 15.54% Goal SBE/G&S – 6.12% Goal |
N/A | N/A | N/A |
16.79% SBE-Con Goal 6.12% SBE - Goods Goal |
N/A | ||
9/15/20 | 16704-DSWM20-CT |
Construction Services for Landfill Closure and Remediation at Virginia Key Landfill |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
9/11/20 | 20200251 |
Roadway Improvements to SW 22 Ave from US-1 to Coral Way |
SBE/Cons – 29.53% Goal |
N/A | N/A |
25.63% SBE-Con Goal |
N/A | |||
9/10/20 | 016R1-E14/03-WOOD |
Phase 2 Environmental Site Assessment at Briar Bay Linear Park, Parcels 13, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/10/20 | 017R1-E14/03-WOOD |
Phase 2 Environmental Site Assessment at Briar Bay Linear Park, Parcels 13, on behalf of Parks, Recreation and Open Spaces Department |
No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/10/20 | 018R1-E14/03-WOOD |
Phase 2 Environmental Site Assessment at Briar Bay Linear Park, Parcels 13, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/8/20 | R-218877 |
CD 2.08(3) Plant 2 Clafier #7 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
SBE/Cons - 100.00% Trade Set Aside |
N/A | ||
9/2/20 | RPQ NO. 17032-20 |
DSWM's South Dade Landfill Gas System |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
SBE/Cons - No Measure SBE/Goods - No Measure SBE/Services -1.73% Goal 10% CWP Goal |
N/A | ||
9/2/20 | RPQ No. 55634 |
Little River Terr. Lift Station Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/31/20 | 033-D14/01-NOVA |
Phase 2 Environmental Site Assessment at the Urbanistica Property, located at 830 NE 89 Street, on behalf of Miami-Dade Parks, Recreation & Open Spaces Department (PROS) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/31/20 | X-032C |
RTR M2, LLC Road Course and Supporting Facility (Comfort Station) |
11.21% SBE-Con goal |
N/A | N/A | N/A |
11.21% SBE-Con goal |
11.21% SBE-Con goal | N/A | |
8/27/20 | HI 50250118004 |
Hurricane Irma – Charles Deering Estate - Peoples Dock Reconstruction |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/25/20 | AL-18459-20 |
Allapattah Branch Library |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/20/20 | AA-037A (5) |
DHL Expansion Project MIA Building 716 (Sorting Equipment) |
No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/11/20 | 014-D14/01-NOVA |
Site Assessment at OGA Bldg. 101/102, on behalf of Miami-Dade Aviation Department (MDAD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/11/20 | AA-037A (4) |
DHL Expansion Project MIA Building 716 (Rapiscan X Ray Equipment) |
SBE/Cons - No Measure | N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/11/20 | 030-D14/03-APTIM |
Supplemental Soil Assessment at the South Dade Community Park, |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/11/20 | RPQ No. 14973-20 |
DSWM South Dade Landfill Facility Roofing Project (Roof Deck Waterproofing and Partial Roof Repairs) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/7/20 | DFM9- TAC N |
Meek DFM9 Project (TAC N) |
Under Review |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
8/7/20 | HI 51060120003 |
Hurricane Irma – Matheson Atoll Pool Restoration |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/6/20 | RPQ No. 53840 |
Helen Sawyer Full Capacity Generator |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/5/20 | RPQ No. 20200231 |
Push Button Intersection Improvements – South |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | |||
7/30/20 | CIP168-DTPW20-CT2 |
Metrorail Acoustical Barrier Replacement- Phase 3 |
SBE/Cons – No Measure SBE/Goods - No Measure SBE/Services - No Measure 10% CWP Goal
|
N/A | N/A | N/A |
SBE/Cons – No Measure SBE/Goods - No Measure SBE/Services - No Measure 10% CWP Goal |
N/A | ||
7/28/20 | RPQ No. 20200223 |
Traffic Signals and Signs Division Complex Roof Replacements |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure |
N/A | |||
7/27/20 | 014R1-D14/03-WOOD |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 015-D14/03-WOOD |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 006-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 007-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure
|
No Measure | N/A | |
7/27/20 | 015R1-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 016-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 018-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
7/27/20 | 022-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 022R1-D14/03-WOOD |
PFAS Assessment at the Miami International Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
7/25/20 | 006-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 022-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 023R1-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 024-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
7/25/20 | 025-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 026-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 028-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 039-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/21/20 | RPQ No. 418861 |
Metrorail Platform Cabling Replacement |
SBE/Cons – Under Review |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
7/21/20 | 001R2-D14/03-APTIM |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/21/20 | 025-D14/03-APTIM |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/21/20 | 026-D14/03-APTIM |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/21/20 | 026R1-D14/03-APTIM |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
7/20/20 | 012-D14/03-AECOM-A |
Site Assessment at the Annie Coleman 14 Site Locations on behalf of the Public Housing & Community Development Department (PHCD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 014-D14/03-AECOM |
Site Assessment at the Annie Coleman 14 Site Locations on behalf of the Public Housing & Community Development Department (PHCD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 013-D14/03-AECOM |
Site Assessment at the Annie Coleman 14 Site Locations on behalf of the Public Housing & Community Development Department (PHCD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 011-D14/03-AECOM |
Site Assessment at the Annie Coleman 14 Site Locations on behalf of the Public Housing & Community Development Department (PHCD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | RPQ No. 20190289-R |
SW 42nd Avenue over Coral Gables Canal Bridge No. 874275 Beams |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 0020-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 024-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 026-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 028-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 029-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | RPQ No. 16899-20 |
DSWM Gas Collection and Control System Expansion North Dade Landfill |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure - SBE/Con No Measure - SBE/Goods 1.73% - SBE/Services Goal No Measure - CWP Goal |
N/A | ||
7/17/20 | 015-D14-01-NOVA |
Limited Site Assessment, Remedial Documents Preparation & Construction Oversight at MIA Bldg. 2120, on behalf of Miami-Dade Aviation Department (MDAD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/17/20 | 025-D14/03-WOOD |
Site Assessment at the Doral Vacant Lot, located at 3500 NW 78 |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | 021R2-D14-03-APTIM |
Supplemental Groundwater Assessment at the Former Haven School, located at 11300 SW 80 Terrace, on behalf of the Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | 040-D14-03-ARCADIS |
Groundwater and Soil Assessment at the Brothers to the Rescue Park site, located at 2470 SW 72 AVE, on behalf of the Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | 030R1-D14-01-NOVA |
Supplemental Soil Assessment at the WASD Pump Station #002 site, located in the vicinity of 925 Biscayne Blvd, on behalf of the Parks, Water & Sewer Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | 012R2-D14-03-CEI |
Supplemental Soil Assessment at Post Hurricane Debris Staging sites at Tamiami and Homestead Air Reserve Parks located at 11201 SW 24 ST and 26751 SW 127 AVE respectively, on behalf of the Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | NC-18810-20 |
North Central Library Impact Resistant Windows and Storefront, Interior & Exterior Flooring |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/15/20 | W-948 |
Water Service Conversion from Rear Water Services to Front Water Services |
SBE/Cons – Level 3 Set-Aside |
N/A | N/A |
Tier III Set Aside - SBE/Cons No Measure - SBE/G&S |
N/A | |||
7/14/20 | 79050319001 | South Dade Park – Playground Improvements and Re-stripe parking lot |
SBE/Cons – 13.74% Goal |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
7/7/20 | RPQ NO. MIA-AA1412A | Perimeter Intrusion Detection System |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/30/20 | ND-18838-20 | Impact Resistant Storefront and Windows |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/8/20 | MDPDW20019 | Roof Replacement of the MDPD Professional Compliance Bureau |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
7/3/20 | 20200197 | Roadway Improvements to SW 268 St from SW 139 Ave to SW 119 Ave |
9.15% SBE-Con Goal 0.52% SBE- Services Goal 10.00% CWP Goal |
N/A | N/A | N/A |
9.15% SBE-Con Goal 0.52% SBE- Services Goal 10.00% CWP Goal |
N/A | ||
6/26/20 | S049896 | South Miami Heights Trailer Installation |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/25/20 | RPQ No. 20200203 | Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10.00% CWP Goal |
N/A | ||
6/19/20 | RPQ No. W180003 | Coral Gables Interior Renovation, Roof Replacement and Impact Resistant Windows |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/17/20 | S-955 | Two-Year Countywide Contract for Removal and Replacement of Sanitary Sewer Gravity Mains, With County Option to Renew for an Additional Two Years on a Yearly Basis |
SBE/Cons – 2.27% Goal |
N/A | N/A | N/A |
20.27% SBE- Con Goal 2.00% SBE - Goods Goal |
N/A | ||
6/16/20 | 0000206606 | SMH Pre-Engineered Building |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/11/20 | P0238 | Improvements to RA Pipeline (ST-2E) South District Wastewater Treatment Plant |
SBE/Cons – 3.22% Goal |
N/A | N/A | N/A |
3.72% SBE-Cons Goal 2.00% SBE-Goods Goal |
N/A | ||
6/5/20 | RPQ No. 16888 | Re-Roofing Project for DSWM’s 58th Street Truck Wash Building |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/4/20 | RPQ No. 19M026 | Re-Roofing Projects for the Department of Solid Waste Management’s Mosquito Control and Home Chemical Buildings |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/29/20 | R-213356 | CD 1.12(2) SDWWTP Chlorine Contact Chamber 2 Rehabilitation |
SBE/Bid Preference |
N/A | N/A | N/A | Trade Set Aside | Trade Set Aside | N/A | |
5/15/20 | AB-029A | MDAD BLDG. 863 Aerothrust Holdings Signage Replacement |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
5/13/20 | 31110618001 | Arcola Lakes – Bioretention Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
5/13/20 | RFQ 20-18262-KG | Receiving Area Building Painting |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A | Level 1 Set Aside | N/A | ||
5/12/20 | 20200142 | Safe Routes to School |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/8/20 | TAC-N-AA-111A | WFS Bldg 716 C & D Office Remodel |
SBE/Cons – 8.2% Goal |
N/A | N/A | N/A | 12.40% SBE- Cons Goal | N/A | ||
5/8/20 | RPQ No. 51635 | Helen Sawyer Generator Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
5/5/20 | C2020RACBA1 | Multiple Parks - Racquetball Court Resurfacing |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
5/1/20 | MCC-U010F-7.1 | MIA – New Elevator at E Satellite |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
5/1/20 | MCC-U010A-1 | MIA – Concourse E Structural Repairs |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A | 100% Trade Set Aside | N/A | ||
4/28/20 | RPQ No. 20200113 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/28/20 | RPQ No. 20200112 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/28/20 | RPQ No. 20200111 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/28/20 | RPQ No. 20200110 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/28/20 | RPQ No. 20200109 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/28/20 | RPQ No. 20200108 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/28/20 | AA171A | OPF Bridge Aviation Warehouse Bldg 4 – M |
SBE/Cons – 10.18% Goal |
N/A | N/A | N/A |
10.18% SBE/Cons Goal |
N/A | ||
4/28/20 | AA170A | OPF Bridge Aviation Warehouse Bldg 2 - KP |
SBE/Cons – 10.00% Goal |
N/A | N/A | N/A | 10.00% SBE/Cons Goal | N/A | ||
4/28/20 | AA169A | OPF Bridge Aviation Warehouse Bldg 3 - L |
SBE/Cons – 10.22% Goal |
N/A | N/A | N/A |
10.22% SBE/Cons Goal |
N/A | ||
4/22/20 | RQID2000096 | Maintenance and Repair Services for Conveyance Equipment |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/22/20 | 49350119001 | Kendall Soccer Park – Turf Replacement Phase 1 |
SBE/Cons – 5.07% Goal |
N/A | N/A |
5.07% SBE-Cons Goal |
N/A | |||
4/20/20 | 60220115002 | Black Point Park& Marina – Dock Reconstruction |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/15/20 | RPQ No. 412223 | William Lehman Center Car Cleaner Platform |
SBE/Cons – Set Aside |
N/A | N/A | N/A |
SBE/Cons-Set Aside |
SBE/Cons - Set Aside |
N/A | |
4/7/20 | AA-047A | OPF Embassair FBO (Fixed Based Operation) |
SBE/Cons – 15% Goal |
N/A | N/A | N/A |
15% SBE/Cons Goal |
N/A | ||
4/6/20 | DB20-DTPW-01 | Additional Elevators at Dadeland North Metrorail Station Parking Garage Project |
SBE/Cons – 10.65% DBE Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/6/20 | CIP168-DTPW19-CT1 | Construction Services for the Acoustical Barrier Replacement Phase 3 (Part 1 of 2) |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/31/20 | RPQ No. NMJACKELEC | Jackson Dade Head Start Electrical Meter Upgrade |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
3/30/20 | 20200106 | Roadway Resurfacing-Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | |||
3/30/20 | 20200107 | Roadway Resurfacing-Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
3/30/20 | 20200140 | Improvements to Downtown Mobility |
SBE/Cons – 35% Pavement Marking & Signage |
N/A | N/A |
35.00% SBE Con Goal No Measure - SBE Goods No Measure - SBE Services 10% CWP Goal |
N/A | |||
3/23/20 | RPQ No. 49680 | Work Order Contract 3 - South Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/23/20 | S-948 | CD 1.10 Odor Control Scrubber Buildings S0606 and S0608 Upgrade |
SBE/Cons – 7.11% Goal |
N/A | N/A | N/A |
7.61% SBE- Con Goal 2.00% SBE- Goods Goal |
N/A | ||
3/23/20 | RPQ No. 49676 | Work Order Contract 1- North Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/23/20 | RPQ No. P0240 | CD 1.04 South District Wastewater Treatment Plant Chlorine Building Improvements |
SBE/Cons – 14.0% |
N/A | N/A | N/A |
14.00% SBE - Con Goal |
N/A | ||
3/6/20 | RPQ No. 49678 | Work Order Contract 2 - Central |
SBE/Cons - No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/5/20 | 20200096 | Push Button Roadway Resurfacing – North |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
3/5/20 | 20200097 | Push Button Roadway Resurfacing – South |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
2/27/20 | RPQ No. 48805 | PHCD Vacant Unit Preparation Contract 2 |
SBE/Cons - No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/27/20 | RPQ NO. 48641 | PHCD Vacant Unit Preparation Contract 1 |
SBE/Cons - No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/25/20 | C60060116001 | Quail Roost – Playground Expansion |
SBE/Cons – 8.79% Goal |
N/A | N/A | N/A |
8.79% SBE - Con Goal |
N/A | ||
2/25/20 | 20200098 | Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue |
SBE/Cons – 10.10% Goal |
N/A | N/A | N/A |
14.32% SBE - Con goal 0.11% SBE - Services goal |
N/A | ||
2/24/20 | AAA-02-24-2020 | Ice Replacement Water Filter Cartridge |
No Measure |
N/A | N/A | N/A |
No Measure |
|||
2/21/20 | RPQ No. 49489 | Wynwood Elderly |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/18/20 | RPQ NO. W200008 | Electrical Contractor Assist |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/14/20 | AA-006A | Aero Miami III LLC/LATAM Façade Renovation Bldg. 709 |
SBE/Cons - No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/13/20 | C31100419002 | Gwen Cherry Park – Playground Renovation |
SBE/Cons – 6.61% Goal |
N/A | N/A | N/A |
6.61% SBE-Con Goal 10.00% CWP Goal |
|
N/A | |
2/13/20 | CIP097-DTPW20-CT2 | Construction Services for State Road 836 Express Bus Park & Ride Terminal (Panther Station) |
DBE – 17.00% Goal |
N/A | N/A | N/A |
17.00% DBE Goal |
N/A | ||
2/13/20 | RPQ No. 20200081 | Guardrail Improvements Multiple Sites A and B |
SBE/Cons - No Measure CWP Workforce Goal - 10% |
N/A | N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
2/13/20 | RPQ No. 20200090 | Guardrail Improvements Multiple Sites A and B |
SBE/Cons - No Measure 10.00% CWP goal |
N/A | N/A | N/A |
SBE/Cons - No Measure 10.00% CWP goal |
N/A | ||
2/11/20 | AB-006B | Aero Miami III LLC/LATAM ULD Rack at Bldg. 709 |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/11/20 | RFP-01515 | Development of Vizcaya Station Property |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/10/20 | RPQ No. 49128 | Palm Court elevators replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/10/20 | AA-159A | Installation of IDS, CCTV and ACS Systems |
SBE/Cons – No Measures |
N/A | N/A | N/A |
No Measures |
N/A | ||
2/10/20 | RPQ No. 49134 | Parkside 1 & 2 elevators replacement |
SBE/Cons– No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/10/20 | RPQ No. 20200079 | Bicycle Facilities on SW 136th Street from US-1 to Old Cutler Road |
DBE– 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/10/20 | ABO14A | Duty Free Americas (DFA) Refurbishment Store 727 (H – J Connector at MIA) |
SBE/Cons – 10% Goal |
N/A | N/A | N/A |
25% SBE-Con Goal |
N/A | ||
2/7/20 | RPQ No. W170082 | Animal Services Department ASD Latent Defects |
SBE/Cons – 8.33% SBE - Con Goal |
N/A | N/A | N/A |
8.33% SBE-Con Goal |
N/A | ||
2/7/20 | RPQ No. 20190339 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - Trade Set Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
2/5/20 | RPQ No. 20200028 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/5/20 | RPQ No. 20190286 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/5/20 | RPQ No. 20200029 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/5/20 | RPQ No. 20200030 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/4/20 | CIP168-DTPW19-CT | Construction Services for the Acoustical Barrier Replacement |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
2/4/20 | C40180019002 | Concord Park - Playground Renovation |
SBE/Cons – 5.69% Goal |
N/A | N/A | N/A |
5.69% SBE- Con Goal |
5.69% SBE-Con Goal | N/A | |
2/4/20 | C79040419001 | Modello Park - Playground Renovation |
SBE/Cons – 5.33% Goal |
N/A | N/A | N/A |
5.33% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
2/4/20 | C40310119002 | Kendall Indian Hammocks Park - Playground Renovation |
SBE/Cons – 7.06% Goal |
N/A | N/A | N/A |
7.07% SBE- Con Goal |
7.07% SBE - Con Goal | N/A | |
1/30/20 | 422003-18-010 | Hobie Island North Side Shoreline Roadway Protection of Rickenbacker Causeway |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
10.65% DBE Goal | N/A | |
1/28/20 | RPQ No. 48539 | Manor Park, Orchard Villas and Buena Vista Scattered Sites Roofs Replacement and Exterior Paint |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/27/20 | RPQ No. 47633 | Victory Homes Roofs Replacement and Exterior Paint |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/24/20 | RPQ No. 20200031 | Intersection Improvements |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/24/20 | 422003-17-003 | Rickenbacker Causeway Green Bike Lanes Segment A - Phase 1 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/24/20 | S-945 | 60-INCH FORCE MAIN (NL-1A) (WEST SEGMENT) ALONG NW 162ND STREET FROM NW 6 AVENUE TO NE 8 AVENUE |
SBE/Cons – 4.73% Goal |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20-Roof-01 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20-Roof-02 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20-Roof-03 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20Shutter01 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20Shutter02 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20Shutter03 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/22/20 | RPQ No. 48517 | Peters Plaza Elevator Replacement Fla 5-39 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/17/20 | S-947 | Furnish and Install 24-Inch Sanitary Force Main Along NW 170 St from NW 97 Ave to NW 75 Place |
SBE/Cons – 12.73% Goal |
N/A | N/A |
Under Review |
Under Review | N/A | ||
1/17/20 | AAA-01-17-2020-A | Corner Guards Replacement |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/17/20 | AAA-01-17-2020-B | Exterior Delaminated Glass Replacement |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/17/20 | AAA-01-17-2020-C | Facility Doors Replacement – Interior/Exterior |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/17/20 | RPQ No. 48366 | Wynwood, Liberty and Grove Homes Scattered Sites Roofs Replacement and Exterior Paint |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/13/20 | RPQ No. SADORSETT | Single Family Home Rehabilitation Program |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/13/20 | RPQ No. SAPEARLMUTTER-R | Single Family Home Rehabilitation Program |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/13/20 | RPQ No. SASNIPES | Single Family Home Rehabilitation Program |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/13/20 | RPQ No. 20200011 | Roadway Improvements to NW 82nd Avenue from NW 7th Street to NW 12th Street |
SBE/Cons – 15.47% Goal |
N/A | N/A | N/A |
0.26% SBE-Services Goal 15.20% SBE - Con Goal 10.00% CWP Goal |
N/A | ||
1/9/20 | RPQ No. 20190277-R | Drainage Improvements to C-100 Canal Outfalls Retrofit between SW 98 Ave. and SW 106 Ct. |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure 10% CWP Goal |
N/A | |||
1/6/20 | V-056-A | MIA – Cc D Mechanical Rooms Mildew Remediation |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
1/6/20 | S-957 | Improvements to RAS Pipeline (ST-2E) South District Wastewater Treatment Plant |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
12/31/19 | 593602-18-001 | RV CAMPGROUND & FACILITIES UPGRADES |
SBE/Cons – 8.84% Goal |
N/A | N/A | N/A |
11.18% SBE- Con Goal 4.00% SBE- Services Goal |
N/A | ||
12/30/19 | RPQ No. 47422 | Three Round Tower Bldg. B Fla 5-62 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/30/19 | RPQ No. 20190280 | Roadway Surfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/24/19 | RFQ 19-17851-KG | ACC-East Duct Heaters Replacement |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A |
Level 3 Set Aside |
N/A | ||
12/20/19 | 20190279 | Caribbean Boulevard Bridge (874431) over Canal C1-N Replacement |
SBE/Cons – 2.81% Goal |
N/A | N/A | N/A |
2.65% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
12/18/19 | RQMT2000007 | 60’ Battery-Electric Articulated Buses and Charging System |
SBE/Cons - 7.40% Goal SBE/Goods - 4.00% Goal |
N/A | N/A | N/A |
SBE/Cons - 7.40% Goal SBE/Goods - 4.00% Goal |
N/A | ||
12/18/19 | 20190289 | SW 42nd Avenue over Coral Gables Canal Bridge Construction |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/18/19 | 2017-035.03 | North Cruise Boulevard Extension Phase III |
SBE/Cons – 9.76% Goal |
N/A | N/A | N/A | No Measure | N/A | ||
12/10/19 | 20190238 | Bridge Replacement at SW 136th St Over Canal C-100A (Bridge No. 874420) |
SBE/Cons – 2.24% Goal |
N/A | N/A | N/A |
2.24% SBE-Con Goal |
N/A | ||
12/10/19 | 20190315 | Roadway Improvements to NW 7th St from NW 79th Ave, to NW 76th Ave. |
SBE/Cons – 9.41% Goal |
N/A | N/A | N/A |
8.22% SBE- Con Goal 0.34% SBE - Services Goal 10.00% CWP Goal |
N/A | ||
12/9/19 | RPQ No. P0236 | Replacement of 48-Inch Butterfly Valve and Actuator on Hydrotreaters (Softeners) 9, 10 and 12 at the Alexander Orr Jr. Water Treatment Plant |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/6/19 | R-207187 | CDWWTP PLANT 2 CLARIFIER BASIN No.4 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/6/19 | R-207079 | CDWWTP PLANT 2 CLARIFIER BASIN No.10 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/27/19 | RFQ 19-17782-HO | Jackson North Medical Center Asphalt Repairs |
SBE/Cons – 100% Level 1 Set-Aside |
N/A | N/A | N/A |
Level 1 Set Aside 100% - SBE- Con |
N/A | ||
11/19/19 | RPQ No. 46813 | Palm Court Fla 5-65 |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/14/19 | Z208510 | Pygmy Hippo Enclosure |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/5/19 | RPQ No. 46437 | Peters Plaza |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/29/19 | RPQ No. 46147 | PARKSIDE 1 & 2 ELEVATOR REPLACEMENT |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/23/19 | RPQ No. 20190276 | Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set Aside 2 10.00% CWP Goal |
N/A | ||
10/21/19 | 20190519 | Franjo Road Improvements from SW 184 Street to Old Cutler Road |
SBE/A&E – 34.16% Goal
|
N/A | N/A | N/A |
34.16% SBE-A&E Goal 13.11% SBE-Con Goal 4.00% SBE-Services Goal |
N/A | ||
10/17/19 | RFQ 19-17595-KG | ACC-West Doors Refurbishments |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A |
Level 1 Set-Aside 100% SBE-Con Goal |
N/A | ||
10/17/19 | A19-MDAD-02 | Facility Design and Construction Inspection Services (CIS) |
DBE – 28% Goal |
N/A | N/A | N/A |
28% DBE Goal |
N/A | ||
10/17/19 | RPQ No. 20190257 | Safe Route To Schools Locations Phase 18 |
DBE – 10.65% Goal |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/17/19 | RPQ No. 20190263 | Safe Route To School Locations Phase 19 |
DBE – 10.65% Goal |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/17/19 | E19-DTPW-08 | Professional Services for Bridge Inspection and Structural Analysis |
DBE – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/10/19 | 005R1-D14/03-AECOM | Source Removal at the BLDG 35 site, located within the Miami Opa-locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/10/19 | 007R1-D14/03-AECOM | Source Removal at the BLDG 9 site, located within the Miami Opa-locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/10/19 | 001-D14/01-AECOM | Source Removal & Additional Assessment at the BLDG 119 site, located within the Miami Opa-locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/3/19 | RFQ 19-17560-KG | Perdue AHU Replacements |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A |
Level 3 Set-Aside |
N/A | ||
10/3/19 | DB19-DTPW-03 | Roadway Improvements to NE 2 Avenue from NE 20 Street to NE 36 Street |
SBE/A&E – 100% Goal |
N/A | N/A | N/A |
100.00% SBE-A&E Goal Tier 3 Set-Aside |
N/A | ||
9/24/19 | 422003-19-003 | Hurricane Irma – West Bridge Bicycle – Pedestrian Underpass Fence Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/20/19 | 20190209 | FDOT Traffic Signals Preventive Maintenance |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
9/20/19 | HPEDREN18-R | Edison Community Resource Center Renovation |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/19/19 | 701601-12-004 | Homestead Bayfront Park – Boat Launch Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/5/19 | RPQ NO. 20190236 | Push Button Intersection Improvements South |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10.00% CWP Goal |
N/A | ||
9/4/19 | RFQ 19-17438-KG | West Wing – DTC Doors Replacements |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A |
Level 3 Set Aside 100% SBE-Con Goal |
N/A | ||
9/3/19 | RPQ No. 490901-05-002 | TREE ISLAND PARK - PHASE 1 PARK DEVELOPMENT |
SBE/Cons – 25.22% Goal |
N/A | N/A | N/A |
25.22% SBE- Con Goal 4.00% SBE-Services |
N/A | ||
8/30/19 | RPQ No. HI-199855 | Hurricane Irma – Multiple Parks Roof Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/30/19 | RPQ No. HI-199856 | Hurricane Irma – Multiple Parks Roof Repairs- North |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/28/19 | DRM-FCC-2019 | Florida City Canal Outfall and Equalizer Improvements |
SBE/Cons – 0.4% Goal |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/28/19 | DRM-PLG-2019 | South Miami-Dade Salt Intrusion Barrier |
SBE/Cons – 1.5% Goal |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/27/19 | RPQ No. Samiranda | Single Family Home Rehabilitation Project - Juan Miranda |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/27/19 | RPQ No. Sabethel-R | Single Family Home Rehabilitation Project – Laura Bethel |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/19/19 | RPQ No. 20190211 | Push Button – North Roadway Resurfacing |
SBE/Cons – Trade Set Aside 1 Trade Set Aside 2 |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set Aside 2 10.00% CWP Goal |
N/A | ||
8/19/19 | RPQ No. 20190212 | Push Button – South Roadway Resurfacing |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set Aside 2 0.00% CWP Goal |
N/A | ||
8/19/19 | 2017-035.02B | North Cruise Boulevard Extension – Phase II B |
SBE/Cons – 18.26% Goal |
N/A | N/A | N/A |
18.26% SBE-Con Goal 2.20% SBE-Goods Goal 10.00% CWP Goal |
N/A | ||
8/13/19 | AAA-08-13-2019 | XFINITY EAST PLAZA EXISTING FLOORING EXTENSION/UPGRADE |
SBE/Cons – 33.58% SBE-Con |
N/A | N/A | N/A |
33.58% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
8/13/19 | RPQ No. Mech 042 HVAC | Weatherization Assistance Program (WAP) |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/13/19 | RPQ No. WAP-042 B | Weatherization Assistance Program (WAP) |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/7/19 | RFQ 19-17326-HO | Time & Materials Contract for General Contractor Services |
SBE/Cons – 100% Level 1 Set-Aside |
N/A | N/A | N/A |
100% Level 1 Set Aside |
N/A | ||
8/6/19 | AAA-08-06-2019 | New Era Store Refresh |
SBE/Cons – 24.66% SBE/Cons Goal |
N/A | N/A | N/A |
24.66% SBE/Cons goal |
N/A | ||
8/6/19 | RPQ No. HI-Z203970 | Hurricane Irma – Zoo Miami Tiger Temple Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
8/6/19 | RPQ No. HI-Z203420 | Hurricane Irma – Zoo Miami Park Wide Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/2/19 | RFQ 19-17302-KG | Heat Pump AHU Replacement |
SBE/Cons – 100% Level 1 set-aside |
N/A | N/A | N/A |
100% Level 1 Set Aside |
N/A | ||
8/1/19 | RPQ NO. HPEDMOD19 | Edison Community Resource Center Modernization |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/29/19 | RFQ 19-17297-KG | Replace AHU 16 |
SBE/Cons – 100% Level 2 Set-Aside |
N/A | N/A | N/A |
100.00% Level 1 Set Aside |
N/A | ||
7/26/19 | RPQ No. 41785-R | Inspection & Repair and Installation Services to Liquefied Petroleum Gas (LPG) and Natural Gas (NG) Systems for PHCD |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/19 | AAA-07-25-2019 | Restroom Refresh |
25.00% SBE-Con Goal 10.00% CWP Goal |
N/A | N/A | N/A |
25.00% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
7/19/19 | 2017-035.02A | N. Cruise Blvd. Extension Phase 2A – FPL Vaults Relocation |
SBE/Cons – 12.99% Goal |
N/A | N/A | N/A |
21.71 SBE-Con Goal 10.00% CWP Goal |
N/A | ||
7/19/19 | 2019-001.02 | Cruise Terminal D and 1500 Building Tenant Relocation |
SBE/Cons – 12.65% Goal |
N/A | N/A | N/A |
20.73% SBE-Con Goal 1.97% SBE-Goods Goal 10.00% CWP Goal |
N/A | ||
7/17/19 | S-943 | CD 2.01(7) ELECTRICAL IMPROVEMENTS - SUBSTATIONS 7A, 8A, 9A, 10A |
SBE/Cons – 11.51% Goal |
N/A | N/A |
13.01% SBE- Gon Goal 3.02% SBE-Goods Goal |
N/A | |||
7/9/19 | S-914R | CD 1.11 GENERAL ELECTRICAL DESIGN – SUBSTATIONS 9, 10, 11, AND 12 |
SBE/Cons – 13.43% Goal |
N/A | N/A | N/A |
14.15% SBE-Con Goal 4.00% SBE-Goods Goal |
N/A | ||
7/8/19 | w-943 | Furnish and Install 36-Inch D.I. Water Main Along NW 106 St., from NW 107 Ave. to NW South River Dr. |
SBE/Cons – 15.65% Goal |
N/A | N/A |
15.65% SBE-Con 4.00% SBE-Goods |
N/A | |||
7/1/19 | RPQ NO. MECH 041- HVAC | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
7/1/19 | RPQ NO. WAP-041 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/2/19 | RPQ NO. MDADTF-005 | Terrazzo Flooring Service Contract |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/28/19 | RPQ P0226 | CD 1.11 - EMERGENCY GENERATORS 1 THROUGH 4 REHAB SOUTH DISTRICT WASTE WATER TREATMENT PLANT |
SBE/Cons – 17.21% Goal |
N/A | N/A |
18.00% SBE-Con Goal 4.00% SBE- Goods Goal |
N/A | |||
6/24/19 | MCC-W-016-B | MIA Employee Parking Lot Improvements |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Set-Aside - SBE-Con 10.00% CWP Goal |
N/A | ||
6/21/19 | 2019-001.01 | Video Wall and LAN Room Relocation |
SBE/Cons – 11.90% Goal SBE/G&S – 2.00% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/18/19 | 199676 | CD1: 12(2) C12 CONTACT CHAMBER 4 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Trade Set Aside 10.00% CWP Goal |
N/A | ||
6/18/19 | 199428 | CD 2.06 CDWWTP Plant 2 Train4 Rehab |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Trade Set Aside |
N/A | ||
6/18/19 | 199661 | CD1: 12(2) C12 CONTACT CHAMBER 3 |
SBE/Construction – Bid Preference |
N/A | N/A | N/A |
Trade Set Aside 10.00% CWP Goal |
N/A | ||
6/14/19 | RPQ NO. 41785 | Inspection & Repair and Installation Services to Liquefied Petroleum Gas (LPG) and Natural Gas (NG) Systems for PHCD |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/3/19 | RFP-00945 | Development of Property Adjacent to the Miami Intermodal Center |
No Measure (Revenue Generating) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/3/19 | RPQ No. 41485 | REAC Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/3/19 | RPQ No. Mech 040-HVAC | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/3/19 | RPQ No. WAP-040 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/28/19 | RFP-0499 | LED Smart Lighting and Smart County System |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside |
N/A | ||
5/25/19 | S-944 | 60-INCH FORCE MAIN (NL-1A) BETWEEN THE INTERSECTIONS OF NE 151 STREET & BISCAYNE BOULEVARD AND NE 163 STREET & NE 8 AVENUE |
SBE/Cons – 6.82% Goal |
N/A | N/A |
6.83% SBE-Con Goal 1.98% SBE-Goods Goal 10% CWP Goal |
N/A | |||
5/23/19 | RPQ NO. 380827-R | Hurricane Irma Related Repairs at the Tri-Rail Station Ceiling Slats and Lighting |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/21/19 | RPQ NO. 365027-R | HURRICANE IRMA RELATED - REPAIR OF DAMAGED FENCE |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/20/19 | 591001-16-004 | CAMP MATECUMBE -NEW PLAYGROUND AND PARKING LOT |
SBE/Cons – 10.96% Goal |
N/A | N/A | N/A |
10.96% SBE-Con Goal 10.00% SBE-Services Goal |
N/A | ||
5/17/19 | DB19-DTPW-01 | Design-Build Services - South Corridor (South-Dade Transitway) Rapid Transit Project |
DBE – 24% Goal |
N/A | N/A | N/A |
5.00% DBE Goal |
N/A | ||
5/13/19 | RPQ No. 20190116 | Street Lighting Maintenance |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/13/19 | RPQ No. 20190115 | Street Lighting Maintenance |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/13/19 | RPQ No. 20190122 | Roadway Resurfacing |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
5/13/19 | RPQ No. 20190121 | Roadway Resurfacing |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
5/13/19 | RPQ No. 20190120 | Roadway Resurfacing |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
5/13/19 | RFQ-19-16997-SW | Purchase/Install Two (2) Boilers at JMH Behavioral Health |
SBE/Cons – Set-Aside |
N/A | N/A | N/A |
100% Level 3 Set-Aside |
N/A | ||
5/10/19 | W-947 | Furnish and Install 36-lnch D.I.P. Water Main along NW/NE 135 Street, from NW 7 Avenue to NE 16 Avenue and FOOT State Road 916/NW/NE 135 Street Improvements |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/9/19 | RFP No. 01258 | Baggage Handling System Operation and Maintenance |
SBE/Cons – 26% Goal |
N/A | N/A | N/A |
30.00% SBE-Con Goal No Measure - SBE-G&S 10.00% CWP Goal |
N/A | ||
5/9/19 | X-032B | OPF RTR M2C Road and Facilities-Construction |
SBE/Cons – 7% |
N/A | N/A | N/A |
9.63% SBE-Con Goal No Measure- SBE-G&S |
N/A | ||
5/1/19 | RPQ No. P0225 | Hialeah Water Treatment Plant Chemical Building Lime Slakers and Structural Rehabilitation |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure - SBE/Con No Measure - SBE/G&S 10.00% CWP Goal |
N/A | ||
4/30/19 | MCC-W-120-A | MIA – NTD D41 Road Guardrail & Access Ladder |
SBE/Cons – Trade Set Aide |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/24/19 | RPQ No. 381460 | RENOVATION OF NORTHEAST BUS TRANSPORTATION BUILDING AND OPERATORS BATHROOMS |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/19/19 | P0223 | Downtown Doral PS0014 Reconstruction Sanitary Sewage pump Station |
SBE/Cons – 15.5% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/18/19 | RPQ No. MDFRD-MOLDRRR | Mold Remediation and Repair/Restoration Services |
SBE/Cons – Under Review |
N/A | N/A |
Trade Set Aside |
N/A | |||
4/17/19 | RPQ No. MDFRD-AIRHK | AirHawk Air Cleaning Devices Email Notification System lnstallation |
SBE/Cons – Trade Set Aside 10.00% CWP Goal |
N/A | N/A | N/A |
SBE/Cons – Trade Set Aside 10.00% CWP Goal |
N/A | ||
4/17/19 | ITB No. MDAD-02-17 | Hazardous Material Removal Services |
SBE/Cons – 5% Goal |
N/A | N/A | N/A |
5.00% SBE-Con Goal 0.37% SBE-Goods Goal 0.63% SBE-Services Goal 10% CWP Goal |
N/A | ||
4/15/19 | RPQ 422801-17-004 | Crandon Marina – Boat Slip 2 Dredging |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure |
N/A | |||
4/15/19 | RPQ No. MDFRD-581OPHGRR | MDFR ST 25 HELICOPTER HANGAR - REBID |
SBE/Cons – 24.00% |
N/A | N/A |
24.00% SBE-Con Goal |
N/A | |||
4/15/19 | MCC-V-089-B | MIA - Building 716 Restroom Upgrade and Renovation- Concourses F, G, H |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | |||
4/15/19 | RPQ No. 39808 | Annie Coleman Gardens Fla 5-15 |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
Under Review |
Under Review |
N/A | |
4/12/19 | RPQ No. Mech 039-HVAC | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/12/19 | RPQ No. WAP-039 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/5/19 | 20190078 | Roadway Resurfacing |
SBE/Cons – Trade Set-Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
4/5/19 | 20190079 | Roadway Resurfacing |
SBE/Cons – Trade Set-Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
4/5/19 | DB19-SEA-01 | Cruise Terminal F Expansion and Berthing Re-Alignment Program |
SBE/A&E – 18% Goal SBE/Cons – 8.92% Goal SBE/G&S – 4% Goal |
N/A |
N/A | N/A |
8.91% SBE-Con 4.00% SBE-S Goal 10.00% CWP Goal
|
N/A | ||
4/4/19 | RPQ No. LMADE | Marie Irvine Ade Home Rehab County Wide |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/1/19 | RPQ No. WAP-038 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/26/19 | RPQ No. MECH 037-HVAC | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/25/19 | RPQ No. 1003877-2019 | Terrazzo & Miscellaneous Flooring Installation, Maintenance, Repairs and/or Replacement at MDAD Operated Facilities |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
3/25/19 | RPQ No. WAP-037 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/21/19 | 20170318 | TRAFFIC SIGNAL IMPROVEMENTS AT NW 74 STREET AND NW 102 AVENUE AND NW 74 STREET AND NW 97 AVENUE |
SBE/Cons – Signing & Pavement Markings – 0.8% Goal |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/15/19 | 2017-039.04 | Cruise Terminals B and C Conversion to C – AC System Upgrade and Roof Repairs |
SBE/Cons – 13.91% Goal |
N/A |
N/A | N/A |
18.01% SBE-Con Goal 2.08% SBE-Goods Goal 10.00% CWP Goal |
N/A | ||
3/15/19 | RPQ NO. 1003877-2019 | Terrazzo & Miscellaneous Flooring Installation, Maintenance, Repairs and/or Replacement at MDAD Operated Facilities |
SBE/Cons – 10% Goal |
N/A |
N/A | N/A |
No Measure -SBE/Cons No Measure - SBE/GS 10% CWP Goal |
N/A | ||
3/14/19 | RPQ No. WAP-036 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/14/19 | RPQ No. WAP-036 M | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/14/19 | RPQ NO. WAP-HVAC-101 | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/8/19 | S-915 | CD 2.15(3) PLANT 2 CLUSTER 3 DIGESTER UPGRADES |
SBE/Cons – 8.54% Goal |
N/A |
N/A | N/A |
10.70% SBE-Con Goal 1.50% SBE-Goods Goal |
N/A | ||
3/6/19 | RPQ NO. 338296 | Annie Coleman Gardens Fla 5-16, REAC Repairs in Scattered Sites |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/6/19 | S-946 | Two-Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Cured-In-Place Pipe Lining Method with County Option to Renew for an Additional Two Years on a Yearly Basis |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/28/19 | RPQ No. 20190063 | Emergency Response for Sidewalk Repairs |
DBE– 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/28/19 | RPQ No. 20190064 | Emergency Response for Traffic Signals Restoration |
DBE– 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/28/19 | RPQ No. 20190065 | Emergency Response for Ground Mounted Traffic Control Signs Restoration |
DBE– 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
10.65% DBE Goal | N/A | |
2/28/19 | RPQ No. 20190066 | Emergency Response for Street Lighting Restoration |
DBE– 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/28/19 | RPQ No. 20190067 | Emergency Response for Pumping Operations |
DBE– 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/28/19 | RPQ No. 20190068 | Emergency Response for Storm Drain Cleaning |
DBE– 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/27/19 | RPQ No. 37485 | PHCD REAC 2018 Exterior Work At Various Sites |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/27/19 | RPQ No. 38038 | REAC 2018 at Robert King High |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/26/19 | RPQ No. LMDUKES | SINGLE FAMILY HOME REHABILITATION PROGRAM - LAURENE DUKES |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/25/19 | RPQ No. LMHOLLIDAY | SINGLE FAMILY HOME REHABILITATION PROGRAM - EDYTH RICHBURG-HOLLIDAY |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/25/19 | RPQ No. 37995 | Falk Turnkey located 445 SW 16 AVE - Parking Lot Lights Replacement and Replacement of existing Electrical Panel |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/25/19 | 2018-025 | New Crane Tie Downs for Cranes 15 and 16 |
SBE/Cons – 10.15% SBE/Good - 3.47% SBE/Services – 0.90% |
N/A |
N/A | N/A |
Under Review |
Under Review |
N/A | |
2/25/19 | RPQ No. 36676 | VTC Work Order Contract 3 – Central Area |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/25/19 | RPQ No. 36673 | VTC Work Order Contract 1 - North Area 1 |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/21/19 | RPQ No. LMBROWN | Single Family Home Rehabilitation Program - Madeleine Brown |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/21/19 | RPQ No. LMWILLIAMS | Single Family Home Rehabilitation Program - Deniseia Williams |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/20/19 | RPQ No. LMGREEN | Single Family Home Rehabilitation Program - Rose Green |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/15/19 | Z00099A-R GOB ESP | The Larcenia J. Bullard Plaza |
SBE/Cons – 19.92% Goal |
N/A | N/A |
19.92% SBE-Cons Goal 1.76% SBE-Goods Goal |
||||
2/14/19 | RPQ No. Satensley | Single Family Home Rehabilitation Program |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/11/19 | 400701-19-001 | Tamiami Park – Superhero Autism Sensory Garden |
SBE/Cons – 10.35% Goal |
N/A |
N/A | N/A |
10.35% SBE/Cons Goal |
N/A | ||
2/8/19 | RPQ No. 37381 | REAC Repairs |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/8/19 | 2017-039.02 | Cruise Terminals B and C Conversion to C – Waterside Improvements |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/8/19 | 2017-039.03 | Cruise Terminals B and C Conversion to C – Building Improvements |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/7/19 | S-940 | CD Project 5.9 – Upgrade/Replace Pump Station 0301 |
SBE/Cons – 13.27% Goal SBE/G&S – 5.25% Goal |
N/A | N/A |
14.72% SBE-Con Goal 5.25% SBE - Goods Goal |
N/A | |||
2/5/19 | 222302-17-004 | Haulover Park – Pedestal Receptacle Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/5/19 | CIP097-DTPW18-CT1 | SR 836 Express Bus Park & Ride Terminals (Tamiami) |
DBE Goal – 18% |
N/A |
N/A | N/A |
18% DBE Goal |
N/A | ||
2/4/19 | M2016-031.01 | Sanitary Sewer Repairs |
SBE/Cons – 7.16% |
N/A | N/A |
7.16% SBE- Con Goal 1.85% SBE- Goods Goal 1.49% SBE - Services Goal 10.00% CWP Goal |
N/A | |||
2/4/19 | 493201-19-001 | Superhero Autism Sensory Garden |
SBE/Cons - 10.35% Goal |
N/A |
N/A | N/A |
10.35% SBE-Con Goal |
N/A | ||
1/30/19 | RPQ No. SAMARTOS | Adel Martos Home Rehab County Wide |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
1/22/19 | RPQ NO. 36677 | Work Order Contract 4 - South Area |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
1/22/19 | RPQ NO. 36674 | Work Order Contract 2- North Area |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
1/14/19 | 374790-IRP-278 (7360) | LEHMAN YARD PERIMETER SECURITY FENCE |
SBE/Cons – 18% for concrete |
N/A | N/A |
18.00% SBE - Con Goal No Measure - SBE - Goods No Measure - SBE Services |
N/A | |||
1/11/19 | 20190024 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Miami Beach for a Traffic Signal at Alton Rd and 4th Street |
SBE/Cons - No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
1/7/19 | S-922 | CD 1.05(2) Effluent Pump Station Electrical Improvements for Pumps 1 through 6 |
SBE/Cons – 8.62% Goal |
N/A |
N/A | N/A |
8.62% SBE- Con Goal 3.03% SBE-Goods |
|
N/A | |
1/3/19 | 20190002 | Safe Route to Schools Locations, Phase 14, FM# 435480-1 |
DBE Goal – 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
1/3/19 | 20190003 | Safe Route to Schools Locations, Phase 15, FM# 435481-1 |
DBE Goal – 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/21/18 | MDAD-P256E | MIA West Cargo Fuel Tender Facility Relocation Project |
SBE/Cons - 14%; SBE/G&S - 0.6% |
N/A |
N/A | N/A |
14.00% SBE-Con Goal 0.6% SBE-Goods Goal 10% CWP Goal |
N/A | ||
12/18/18 | 20180267 | Sidewalk Repairs |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
12/17/18 | S-918 | Replacement of 8-Inch Sanitary Sewer Sub-Aqueous Crossing (Inverted Siphon) under the Sabal Lake Canal (PS 0021) |
SBE/Cons – 5.09% Goal |
N/A | N/A |
5.09% SBE-Con Goal 1.03% SBE-Goods Goal 1.54% SBE-Services Goals |
N/A | |||
12/13/18 | MDAD-W057A | MIA Fuel Facility Tank 21 – Water Supply |
SBE/Cons – 16% |
N/A |
N/A | N/A |
16.00% SBE-Con Goal 1.00% SBE-Goods Goal 10.00% CWP Goal |
N/A | ||
12/12/18 | 2010-038.05 | North Bulkhead Bays 1 Through 3 Grout Injections |
SBE/Cons – 8.78% Goal |
N/A |
N/A | N/A |
8.78% SBE - Con Goal |
N/A | ||
12/10/18 | RPQ NO. 35196 | PHCD REAC 2018- FOR TWIN LAKES, PALM TOWER AND PALM COURT SITE AND EXTERIOR BLDGS. REPAIRS |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
12/10/18 | RPQ No. 35350 | PHCD REAC Repairs 2018 |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
12/7/18 | RPQ No. 35315 | PHCD REAC Repairs 2018 |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
12/6/18/ | RPQ No. 35159 | PHCD REAC 2018 |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
12/6/18 | RPQ No. 35097 | PHCD REAC 2018 repairs |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
12/5/18 | RPQ No. 35103 | ANNIE COLEMAN 5-14-3 CONTRACT TO MAKE REAC REPAIRS IN ALL BUILDINGS LOCATED AT NW 54 ST AND NW 22 AVE |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
Under Review |
Under Review |
N/A | |
12/5/18 | RPQ No. 35104 | ANNIE COLEMAN 5-14-4 CONTRACT TO MAKE REAC REPAIRS IN ALL BUILDINGS LOCATED AT NW 54 ST AND NW 22 AVE |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
12/5/18 | RFQ 18-16524-KG | LTCC Grease Trap Replacement |
SBE/Cons – 100% Level 3 Set-Aside |
N/A |
N/A | N/A |
Level 3 Set Aside 100% |
N/A | ||
12/5/18 | RPQ No. 35154 | PHCD REAC 2018 repairs |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
12/5/18 | RPQ No. 35192 | ANNIE COLEMAN 5-14-2 CONTRACT TO MAKE REAC REPAIRS IN ALL BUILDINGS LOCATED AT NW 54 ST AND NW 22 AVE |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
Under Review |
Under Review |
N/A | |
12/4/18 | RPQ No. 35062 | Annie Coleman 5-14 |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
12/4/18 | RPQ No. P0220 | NDWWTP INSTALLATION OF FA-1LR AND FA-4LR LOWER ZONE FLORIDAN AQUIFER MONITORING WELLS AND PLUGGING AND ABANDONING LOWER ZONES OF FA-1L AND FA-4L |
SBE/Cons –No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure - SBE - Cons, Goods, Services |
N/A | ||
12/3/18 | 593401-15-001 | Serena Lakes Park – Playground Improvements |
SBE/Cons – 12.53% Goal |
N/A |
N/A |
12.53% SBE-Cons Goal |
N/A | |||
11/30/18 | DB18-SEA-01 | New Cruise Terminal H Program |
SBE/Cons –8.92% , SBE/A&E – 18%; SBE/G&S – 12% |
N/A |
N/A | N/A |
8.91% SBE-Con Goal 4.00% SBE - Services 10% CWP |
N/A | ||
11/30/18 | 187577 | SDWWTP EFFLUENT WET WELLS Nos. 3 & 4 AND DRAIN LINES REHABILITATION PROJECT CONSENT DECREE PROJECT 1.05(1) PCTS No. 13179 |
SBE/Cons – Bid Preference |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/30/18 | 189719 | SDWWTP OXYGENATION BASIN No. 4 REHABILITATION CONSENT DECREE PROJECT 1.03(1) PCTS No. 13176 |
SBE/Cons – Bid Preference |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/29/18 | MCC-Y-146-A | TMB – Tamiami Executive Airport Hangar #109 |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/29/18 | MCC-U-010-C | MIA – Airside Operations Break Room |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/28/18 | MCC-Y-141-A | MIA – Perimeter Fence Barged Wire Improvement |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/28/18 | MCC-V-102-A | MIA – OPF Custom Building Remodeling |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/26/18 | 188519 | CDWWTP Plant 1 Clarifier No. 3 Structural Rehabilitation Project Consent Decree Project |
SBE/Cons – Bid Preference |
N/A |
N/A | N/A |
100% Trade Set Aside |
N/A | ||
11/21/18 | MCC-X-113-A | MIA – American Airlines Admiral Club Infrastructure & New Stair |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/21/18 | MCC-R-127-A | Tamiami Executive Airport Hangar #102 |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/20/18 | RPQ NO. 20180253 | Roadway Resurfacing Contract |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | |||
11/20/18 | RPQ No. SACASH | Annette Cash Home Rehab County Wide |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
11/20/18 | RPQ No. SABETHEL | Laura Bethel Home Rehab County Wide |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
11/20/18 | RPQ No. SALEWARS | Valencia Lewars Home Rehab County Wide |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
11/20/18 | RPQ No. 20180252 | Roadway Resurfacing Contract |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 |
N/A | |||
11/19/18 | MCC-X-116-A | MIA – Concourse H – Bathroom Renovation |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/15/18 | RPQ No. 20180251 | Venetian Bridge Bicycle Improvement |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A |
No Measure |
N/A | |||
11/15/18 | DB18-DTPW-01 | Design-Build Services - Phase 2 - The Underline |
DBE – 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
11/14/18 | RPQ No. 380827 | Hurricane Irma Related Repairs at the Tri-Rail Station Ceiling Slats and Lighting project |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
11/14/18 | MCC-I-111-B | Miami Homestead General Aviation Security Enhancement |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
11/13/18 | RFQ 18-16402-KG | North Wing Roof Replacement |
SBE/Cons – 100% Level 3 Set-Aside |
N/A |
N/A | N/A |
100% Set Aside Level 3 |
N/A | ||
11/8/18 | MCC-T-069-A | MIA – RFC Buildings 890, 891 & 896 Fire Main Replacement |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
11/6/18 | C19-CUA-CALEB01 | 1-Story Addition and Renovation: Joseph Caleb Auditorium (Caleb) |
SBE/Cons – 20% Goal |
N/A |
N/A | N/A |
22.63% SBE- Con Goal 1.40% SBE-Goods Goal |
N/A | ||
11/6/18 | C19-CUA-MDCA02 | Renovation and Upgrades: Miami-Dade County Auditorium (MDCA) |
SBE/Cons – 15.94% Goal |
N/A | N/A |
15.94% - SBE-Con Goal |
N/A | |||
11/1/18 | MCC-S-048-A | MIA – Building 845 Parking Lot Improvement |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set-Aside 10% CWP Goal |
N/A | ||
10/18/18 | MCC-U-010-D-3 | MIA – Concourse E Satellite 400 Hz System Upgrade Phase II |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||
10/15/18 | RFQ 18-16319-KG | LTCC Fan Coil Units |
SBE/Cons – 100% Level 3 Set-Aside |
N/A |
N/A | N/A |
Level 3 Set Aside 100% |
N/A | ||
10/11/18 | MCC-T072H-4 | MIA – Lower Concourse E FIS 1st and 3rd Floor Door Replacement |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
Trade Set Aside |
N/A | ||
10/9/18 | DB18-WASD-02 | Design-Build Services for the Construction of South and Central District Wastewater Treatment Plants Sludge Thickening and Dewatering Buildings |
SBE/A&E – 14.00% Goal |
N/A |
N/A | N/A |
SBE/GS - 2.00% Goal SBE/Cons - 9.43% Goal CWP - 10% Goal |
N/A | ||
10/4/18 | RPQ No. 32704 | Helen Sawyer Site lights |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
9/28/18 | FB-01070 | Furnish and Replace Playground Canopies |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
9/24/18 | RPQ No. H2018-019 | CBP RPM Booth Roof Repair |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
9/20/18 | RFQ 18-16213-KG | Chilled Water Valve Replacement |
SBE/Cons – 100% Level 1 Set-Aside |
N/A |
N/A | N/A |
Level 1 Set Aside 100% |
N/A | ||
9/20/18 | 590501-15-001 | Forest Lakes Park – Landscaping and Playground |
SBE/Cons – 9.56% Goal |
N/A |
N/A |
9.56% SBE/Cons Goal |
N/A | |||
9/19/18 | 220901-13-004 | Greynolds Park – Bridges, Culverts & Freshwater Flow Restoration |
SBE/Cons – 11.69% Goal |
N/A |
N/A |
11.69% SBE/Cons Goal 10.00% CWP Goal |
N/A | |||
9/14/18 | RPQ No. M2018-028 | Paving Improvements (Portwide) |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
100% Trade Set Aside |
N/A | ||
9/9/18 | RPQ No. 27003 | Perrine Gardens Roof Repairs / Site 340 |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
9/6/18 | RFQ 18-16232-KG | East Tower 7 BMT Unit Renovations |
SBE/Cons – 100% Level 3 set-aside |
N/A |
N/A | N/A |
Level 3 Set Aside |
N/A | ||
9/4/18 | RPQ No. HI-176667A1 | Hurricane Irma – Multiple Parks Fencing Repairs – South 1 |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
9/4/18 | RPQ No. HI-176667A2 | Hurricane Irma – Multiple Parks Fencing Repairs – South 2 |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | N/A | ||
8/29/18 | W-942 | 72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street |
SBE/Cons – 5.27% Goal |
N/A | N/A |
3.17% SBE/GS Goal 5.27% SBE/Cons Goal |
N/A | |||
8/28/18 | S-914 | CD 1.11 General Electrical Design – Substations 9,10,11, and 12 |
SBE/Cons – 13.31% Goal |
N/A | N/A |
4.00% SBE/GS 15.57% SBE/Cons 10% CWP Goal |
N/A | |||
8/22/18 | W130069 | The Empowerment Center |
SBE/Cons - 25.6% |
N/A |
N//A | N/A |
2.00% SBE/GS Goal 25.64% SBE/Cons Goal |
N/A | ||
8/22/18 | RPQ No. 365027 | Hurricane Irma – Repair of Damaged Fence |
SBE/Cons – No Measure (Federal and Grant monies) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
8/13/18 | 20180089 | People’s Transportation Plan Roadway Improvements to SW 137 Ave from US-1 to SW 200 Street |
SBE/Cons – 8.47% Goal |
N/A | N/A |
1.53% SBE/GS Goal 8.47% SBE/Cons Goal 10% CWP Goal |
N/A | |||
8/13/18 | Z00099A | Larcenia J. Bullard Plaza |
SBE/Cons – 24.21% Goal |
N/A |
N/A | N/A |
1.76% SBE/GS Goal 19.92% SBE/Cons Goal |
N/A | ||
8/13/18 | E18-SEA-02 | Environmental Services |
SBE/Cons – 30.00% Goal |
N/A |
N/A | N/A | Under Review | Under Review | N/A | |
8/9/18 | RPQ No. HI-Z187010 | Hurricane Irma – Canopy Shade Repair |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
8/9/18 | 018R1-D14/03-APTIM | Soil Assessment Activities and Reporting at the Liberty Square Development Project- Blocks 2,3,4,6, and 8, located in the vicinity South of NW 67th ST & North of NW 62nd ST Between NW 15th AVE & NW 12th AVE, on behalf of the Department of Public Housing & Community Development |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
8/9/18 | 20180177 | Push Button South Roadway Resurfacing Contract |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Trade Set Aside 2 Trade Set Aside 1 No Measure - SBE/GS 10% CWP Goal |
N/A | |||
8/8/18 | 20170176 | Push Button North Roadway Resurfacing Contract |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Trade Set Aside 2 Trade Set Aside 1 No Measure - SBE/GS 10% CWP Goal |
N/A | |||
8/7/18 | 222101-15-001 | Arch Creek Park – Shelter Replacement |
SBE/Cons – No Measure (Federal Grant monies) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
8/7/18 | S-921 | SDWWTP Municipal Injection Wells (OOL Project SE-2) |
No Measure |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
8/7/18 | S-920 | CDWWTP Municipal Injection Wells (OOL Project CE-2) |
No Measure |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
8/3/18 | RFP 18-16146-TC | Pre-Construction and Construction Management Services for the Vertical Expansion of the Diagnostic Treatment Center (DTC) Vertical Expansion Intensive Care Unit (ICU) Tower |
SBE/Cons : 18.10% Goal |
N/A |
N/A | N/A |
21.60% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
7/23/18 | RPQ No. 20180151 | Emergency Relief Contracts for 2018 Hurricane Season |
DBE – 10.65% Goal |
N/A |
N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
7/23/18 | RPQ No. 20180150 | Emergency Relief Contracts for 2018 Hurricane Season |
DBE – 10.65% Goal |
N/A |
N/A | N/A | Under Review | Under Review | N/A | |
7/23/18 | RPQ No. 20180149 | Emergency Relief Contracts for 2018 Hurricane Season |
DBE – 10.65% Goal |
N/A |
N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
7/23/18 | RPQ No. 20180148 | Emergency Relief Contracts for 2018 Hurricane Season |
DBE – 10.65% Goal |
N/A |
N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
7/23/18 | RPQ No. 20180147 | Emergency Relief Contracts for 2018 Hurricane Season |
DBE – 10.65% Goal |
N/A |
N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
7/23/18 | RPQ No. 20180146 | Emergency Relief Contracts for 2018 Hurricane Season |
DBE – 10.65% Goal |
N/A |
N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
7/19/18 | RPQ No. MDFRD-563-24-FS | MDFR ARS FOAM SUPPRESSION SYSTEM |
No Measure |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
7/18/18 | RPQ No. MDFRD-562-29-B | MDFR Sweetwater Fire Station 29 |
No Measure (Grant Contribution) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
7/11/18 | RFQ 18-16051-KG | UC Cooling Tower Repairs |
SBE/Cons – 100% Level 3 Set-Aside |
N/A |
N/A | N/A | 100% Level 3 Set Aside | 100% Level 3 Set Aside | N/A | |
7/9/18 | H2018-014 | Cruise Terminals F and G Roof Canopy Repairs |
No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
7/9/18 | HI-51060118001 | Hurricane Irma – Matheson Marina Repairs |
No Measure (Federally Funded) |
N/A |
N/A | No Measure | No Measure | N/A | ||
7/5/18 | RFQ 18-16057-KG | JMT Cooling Tower Replacement |
SBE/Cons – 100% Level 3 Set-Aside |
N/A |
N/A | N/A |
100% SBE/Cons Goal |
N/A | ||
6/22/18 | 20180104 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Hialeah for Roadway Improvement Project along NW 102 Ave from NW 138 Street to NW 145 Place |
SBE/A&E : Land Surveying – 8.50% |
N/A | N/A |
1.74% SBE/GS Goal 8.31% SBE/Cons Goal |
N/A | |||
6/22/18 | 20180103 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Hialeah for Roadway Improvements to NW 142 Street from NW 107 Ave to NW 97 Ave |
SBE/Cons – Signing & Pavement Markings – 2.29%; Concrete – 4.62%; Landscaping 2.12% |
N/A | N/A |
2.12% SBE/GS Goal 7.44% SBE/Cons Goal |
N/A | |||
6/22/18 | MCC-V-059-A | MIA – RCF D60 ate New Swing Doors |
Trade Set Aside |
N/A |
N/A | N/A | Trade Set Aside | Trade Set Aside | N/A | |
6/21/18 | RFQ 18-16009-KG | Replace AHU Coils |
SBE/Cons – 100% Level 3 Set-Aside |
N/A |
N/A | N/A |
100% Level 3 Set Aside |
100% Level 3 Set Aside | N/A | |
6/19/18 | RPQ No. 27575 | Parkside I & II Stucco repairs and exterior paint, etc. |
No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
6/14/18 | RPQ No. HI – Z185226 | Hurricane Irma – Zoo Miami Aviary Re-Alignment |
No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
6/12/18 | RPQ No. 26564 | Phyllis Wheatley stucco repairs and exterior paint, etc. |
No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
6/11/18 | RFQ-18-16006-SW | Purchase/Install Air Handling Units and Rood Top Air Handling Unit Behavioral Health and Highland Pavilion |
SBE/Cons – Set-Aside |
N/A |
N/A | N/A | 100% Level 3 Set Aside | 100% Level 3 Set Aside | N/A | |
6/6/18 | RPQ No. HI-999999-17-011 | Hurricane Irma – Miami-Dade County Marinas Repairs & Restoration |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
5/31/18 | 20180064 | People’s Transportation Plan Roadway Improvements to SW 137 Ave from H.E.F.T. to US-1 |
SBE/Cons – 11.71% Goal (10.16% Concrete, 1.55% Pavement marking & signage) |
N/A |
1.28% SBE/GS Goal 11.71% SBE/CONS Goal 10.00% CWP Goal |
N/A | ||||
5/31/18 | NMLANDOWHS | Landon Head Start / EHS Playground Install |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
5/25/18 | RPQ No. P0213 | One-Year County-Wide Contract for Rehabilitation of Manholes, Inflow and Infiltration Repair |
SBE/Cons – 11.50% Goal SBE/G&S – No Measure (Insufficient Availability) |
N/A |
N/A | N/A | 11.50% SBE/Cons Goal | 11.50% SBE/Cons Goal | N/A | |
5/24/18 | RPQ No. P0215 | One-Year County-Wide Contract for Rehabilitation of Sanitary Sewer by the Cured-in-Place Pipe Lining Method in Wellfield Protection Areas (FY2018 Project B) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
5/24/18 | MCC-U-074-A | MIA – Dolphin Flamingo 40 Year Re-Certification |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
Trade Set Aside 10% CWP goal |
N/A | ||
5/22/18 | RPQ No. 20180096 | Intersection Improvements Contract (Push Button- North) |
SBE/Cons – Trade Set-Aside(s): Traffic Stripes and Markings: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A |
N/A | N/A |
Trade Set Aside 2 No Measure Trade Set Aside 1 10% CWP Goal |
N/A | ||
5/22/18 | RPQ No. 20180097 | Intersection Improvements Contract (Push Button- South) |
SBE/Cons – Trade Set-Aside(s): Traffic Stripes and Markings: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A |
N/A | N/A |
No Measure Trade Set Aside 2 Trade Set Aside 1 10.00% CWP Goal |
N/A | ||
5/21/18 | RPQ No. 26221 | Medvin Apartments Emergency Demolition |
Medvin Apartments Emergency Demolition |
N/A |
N/A | N/A | Under Review | Under Review | N/A | |
5/18/18 | RPQ No. HI-185430 | Hobie Island and Virginia Key Repairs & Restoration |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
5/16/18 | 016-D14/03-ARCADIS | Monitoring Well Installation and Sampling at the Continental Park site, located at 10100 SW 82 AVE, on behalf of the Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
5/15/18 | 2017-034 | SFCT – Cargo Yard Densification eRTGs Phase I |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
5/15/18 | 2016-058.02 | Seaboard Marine Cargo Terminal Redevelopment Phase II |
SBE/Cons – 12.56% Goal |
N/A |
N/A | N/A | Under Review | Under Review | N/A | |
5/10/18 | RPQ No. 20180088 | Sidewalk Repairs – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
5/10/18 | RPQ No. 20180086 | Sidewalk Repairs – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
5/10/18 | RPQ No. P0216 | Proposed 16 & 12-Inch Sanitary Gravity Sewer Along SW 200 St. (Caribbean Blvd.) from SW 110 Ct. to SW 114 Ave. |
SBE/Cons – 14.28% |
N/A |
N/A | N/A |
8.00 SBE/GS Goal 14.27% SBE/Cons Goal 10% CWP Goal |
N/A | ||
5/9/18 | RPQ No. 20180090 | William Powell Bridge Expansion Joint and Fender System Rehabilitation |
SBE/Cons – 10.6% Goal for Pavement Marking & Signage |
N/A | N/A |
10.63% SBE/Con Goal No Measure SBE/GS |
N/A | |||
5/1/18 | MCC-U-010-D-2 | MIA – PC Air Temporary EGCW Plant for Lower Service |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A | 100% Trade Set Aside | 100% Trade Set Aside | N/A | |
4/30/18 | 592500-17-002 | Hurricane Irma – Zoo Miami Roofing Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | Under Review | Under Review | N/A | |
4/27/18 | RPQ No. 10148473 | Sanitary Sewer Pipe & Manhole repairs using Cured in Place Pipe Liner Installation at various MDAD location |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
4/26/18 | RPQ No. HI-183992 | Hurricane Irma – Matheson Hammock Park Building Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A | No Measure | No Measure | N/A | |
4/26/18 | RFQ 18-15725-KG | HPB Roof Replacement |
SBE/Cons – 100% Set-Aside |
N/A |
N/A | N/A | 100% Level 3 Set Aside | 100% Level 3 Set Aside | N/A | |
4/23/18 | 012-D14/03-NOVA | Monitoring Well Installation and Sampling at the Modello Park site, located within the Miami-Opa Locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons– No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/19/18 | RPQ No. MDFRD-554-IRM-C | Hurricane Irma Related Fence Repairs (Central Stations and Port of Miami) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/18/18 | 012-D14/03-AECOM | Source Removal at the Bldg 147 Site, located within the Miami Opa-Locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/13/18 | 20180055 | NE 96 Street from NE 2 Ave to NE 10 Ave |
SBE/Cons – Signing & Pavement Markings: 10.3% Goal; Concrete: 9.9% Goal; Landscaping: 0.4% Goal |
N/A |
N/A | N/A |
20.15% SBE/Cons Goal |
N/A | ||
4/10/18 | 006-D14/03-AMEC | Soil Sampling and Geotechnical Evaluation at the Ash Landfill Site, located within the Miami International Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/5/18 | 2017-035.01B | North Cruise Boulevard Extension – Phase IB |
SBE/Cons – 9.55% Goal |
N/A |
N/A | N/A |
2.95% SBE/GS Goal 9.55% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
4/4/18 | RPQ No. 24304 | Vacant Unit Preparation Four Different Sites (Modernization) |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/3/18 | X149A | Concourse G Aircraft Precooling and 400 Hz Converter Installation |
Concourse G Aircraft Precooling and 400 Hz Converter Installation |
N/A |
N/A | N/A |
12.67% SBE Cons Goal No Measure- SBE/GS Goal 10% CWP Goal |
N/A | ||
4/3/18 | 008-D14/03-AMEC | Monitoring Well, Data Logger and Surface Water Monitor Installation and Sampling associated with the FPL Turkey Point site, located between Card Sound RD and Florida City Canal, on behalf of the Division of Environmental Resources Management (DERM), RER |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/3/18 | 320801-14-002 | Pelican Harbor Melina – Boat Ramp Parking |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/3/18 | 422801-13-004 | Crandon Park – Crandon Shoreline Stabilization |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
4/2/18 | V037A | MIA North Terminal Development Program & Central Base Apron Reconstruction |
DBE – 12.2% Goal |
N/A |
N/A | N/A |
12.30% DBE Goal |
N/A | ||
4/2/18 | RPQ No. 20180063 | Safe Route to Schools Location, Phase 17 |
DBE – 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
3/29/18 | MCC-T-072-E | MIA – Lower Concourse “E” 3rd Floor Sterile Corridor |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
Trade Set Aside 100% SBE-Cons Goal |
N/A | ||
3/29/18 | MCC-P-256-D | MIA – Fumigation Facility Relocation |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
Trade Set Aside No Measure |
N/A | ||
3/27/18 | RPQ No. 23263 | Contracted PHCD Vacancy Preparations 3 |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
Under Review |
Under Review |
N/A | |
3/26/18 | RPQ No. 21370 | Security Lighting at Florida City Elderly |
No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/22/18 | RPQ No. NMCCPPLAY | Installation of E.H.S Playgrounds |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/21/18 | MCC-P-256-C(I) | MIA – Relocation of Swissport Interior Offices |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
Trade Set Aside 100% SBE/Cons Goal |
N/A | ||
3/15/18 | 011-D14/03-APTIM | Monitoring Well Installation and Sampling at the Building 410 site, located within the Miami-Opa Locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons– No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/14/18 | MCC-R-023-A | MIA – Outfalls No. 2 and No. 3 Boom & Skimmer System |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
Under Review |
Under Review |
N/A | |
3/14/18 | MCC-P-256-C(A) | MIA – Relocation of AMS Shop and Offices |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
Trade Set Aside 100% SBE Construction Goal |
N/A | ||
3/14/18 | MCC-P-256-C(T) | MIA – Relocation of Triangle Shop and Offices |
SBE/Cons – Trade Set-Aside |
N/A |
N/A | N/A |
Trade Set Aside 100% SBE Construction Goal |
N/A | ||
3/14/18 | RFQ 18-15741-KG | Alamo Exterior Painting |
SBE/Cons– 100% Level 3 Set-Aside |
N/A |
N/A | N/A |
100% Level 3 Set Aside |
N/A | ||
3/14/18 | RTQ-00866 | Reflective Lettering & Application |
Bid Preference Set Aside (up to 100k) |
N/A |
N/A | N/A |
Bid Preference Set Aside (up to 100k) |
N/A | ||
3/12/18 | S-919 | Installation of 14” Nominal Pipe Size HDPE Sewage Force Main Canal Crossing (C-102N) VIA H.D.D. at Old Dixie Highway & North of SW 232 Street |
SBE/ Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/12/18 | RPQ No. 23167 | Contracted PHCD Vacancy Preparations 2 |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/8/18 | RPQ No. 21579NSP | New Construction of Two CBS Single One Story Family Homes/NSP1 |
SBE/Cons – No Measure (Federally Funded) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/8/18 | 003-D14/03-CEI | Source Removal at the West End Cargo Area (WECA) Roads and Utilities site, located within the Miami International Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons– 7.6% Goal for concrete curbing and paving; 0.0% for source removal (Insufficient Availability) |
N/A |
N/A | N/A |
7.60% SBE/Cons Goal |
N/A | ||
3/7/18 | RPQ No. 20180049 | Roadway Resurfacing Contract |
SBE/Cons– Trade Set Aside for Traffic Stripes and Markings: Painted and/or Thermoplastic and Concrete; sidewalk and/or curb and gutter |
N/A |
N/A | N/A |
Trade Set Aside 1 - SBE/Cons Goal Trade Set Aside 2 - SBE/Cons Goal No Measure - SBE/GS Goal 10.00% CWP Goal |
Trade Set Aside 1 - SBE/Cons Goal |
N/A | |
3/6/18 | RPQ No. 20180048 | Roadway Resurfacing Contract |
SBE/Cons– Trade Set Aside for Traffic Stripes and Markings: Painted and/or Thermoplastic and Concrete; sidewalk and/or curb and gutter |
N/A |
N/A |
Trade Set Aside 1 - SBE/Cons Goal Trade Set Aside 2 - SBE/Cons Goal No Measure - SBE/GS Goal 10.00% CWP Goal |
Trade Set Aside 1 - SBE/Cons Goal |
N/A | ||
3/5/18 | 004R1-D14/03-AMEC | Groundwater Assessment, Soil Management Plan and Field Oversight at the Underline project, located in the vicinity of South of Miami River to SW 98 St along US1, on behalf of the Miami-Dade Department of Transportation and Public Works Department |
SBE/Cons– No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/5/18 | 012-D14/03-APTIM | Soil Assessment Activities and Reporting for the South District WWTP Diesel Spill Site, located in the vicinity of 8950 SW 232 St, on behalf of the Water and Sewer Department |
SBE/Cons– No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
3/2/18 | E17-DTPW-03 | Construction Engineering and Inspection Services for DTPW |
DBE – No Measure (Federally Funded) |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
3/2/18 | MCC P-256-C(S) | MIA – Relocation of Swissport Shop and Offices |
SBE/Cons – Trade Set Aside |
N/A |
N/A | N/A |
100% SBE/Cons Goal Trade Set Aside 10% CWP Goal |
N/A | ||
3/1/18 | RPQ No. 20180020 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
DBE – 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
3/1/18 | RPQ No. 20180021 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
DBE – 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
3/1/18 | RPQ No. 20180022 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
DBE – 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
3/1/18 | RPQ No. 20180023 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
DBE – 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
3/1/18 | RFQ No. MCC-9-18 | Miscellaneous Construction Contract |
SBE/Cons – 20% |
N/A |
N/A | N/A |
Under Review |
Under Review |
N/A | |
2/23/18 | RPQ No. 20180019 | Safe Route to Schools Locations, Phase 16 |
DBE – 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/22/18 | 2008-122.13B | Cruise Terminal J CBP Improvements Phase II |
SBE/Cons – 11.62% |
N/A |
N/A | N/A |
3.00% SBE/GS Goal 11.71% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
2/21/18 | RQID1800070 | Neon Signs/ Lighting Systems PreQual |
All work orders will be required to be presented to SBD for review and application of SBE-Con measures, CWP and Responsible Wages if applicable |
N/A |
N/A | N/A |
All work orders will be required to be presented to SBD for review and application of SBE-Con measures, CWP and Responsible Wages if applicable |
N/A | ||
2/16/18 | X-032A | RTR |
SBE/Cons – 1.22% |
N/A |
N/A | N/A |
1.22% SBE/Cons Goal 10% CWP Goal |
N/A | ||
2/15/18 | RPQ No. P0212 | CDWWTP 90” Ocean Outfall Permanent Repair of the 90” Valve Structure |
SBE/ Cons – No Measure (Insufficient Availability) |
N/A |
N/A | N/A |
No Measure |
N/A | ||
2/12/18 | 20170307 | Request to Advertise for Construction Engineering and Inspection Services & Resident Compliance Specialist Services for Florida Department of Transportation Local Agency Program Projects |
DBE– 10.65% Goal |
N/A |
N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/9/18 | RFQ 18-15627-KG | Central Building Roof Repairs |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A |
100% SBE Cons Goal Level 3 Set Aside |
N/A | |||
2/7/18 | RPQ No. 21856 | Homestead Gardens |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/5/18 | MCC-T-072-F | MIA – Lower Concourse “E” Mechanical Room Upgrades |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
100% Trade Set Aside |
N/A | ||
2/5/18 | RPQ No. 20180014 | People’s Transportation Plan Roadway Improvements to SW 216 St from SW 127 Ave to SW 112 Ave |
SBE/Cons – 14.8% (13.1% Concrete; 1.7% Pavement marking & signage) |
N/A | N/A | N/A |
1.23% SBE/GS Goal 14.54% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
2/2/18 | E14-RER-03-014-APTIM | Source (Soil) Removal at the Ameila Earhart Park site, located in the vicinity of 401 E 65 St, on behalf of the Department of Parks, Recreation and Open Spaces |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/2/18 | 013-D14/03-APTIM | Monitoring Well Installation and Groundwater Sampling for the North County Neighborhood Center, located in the vicinity of 3201 NW 207 St, on behalf of the Community Action and Human Services Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/2/18 | RPQ No. H2018-011 | RCCL Canopy Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
2/2/18 | IB-00825 | Greenhouse Repair Services |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/2/18 | E18-DTPW-02 | Request for Advertise for Construction Engineering and Inspection Services & Resident Compliance Specialist Services for Florida Department of Transportation Local Agency Program Projects |
DBE– 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/2/18 | E14-RER-03-018-D14-03-APTIM | Soil Assessment Activities and Reporting at the Liberty Square Development Project – Blocks 2-9, located in the vicinity South of NW 67th St & North of NW 62nd St between NW 15th Ave & NW 12th Ave, on behalf of the Department of PHCD |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
2/1/18 | 693601-13-002 | Homestead Air Reserve Park – Sanitary Sewer Improvements |
SBE/Cons – 5.17% for Site Work (asphalt cutting, concrete and asphalt restoration) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
2/1/18 | Z000145 | Dade County Courthouse – Basement Column/ Slab Remediation, 73 W. Flagler Street, Miami, FL 33128 |
SBE/ Cons – 17.73% Goal |
N/A | N/A | N/A |
1.02% SBE/GS Goal 17.75% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
1/31/18 | S-892 | CD 2.08 Secondary Clarifiers Plant 2, CD 2.10 Return Sludge PS Plant 2, and CD 2.01(3) Electrical Improvements |
SBE/ Cons – 8.66% Goal |
N/A | N/A | N/A |
1.44% SBE/GS Goal 8.65% SBE/Cons Goal |
N/A | ||
1/31/18 | S-882R | CD 1.02 Oxygen Production Upgrades |
SBE/ Cons – 19.21% Goal |
N/A | N/A | N/A |
4.80% SBE/GS Goal 17.46% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
1/23/18 | FB-00816 | Building Management System at TGK |
No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/23/18 | RPQ No. 362336 | Dadeland North Parking Garage Fire Suppression |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
2.00% SBE/Goods Goal No Measure - SBE/Cons |
N/A | ||
1/23/18 | W-944 | Alexander Orr Jr. Water Treatment Plant Lime Kiln Electrical Switchgear Building |
SBE/ Cons – 7.51% Goal SBE/ G&S – 1.79% Goal |
N/A | N/A | N/A |
1.79% SBE/GS Goal 8.46% SBE/Cons Goal |
N/A | ||
1/23/18 | 2010-038.04 | North Bulkhead Steel Reinforcement and Fenders |
SBE/Cons – 8.05% Goal |
N/A | N/A | N/A |
8.05% SBE/Cons Goal 10% CWP Goal |
N/A | ||
1/23/18 | MCC P-256-B | MIA – Interior Wash Rack for Swissport Facility |
SBE/Cons – Trade Set-Aside: Package “A” General Work; Package “B” Tile; Package “C” Drywall; Package “D” Painting; Package “F” Fire Sprinklers; Package “G” Plumbing; Package “H” HVAC; Package “I” Electrical |
N/A | N/A | N/A |
100% SBE - Const Goal Trade Set Aside |
N/A | ||
1/19/18 | 20170321 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Miami for Roadway Improvements to NE 42 Street Railroad Crossing and Federal Highway/NE 4 Court |
SBE/Cons – Signing & Pavement Markings – 1.2% |
N/A | N/A | N/A |
2.38% SBE/GS Goal 9.58% SBE/Cons Goal 10.10% CWP Goal |
N/A | ||
1/19/18 | RPQ 18706 | Palm Towers windows and store |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/17/18 | RPQ No. 502501-15-002 | Charles Deering Estate – Reroofing of Three Buildings |
SBE/Cons – No Measure (FDOS State Grant monies) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/12/18 | RPQ No. 2017-018.01 | Cruise Terminal E Waterside Improvements |
SBE/Cons – 11.06% |
N/A | N/A | N/A |
1.25% SBE/GS Goal 11.14% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
1/11/18 | RFQ 18-15581-HO | East Tower Millwork and Countertop Installation |
SBE/Cons – 100% Level 3 Set Aside |
N/A | N/A | N/A |
Level 3 Set Aside 100% SBE/Cons Goal |
N/A | ||
1/9/18 | RPQ No. MDADTF-004 | Terrazzo Flooring Service Contract |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/5/18 | 601901-15-001 | Debbie Curtain Park – New Playground |
SBE/Cons – 16.00% Goal |
N/A | N/A |
4.00% SBE/GS goal 16.00% SBE/Cons Goal 10.00% CWP Goal |
N/A | |||
1/2/18 | MCC-P-109-A | MIA – Bearing Modifications Bridges 3062 B & C |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 2 - 21.15% SBE/Cons Goal Trade Set Aside 1 - 25.82% SBE/Cons Goal Trade Set Aside - 52.03% SBE/Cons Goal |
Trade Set Aside 2 - 21.15% SBE/Cons Goal |
N/A | |
12/29/17 | RPQ No. 21370 | Security Lighting at Florida City Elderly |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/28/17 | RPQ No. MDFRD-546-IRM-S | Hurricane Irma Related Repairs (South End Stations) |
No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/28/17 | RQID1800043 | Weatherization, Retrofitting and Rehab. Serv. Prequalification Pool |
Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/27/17 | RPQ No. 18418 | Emergency Land Clearing for Hurricane Irma at Three Round Towers |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/20/17 | S-895 | CD 3.06 NORTH DISTRICT WASTEWATER TREATMENT PLANT PRIMARY CLARIFIERS AND ODOR CONTROL UPGRADES |
SBE/ Cons – 10.63% Goal |
N/A | N/A | N/A |
12.01% SBE/Cons Goal |
N/A | ||
12/19/17 | RPQ No. 19022 | Perrine Gardens Plumbing Emergency Repairs |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/15/17 | 790402-05-001 | Live Like Bella Park - New LEED Community Recreation Center |
SBE/Cons – 17.56% Goal |
N/A | N/A |
1.61% SBE/GS Goal 20.16% SBE/Cons Goal 10.00% CWP Goal |
N/A | |||
12/14/17 | RPQ No. 17430 | South and North Region RPQ 17430 Modernization |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/14/17 | S-896 | CD 3.05(2) North District Wastewater Treatment Plant Secondary Clarifiers Upgrades (Remaining Scope of Work) |
SBE/Cons – 11.49% Goal |
N/A | N/A | N/A |
12.61% SBE/CONS |
N/A | ||
12/12/17 | RFQ 9743-39 (Master Contract RQID1300059: 9743-0/23) | Post Hurricane Hazardous Stumps: Removal, Loading, Hauling, and Backfilling |
No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/11/17 | RPQ No. 20170315 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170314 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170313 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170312 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170311 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170310 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170309 | Debris Removal from Storm Drainage Structures – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170305 | Sidewalk Repairs – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170304 | Sidewalk Repairs – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170303 | Sidewalk Repairs – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. 20170302 | Sidewalk Repairs – Hurricane Irma |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
12/11/17 | RPQ No. HI-176667 | Hurricane Irma – Multiple Parks Fencing Repairs – South |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/11/17 | RPQ No. HI-176666 | Hurricane Irma – Multiple Parks Fencing Repairs – Central |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/11/17 | RPQ No. HI-176660 | Hurricane Irma – Multiple Parks Fencing Repairs – North |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/11/17 | RFQ 17-15402-SW | Replace Medical Vacuum System in West Wing Basement |
SBE/Cons – 10% Goal |
N/A | N/A |
Level 3 Set Aside 100% SBE/Cons Goal |
N/A | |||
12/11/17 | 592500-17-001 | Asian Elephant Caging |
Trade Set Aside SBE/Cons |
N/A | N/A | N/A |
Trade Set Aside SBE/Cons |
N/A | ||
12/7/17 | E14-RER-03-002-AECOM | Site Assessment Report Addendum at the CSXT Parcels A-E site, located within the Miami International Airport near NW 12 St & NW 69 Ave, on behalf of the Miami-Dade Aviation Department |
No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/6/17 | E14-RER-03-002-CBI | Soil Boring Installation, Sampling and Reporting at the Bldg 209 site, located within the Opa-Locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/5/17 | W-938 | Alexander Orr Jr. Water Treatment Plant East High Service Pump No. 6 Replacement |
SBE/Cons – 3.20% Goal |
N/A | N/A |
1.79% SBE/GS Goal 3.20% SBE/CONS Goal |
N/A | |||
11/27/17 | RTQ-00298 | Rehabilitation of 54-Inch PCCP Force main on West Flagler Street from SW 78 Place to Meter Station East of SW 72 Ave |
SBE/Cons – Trade Set Aside #1 for Paving |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/27/17 | RPQ No. 172248 | Marva Bannerman Park – Tennis Court Improvements |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/22/17 | RPQ No. 18474 | Emergency Land Clearing at sites 250 & 260 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
|||
11/14/17 | E14-RER-01-006R1-NOVA | Phase 2 Environmental Site Assessment along the Proposed Roadway Improvements Project, located along NW 58 St between NW 97 Ave and SR 826, on behalf of the Miami-Dade Department of Transportation and Public Works (DTPW) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure |
N/A | |||
11/8/17 | MCC-X-032A | RTR |
SBE/Cons – 1.22% Goal CWP - 10.00% Goal |
N/A | N/A | N/A |
1.22% SBE/Con Goal 10.00% CWP Goal |
N/A | ||
11/8/17 | RFQ 17-15297-HO | ACC-WEST AHU #220 Replacement |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A |
Level 3 Set Aside 100% |
N/A | ||
11/7/17 | RPQ No. 20170279 | Roadway Resurfacing Contract |
SBE/Cons – Trade Set-Aside and Markings: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A | N/A | N/A |
No Measure - SBEGS Trade Set Aside 1 - SBE/CONS Trade Set Aside 2 - SBE/CONS 10% CWP Goal |
N/A | ||
11/7/17 | RPQ No. 20170280 | Roadway Resurfacing Contract |
SBE/Cons – Trade Set-Aside and Markings: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A | N/A | N/A |
No Measure - SBE/GS Trade Set Aside 1 - SBE/CON Trade Set Aside 2 - SBE/CON 10% CWP Goal |
N/A | ||
11/6/17 | RPQ NO. 17833-1937REQ | Emergency repairs at Dwelling Structure 1937 NW 58 Street |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/3/17 | RPQ No. 17212 | Emergency Roofing Repairs at Gwen Cherry Site 291 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/1/17 | RPQ No. 16678 | Little River Plaza |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/31/17 | RPQ No. 17742 | Malcolm Ross/Myers Center |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/30/17 | RPQ No. 7139 | Emergency Concrete Repairs at Naranja Site |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/30/17 | RPQ No. 17055 | Emergency Mold Remediation – Palm Towers #106 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/27/17 | S-897 | CD 1.07 SDWWTP Digesters and Control Building Upgrades, ACID Phase and Substation 7 & 8 |
SBE/Cons – 9.68% Goal |
N/A | N/A | N/A |
0.86% SBE/GS Goal 10.24% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
10/26/17 | RPQ No. P0210 | CD 2.21 Pump Station 1 and CD 2.54(4) Ventilation Improvements |
SBE/Cons – 9.9% Goal |
N/A | N/A | N/A |
1.28% SBE/GS Goal 9.00% SBE/Cons Goal 13.60% CWP Goal |
N/A | ||
10/23/17 | RPQ No. 17211 | Emergency Roof and other water intrusion repairs due to Hurricane Irma |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/20/17 | S-912 | CD 3.06 North District Wastewater Treatment Plant Disinfection Facility Improvements |
SBE/Cons – 13.29% Goal |
N/A | N/A | N/A |
1.57% SBE/GS Goal 13.29% SBE/Cons Goal |
N/A | ||
10/20/17 | S-911 | Installation of 42-Inch Ductile Iron Water Main Between the Intersection of Biscayne Blvd. (SR-5/US-1) and NW 5th Street to Port of Miami |
SBE/Cons – 8.26% Goal |
N/A | N/A | N/A |
5.35% SBE/GS Goal 8.65% SBE/CONS Goal 10% CWP Goal |
N/A | ||
10/19/17 | RPQ No. P0207 | Pump Station 1 and 2 Wet Well Connections |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
3.06% SBE/Cons Goal 13.60% CWP Goal |
N/A | ||
10/16/17 | X117A | TAC-R Centurion Lounge Shell and Core Work |
SBE/Cons – 90% Goal |
N/A | N/A | N/A |
16% SBE/Cons Goal 10% CWP Goal |
N/A | ||
10/13/17 | RQPD1700012 | Emergency Repair for MDPD |
No Measure (Emergency Repair) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/10/17 | FB-00717 | Golf Netting – Crandon Golf – Hurricane Irma |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/6/17 | RPQ No. 16711 | Annie Coleman Emergency Site Repairs |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/6/17 | RPQ No. 12113 | Little River Plaza Emergency Improvements |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/6/17 | RPQ No. 16329 | Emergency parking lot paving and leveling at Wards Towers |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/5/17 | RPQ No. 16133 | Emergency Plumbing Repairs at Harry Cain |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
|||
10/5/17 | RFQ 17-15228-KG | Park Plaza East Expansion Joint Replacement |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 1 Set Aside 100% |
N/A | ||
10/3/17 | RPQ No. 8303-245NSP1 | Emergency Plumbing Repair at Dwelling Structure 245 NW 22 Street |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/29/17 | RFQ-17-15193-CW | JMH Central Building East Penthouse Waterproofing Project |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 3 Set Aside 100% |
N/A | ||
9/28/17 | RPQ No. 320802-12-001 | Pelican Island – Day Dock Replacement |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/26/17 | RPQ No. 16308 | Emergency Tree and Debris Removal |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
|||
9/25/17 | RFQ-MDAD-17-03 | Airport Signage Design, Fabrication and Installation |
No Measure |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
9/22/17 | RPQ No. 20170253 | Roadway Resurfacing Contract – Push Button North |
SBE/Cons – Trade Set-Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic and Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A | N/A | N/A |
No Measure Trade Set Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | ||
9/22/17 | RPQ No. 20170254 | Roadway Resurfacing Contract Push Button – South |
SBE/Cons – Trade Set-Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic and Concrete: Sidewalk and/or Curb and Gutter |
N/A | N/A | N/A |
No Measure Trade Set Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | ||
9/22/17 | RPQ No. 15806 | Emergency Fence and Gates repairs on various sites |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/20/17 | MDAD W-104A PH2/3 | Phase II and III Warehouse and Office Building at Carrie Meek Warehouse Distribution Center |
SBE/Cons – 7.85% Goal |
N/A | N/A | N/A |
0.08% SBE/GS Goal 0.51% SBE/AE Goal 7.41% SBE/Cons Goal 10% CWP Goal |
N/A | ||
9/20/17 | 2015-047 | Gantry Cane Rail Replacement and Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/19/17 | MCC-R-023-A | MIA – Outfalls No. 2 and No. 3 Boom and Skimmers System |
SBE/Cons – Trade Set-Aside: Package “B” Fencing; Package “C” Electrical |
N/A | N/A | N/A |
No Measure Trade Set Aside 10% CWP Goal |
N/A | ||
9/18/17 | RFQ 17-15180-KG | Park Plaza East Fire Sprinkler Repairs |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 1 Set Aside 100% SBE/Cons Goal |
N/A | ||
8/31/17 | RFQ No. MCC-9-17 | Miscellaneous Construction Contract |
SBE/Cons – 20% Goal |
N/A | N/A | N/A |
20% SBE/Cons goal |
N/A | ||
8/24/17 | RPQ No. 12995 | Arthur Mays Village Duplexes Exterior Lighting |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/22/17 | RPQ No. 12938 | Arthur Mays Village Interior Courtyard Lighting |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/21/17 | RPQ No. 13683 | Mold Remediation – Annie Coleman |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/21/17 | RPQ No. 13612 | Water Intrusion-Reveals-Edison Plaza |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/21/17 | S-908 | CD 5.3 – Upgrade to Pump Station No. 0692 |
SBE/Cons – 14.59% Goal |
N/A | N/A | N/A |
6.80% SBE/GS Goals 14.59% SBE/Cons Goals |
N/A | ||
8/18/17 | S-909 | CD 2.15(2) CDWWTP Plant 2 Cluster 2 Digester Upgrades |
SBE/Cons – 8.52% Goal |
N/A | N/A | N/A |
2.71% SBE/GS Goal 10.43% SBE/Cons Goal |
N/A | ||
8/15/17 | FB-00680 | Access Control Point Barriers Maint and Repair |
No Measure |
N/A | N/A |
No Measure |
N/A | |||
8/11/17 | RPQ No. P0205 | Installation of Two Bar Screens in Settlement Tank at CDWWTP |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
21.21% SBE/Cons goal |
N/A | ||
8/11/17 | E14-RER-03-010-CEI | Source (Soil) Removal at the Devon Aire Park Site, located in the vicinity of 10411 SW 122 Ave, on behalf of Regulatory and Economic Resources Dept. (RER), Division of Environmental Resources Management (DERM) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/11/17 | RM-6-18/20 | Pavement Repairs |
SBE/Cons – 13% Goal SBE/G&S – .24% Goal |
N/A | N/A |
0.29% SBE/GS Goal 16.10% SBE/Cons Goal 10% CWP Goal |
N/A | |||
8/10/17 | W016A | MIA Tank Farm Utilities Modifications |
SBE/Cons – 10% Goal |
N/A | N/A | N/A |
4.23% SBE/GS Goal 12.58% SBE/Cons Goal 10% CWP Goal |
N/A | ||
8/10/17 | RPQ No. MDADGG-006 | MDAD/MCC Work Order-Based Program Emergency Priority Maintenance Construction Services for Glass & Glazing |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/9/17 | MCC-V100A | MIA – Concourse “J” Gates Advanced Vehicle Visual Docking System (VDGSJ) |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
92.63% SBE/CONS Goal 10.00% CWP Goal |
N/A | ||
8/8/17 | RFQ-17-15091-SW | Exhaust Fan Replacements |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
100% Level 3 Set Aside |
N/A | ||
8/7/17 | RPQ No. 20170232 | WASD Street Rehabilitation Contract |
SBE/Cons – Trade Set-Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic |
N/A | N/A | N/A |
Trade Set Aside No Measure 10% CWP Goal |
N/A | ||
8/7/17 | RPQ No. 20170231 | WASD Street Rehabilitation Contract |
SBE/Cons – Trade Set-Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic |
N/A | N/A | N/A |
Trade Set Aside No Measure |
N/A | ||
8/3/17 | RFQ 17-15102-TC (RTQ-00299) | Test and Balance Services at Jackson North Medical Center |
No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
|||
8/2/17 | RPQ No. P0202 | John E. Preston Bulk Sodium Hypochlorite Storage Facility |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
4.00% SBE/GS 22.34% SBE/Cons |
N/A | ||
7/28/17 | 2010-051.03 | Cruise Terminal J Seawall Repairs |
SBE/Cons – 9.21% Goal |
N/A | N/A | N/A |
0.55% SBE/GS 8.32% SBE/CONS 10% CWP Goal |
N/A | ||
7/28/17 | RPQ No. 2010-038.03 | North Cruise Berths 1-6 Cathodic Protection |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
7/28/17 | RPQ No. 11807 | North Region Area 2 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/17 | RPQ No. 11752 | South Region Area 1 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
|||
7/27/17 | AAA-07-27-2017-A | Event Level Dressing Rooms & Locker Rooms Refresh |
45% SBE/Cons Goal |
N/A | N/A | N/A |
45% SBE/Cons Goal |
N/A | ||
7/27/17 | AAA-07-27-2017-B | 400 Level Carpet & Vinyl Flooring Replacement |
64% SBE/Cons Goal |
N/A | N/A | N/A |
64% SBE/Cons Goal |
N/A | ||
7/25/17 | RFP No. 2017-01-DD | Developer Services for Elizabeth Virrick I |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/17 | RPQ No. 20170205 | Joint Participation Agreement (JPA) between Miami-Dade County and the Village of Palmetto Bay for the SW 82 Avenue and SW 168 Street Traffic Circle Project |
SBE/Cons – 8.71% Goal |
N/A | N/A | N/A |
20% SBE/Cons Goal |
N/A | ||
7/24/17 | AAA-07-24-2017-A | Cold Surface Replacement |
28.00% SBE/Cons goal |
N/A | N/A | N/A |
28.00% SBE/Cons goal |
N/A | ||
7/24/17 | AAA-07-24-2017-B | Concourse Refresh at Section 326 |
48.50% SBE/Cons goal |
N/A | N/A | N/A |
48.50% SBE/Cons goal |
N/A | ||
7/24/17 | AAA-07-24-2017-C | 400 Level Service Corridors Flooring Replacement |
65.00% SBE/Cons goal |
N/A | N/A | N/A |
65.00% SBE/Cons goal |
N/A | ||
7/24/17 | DB17-ISD-01 GOB ESP/ Z000144 | Design-Build Services for Electrical Repairs at the Miami-Dade County Courthouse |
SBE/A&E – 25.00% Goal |
N/A | N/A | N/A |
SBE/GS 2.33% SBE/AE 5% SB/Cons 24.85% CWP 10.00% |
N/A | ||
7/24/17 | IRP204-DTPW17-CTI | Train to Wayside Communication Equipment Installation at Metrorail Stations |
SBE/Cons – 7% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
7/24/17 | RPQ No. 10124 | Emergency Installation of Mailboxes at Goulds & Arthur Mays |
SBE/Cons- No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/14/17 | RFP 17-14995-TC | Pre-Qualified Pool of General Contractors |
SBE/Cons – Tier 1 – 100% Set-aside (with 4.39% standardization trade exceptions) |
N/A | N/A |
Level 3 Setaside w/exception 10.00% CWP Goal |
N/A | |||
7/14/17 | MCC-X-045-A | MIA – Concourse J-Gate 3-EDS Room |
SBE/Cons- Trade Set-Aside: Packages A,B,C,E,F, G |
N/A | N/A | N/A |
53.41% SBE/Cons goal Trade Set Aside No Measure 10.00% CWP Goal |
N/A | ||
7/13/17 | RPQ No. 20170203 | ADA Sidewalk Improvements |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | |||
7/13/17 | RPQ No. 20170204 | ADA Sidewalk Improvements |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | |||
7/11/17 | 210701-05-001 | North Glade Park – New LEED Community Recreation Center |
SBE/Cons – 6.00% Goal |
N/A | N/A | N/A |
1.08% SBE/GS Goal 8.34% SBE/Cons Goal |
N/A | ||
7/10/17 | RPQ No. 10469 | Emergency A/C Replacement – Ward Towers 2 – Gym and Kitchen |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/6/17 | 213001-15-004 | Ameila Earhart Park – Pedestrian Bridge Replacement |
SBE/Cons – 1.2% Goal for Paving or No Measure (Insufficient Availability) |
N/A | N/A |
No Measure |
N/A | |||
7/5/17 | 220901-05-001 | Greynolds Park Renovations and Improvements |
SBE/Cons – 23.98% Goal |
N/A | N/A | N/A |
5.90% SBE/GS Goal 23.98% SBE/CONS Goal 10.00% CWP Goal |
N/A | ||
7/5/17 | MCC V043A-2 | MIA – Central Terminal Ticket Counters G-H Area – Fish Finders |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/27/17 | RPQ No. 2010-038.02 | North Cruise Berths 1 – 6 Seafloor Stabilization Program |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/27/17 | RPQ No. 2010-038.03 | North Cruise Berths 1 – 6 Cathodic Protection |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
6/26/17 | RPQ No. 20170195 | ADA Sidewalk Improvements |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
6/26/17 | RPQ No. 20170179 | Sidewalk Improvements |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
6/21/17 | RFQ MDAD-17-01 | Airport Signage Design, Fabrication and Installation |
SBE/Cons- No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure -SBE/CONS No Measure - SBE/GS 10% CWP Goal |
N/A | ||
6/20/17 | RPQ No. 2010-038.01 | North Cruise Berths 1 – 6 Scouring Repairs |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
6/20/17 | DB17-WASD-01 | Design-Build Services for the Construction of the Central District Wastewater Treatment Plant Oxygen Production Facility Consent Decree Project 2.27 |
SBE/A&E – 13.13% Goal |
N/A | N/A | N/A |
SBE/GS -1.10% SBE/CONS 7.42% SBE/AE 17.13% |
N/A | ||
6/13/17 | RPQ No. 20170193 | Guardrail Maintenance |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/12/17 | E14-RER-03-006-CBI | Phase 2 Environmental Site Assessment at the Future Park and Ride Site, located in the vicinity of US1 & SW 112 Ave, on behalf of the Miami-Dade Department of Transportation and Public Works |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/9/17 | 422801-17-002 | Crandon Marina – Floating Docks |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/9/17 | 510601-17-001 | Matheson Hammock Marina – Floating Docks – PH II |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/7/17 | S171546 | Fleet Management Shop 1 Ground Floor Restrooms Lead Based Paint Abatement |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/7/17 | RPQ 7384 | Vacant Unit Preparation – Modernization |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/5/17 | DB17-SEA-01 | Design-Build Services for New Cruise Terminal B Program |
SBE/A&E Goal – 18.00% |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/1/17 | DB17-ISD-02 GOB ESP | Design-Build Services for Miami Dade Public Library System (MDPLS) Hialeah Gardens Branch Library |
SBE/Cons – 25.97% Goal SBE/A&E -17.00% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
5/31/17 | E14-RER-03-002-CEI | Monitoring Well Installation and Groundwater Sampling at the Bldg 857 site, located within the Miami International Airport, on behalf of the Miami-Dade Aviation Department (MDAD) |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/31/17 | E14-RER-03-004-CEI | Monitoring Well Installation and Groundwater Sampling at the Bldg 180 site, located within the Opa-Locka Executive Airport, on behalf of the Miami-Dade Aviation Department (MDAD) |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/31/017 | RFQ 17-14987-KG-LTCC | Kitchen RTU Replacement |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
100% Level 1 Set Aside |
N/A | ||
5/30/17 | 503002-14-001 | Colonial Drive Park Corrective Action Plan |
SBE/Cons – 2.86% Goal |
N/A | N/A | N/A |
2.86% SBE/Cons 5.99% SBE/GS Goal |
N/A | ||
5/30/17 | E14-RER-03-007R1-CBI | Environmental Site Assessment at the Future Palmetto Bay Fire Rescue Station #74, located in the vicinity of 18198 Old Cutler RD, on behalf of Miami-Dade Fire Rescue |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/26/17 | RPQ# T2336 | CD Project 5.7 Upgrade of Pump Station No. 0417 |
SBE/Cons – 12.88/% Goal SBE/G&S – 5.45% Goal |
N/A | N/A | N/A |
5.97% SBE/GS Goal 12.37% SBE/Cons |
N/A | ||
5/26/17 | E14-RER-03-004-AMEC | Phase 2 Environmental Site Assessment at the Underline Project, Located in the vicinity of South of Miami River to SW 98 St along US1, on behalf of the Miami-Dade Department of Transportation and Public Works (DTPW) |
SBE/Cons- No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/25/17 | MCC-U-010-F | MIA-Satellite E – AHU-1 Replacement |
SBE/Cons- Trade Set Aside for Package “A” Miscellaneous General Work; Package “B” Painting; Package “C” HVAC; Package “D” Fire Sprinklers; and Package “E” Electrical |
N/A | N/A | N/A |
Trade Set Aside 90.91% SBE/Cons 10.00% CWP Goal |
N/A | ||
5/25/17 | RPQ No. 3158NSP1 | Dwelling Structure Minor Repairs Masnata 245 NW 22 Street |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/24/17 | RFQ 17-14982-KG | LTCC Showers Renovation |
SBE/Cons – 100% Trade Set-Aside |
N/A | N/A |
Level 1 Set Aside 100% |
N/A | |||
5/24/17 | E14-RER-03-001-AMEC | Oversight and Sampling of Soil Staging Areas at Various MDAD Sites, located within the Miami International Airport, on behalf of the Miami-Dade Aviation Department (MDAD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/24/17 | ITB-17-14957-SW | Elevator Program |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
5/18/17 | 223203-15-001 | Biscayne Shores and Gardens – Shelter and Playground |
SBE/Cons – 6.49% Goal |
N/A | N/A | N/A |
4.00% SBE/GS Goal 6.49% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
5/18/17 | 502501-14-001 | Deering Estate – Shutters, Panels and AC Units Replacement |
SBE/Cons – 34.1% Goal |
N/A | N/A | N/A |
34.04% SBE/Cons |
N/A | ||
5/11/2017 | RPQ No. 20170165 | Roadway Resurfacing Contract (Push Button-South) |
Trade Set-Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
5/10/2017 | 493300-17-001 | Olympic Park Fitness Zone – Walkway and Pavers |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/9/2017 | RPQ No. 20170138 | Safe Route to Schools Locations, Phase 14 |
DBE Subcontractor Goal – 10.65% |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
5/9/2017 | RPQ No. 20170139 | Safe Route to Schools Locations, Phase 15 |
DBE Subcontractor Goal – 10.65% |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
5/9/2017 | MCC-T-072-H | MIA- Central Terminal "E" FIS Renovations, 1st Level |
SBE/Cons- Trade Set Aside |
N/A | N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
5/4/2017 | S-904 | Furnish and Install 42-Inch PCCP/HDPE Force Main Along North Miami Ave from NE 36 Street to NE 62 NE Street |
SBE/Cons – 2.83% Goal |
N/A | N/A | N/A |
.90% SBE/GS Goal 2.70% SBE/Cons Goal 15.40% CWP Goal |
N/A | ||
4/28/17 | RPQ No. 5437 | Mold Remediation at Annie Coleman - 2360 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/21/17 | RPQ No. 4268 | Emergency Fence Repair Caribbean Blvd Site |
Level 1 Set-Aside |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/19/17 | AAA-04-19-2017 | Suite Level Floor Replacement |
100% Set Aside |
N/A | N/A |
100% Set Aside |
N/A | |||
4/18/17 | P256A | MIA Taxiway R,S and T Rehabilitation, Extension and Relocation |
SBE/DBE – 11.0% Goal |
N/A | N/A | N/A |
11.00% DBE Goal 10.00% CWP Goal |
N/A | ||
4/18/17 | S-905R | CD 5.5 Upgrade of Pump Station 0415 |
SBE/Cons – 17.91% Goal |
N/A | N/A | N/A |
2.40% SBE/GS Goal 17.05% SBE/Cons Goal 10.40% CWP Goal |
N/A | ||
4/17/17 | RPQ No. 4703 | Emergency Mold Remediation – Gwen Cherry 08 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/12/17 | RPQ 5131 | Emergency Spalling repairs |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/12/17 | RPQ# 5300 | Emergency Mold Remediation – Home Ownership 836 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/5/17 | RPQ 5032 | Florida City Gardens Re Roofing |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/3/17 | RFQ 17-14776-SW | Air Duct Cleaning MICU |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 3 Set Aside 100% SBE/Cons |
N/A | ||
3/30/17 | 2010-037.03 | North Bulkhead Repairs Phase III |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
3/30/17 | RFQ 17-14853-KG | JNMC Curbs Repairs |
100% Set-Aside |
N/A | N/A | N/A |
Level 1 Set Aside |
N/A | ||
3/28/17 | 220301-16-001 | Ojus Park - Recreation Center Renovation |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/14/17 | S-910 | Rehabilitation of U.S.1 Crossing Gravity Sewer Lines at SW 98 St and SW 88 St Using Trenchless Technology |
No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/9/17 | X027A | Building Management for MIA by Honeywell International Inc. Legacy Agreement |
SBE/Cons – 15.7% Goal SBE/G&S – 1% Goal |
N/A | N/A | N/A |
1.00% SBE/GS Goal 15.75% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
3/9/17 | 2016-001.03 | Pre-Development Agreement for Construction of Port Facilities – Contract Services for Cruise Terminal A – New Access Road and Utilities Segment 2 |
SBE/Cons – 14.71% Goal |
N/A | N/A |
15.00% SBE/Cons Goal 10.00% CWP Goal |
N/A | |||
3/7/17 | RPQ 3886 | Emergency Mold Remediation – Twin Lakes |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/3/17 | RPQ No. 4182 | Mold Remediation at 16308 NW 37th Place (Venetian Gardens) |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/3/17 | RPQ No. 4010 | Work Order NO. 7 – North Region |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/3/17 | RPQ No. 4012 | Work Order NO. 7 – Central Region |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/3/17 | No. 4013 | Work Order NO. 7 – South Region |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/3/17 | Z00051-TWR | Joseph Caleb Center (JCC) Atrium Refurbishment and Facility Renovations |
SBE/Cons – 19.68% Goal |
N/A | N/A | N/A |
2% SBE/GS Goal 19.68% SBE/Cons Goal 12.60% CWP Goal |
N/A | ||
3/3/17 | RPQ 3818 | Emergency Mold Remediation – Gwen Cherry 13 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/22/17 | C091271 (RTQ-00299) | Douglas Road Office Building Back Up Chiller Replacement C091271 (RTQ-00299) |
No Measure – (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/22/17 | RPQ No. MDFRD-523-62-B | MDFR Palmetto Bay Fire Station 62 |
SBE/Cons – 32.6% Goal |
N/A | N/A | N/A |
2.51% SBE/GS Goal 31.06% SBE/Cons Goal |
N/A | ||
2/16/17 | RFQ 17-14779-KG | Miscellaneous Repairs |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
100% Level 1 Set Aside |
N/A | ||
2/15/17 | RPQ No. 20170025 | Inspection Improvements Contract (Push Button-North) |
SBE/Cons – Trade Set-Aside : Traffic Stripes and Markings: Painted and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A | N/A | N/A |
0.63% - SBE/GS Goal Trade Set Aside 2 - SBE/Cons Trade Set Aside 1 - SBE/Cons 10% CWP Goal |
N/A | ||
2/9/17 | RPQ No. 20160301 | Capital Water Control Infrastructure Improvements Multiple Sets |
SBE/Cons – 13.55% Goal |
N/A | N/A | N/A |
9.92% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
2/8/17 | DB17-PHCD-01 | Design-Build Services for Senator Villas |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/2/17 | RPQ #3217 | Emergency Plumbing Repair/ Homestead Gardens – 560 unit 101 |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/31/17 | E14-RER-01-009-NOVA | Former Liberty City Health Center – Source Removal and Reporting, on behalf of the Internal Services Department (ISD) |
SBE/Cons – 0% Goal (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/31/17 | RFQ 17-14723-KG | JSCH Fire Smoke Door Repair-Replace |
SBE/Cons – 100% Trade Set-Aside |
N/A | N/A | N/A |
100% Level 1 Set Aside |
N/A | ||
1/31/17 | RPQ No. 20160233 | FDOT Traffic Signals Preventive Maintenance |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/24/17 | RPQ 3214 | Newberg and Peters Plaza Mold Remediation/Asbestos Removal |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/24/17 | MCC-T072-H | MIA- E FIS Renovations, 1st Level |
SBE/Cons – 100% Trade Set-Aside |
N/A | N/A | N/A |
No Measure Trade Set Aside 78.25% SBE/Cons Goal 10.00% Workforce Goal |
N/A | ||
1/23/17 | E14-RER-01-007-NOVA | Historic Hampton House, Installation and Sampling of Two Monitoring Wells and Four Sampling Events, on behalf of the Department of Public Housing and Community Development (PHCD) |
SBE/Cons – 0% Goal (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/19/17 | S-882 | CD 1.02 Oxygen Production Upgrades |
SBE/Cons – 21.13% Goal |
N/A | N/A |
4.80% SBE/GS Goal 19.21% SBE/Cons Goal 10.00% CWP Goal |
N/A | |||
1/19/17 | 320801-13-001-B | Pelican Harbor Marina Pump Station Improvements |
SBE/Cons – 6.57% Goal |
N/A | N/A | N/A |
9.64% SBE/Cons Goal |
N/A | ||
1/18/17 | MCC-V-040-A-1 | MIA- Satellite E – Pavement Rehabilitation – Package #1 |
Trade Set Aside 10% CWP Goal |
N/A | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||
1/18/17 | MCC-V-043-A | MIA- Ticket Counters F, G Phase I (United Airlines) |
Package “A” Miscellaneous General Work Package “F” Acoustical Ceilings |
N/A | N/A | N/A |
Trade Set Aside 84.00% SBE/Cons Goal No Measure 10% CWP Goal |
N/A | ||
1/17/17 | S-905 | CD 5.5 Upgrade of Pump Station 0415 |
SBE/Cons – 17.04% Goal |
N/A | N/A | N/A |
2.10% SBE/GS Goal 16.96% SBE/CONS Goal 10.00% CWP Goal |
N/A | ||
1/13/17 | RPQ No. 20170005 | Roadway Surfacing Contract (Push-Button-North) |
SBE/Cons – Trade Set-Aside for Traffic Stripes and Markings: Painted and/or Thermoplastic and Concrete; sidewalk and/or curb and gutter |
N/A | N/A |
0.99% SBE/GS Goal Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | |||
1/13/17 | RFQ 17-14569-SW | Air Duct Cleaning SICU |
SBE/Cons – 100% Trade Set-Aside |
N/A | N/A | N/A |
100% Level 3 Set Aside |
N/A | ||
1/11/17 | RPQ P0197 | South District Waste Water Treatment Plant Fog Removal Facility Consent Decree |
2.10% SBE/GS Goal 17.11% SBE/CONS Goal 10.00% CWP Goal |
N/A | N/A |
2.10% SBE/GS Goal 17.11% SBE/CONS Goal 10.00% CWP Goal |
N/A | |||
1/11/17 | RPQ No. 20160349 | Safe Route to Schools Locations, Phase 13 FM# 428210-1 |
SBE/DBE Goal – 9.91% |
N/A | N/A | N/A |
9.91% DBE Goal |
N/A | ||
1/9/17 | RFQ 17-14566-HO | Door Repair or Replacement |
SBE/Cons – 100% Trade Set-Aside |
N/A | N/A | N/A |
Level 1 Set Aside 100% |
N/A | ||
1/4/17 | RPQ# 154151 | Partners Park – Walkway and Ballfield Improvements |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/3/17 | 200301-15-001 | Playground Replacement and Improvements |
SBE/Cons- 7.89% Goal |
N/A | N/A |
4.00% SBE/GS Goal 6.54% SBE/Cons Goal |
N/A |
2016 - 2012
Date Received |
Project Number |
Project Title |
Project Package |
Dept. RCMD |
SBD Project Breakout |
Additional Information |
Verification of Availability |
SBD Analysis & RCMD |
SBD Final RCMD |
Comments |
12/22/16 | RFP 16-14523-JE | Jackson Memorial Hospital – JMH DTC 3rd Floor Hybrid OR |
SBE/Cons- 19.06% Goal |
N/A | N/A | N/A |
19.06% SBE/CONS Goal 10.00% CWP Goal |
N/A | ||
12/19/16 | RPQ No. 20160346 | Guardrail Maintenance |
No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/16/16 | RPQ No. 20160077 | Interlocal Agreement (IA) between Miami-Dade County, the city of Hialeah, the city of Hialeah Gardens, and Miami-Dade Expressway Authority for Roadway Improvement Project along NW 107 Avenue from NW 138 Street to NW 170 Street |
SBE/A&E – Land Surveying – 7.02% |
N/A | N/A |
8.02% SBE/Cons |
N/A | |||
12/7/16 | RPQ No. 20160345 | JMT 14th Floor Offices Renovations |
Trade Set-Aside |
N/A | N/A | N/A |
1.18% SBE/GS goal Trade Set Aside 2 SBE/Cons Trade Set Aside 1 SBE/Cons 10% CWP Goal |
N/A | ||
12/6/16 | RFQ 16-14518-KG | JMT 14th Floor Offices Renovations |
Level 3 Set-Aside |
N/A | N/A | N/A |
Level 1 Set Aside |
N/A | ||
12/5/16 | 14S003 | South Dade Landfill Cell 5 Construction |
SBE/Cons Goal – 3.10% |
N/A | N/A | N/A |
4.00% SBE/GS Goal 13.13% SBE/CONS Goal 10.00% CWP Goal |
N/A | ||
11/29/16 | RPQ 1637 | Emergency Roof Repairs – Perrine Gardens |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/7/16 | RFQ 16-144651-KG | Coil Replacement at Air Handling Unit (AHU) #262 |
Level 3 Set-Aside |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/1/16 | RPQ No. 1154 | Improvements to the Sites of Smathers Plaza |
No Measure (Funding Source) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/25/16 | RPQ No. 20160301 | Drainage Improvements Project Flood Control Structure Multiple Sites |
SBE/Cons – 13.55% |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/24/16 | 590802-15-005 | West End District Park – PH1A Initial Park Edge |
SBE/Cons – 15.38% |
N/A | N/A |
14.65% SBE/Cons Goal |
N/A | |||
10/21/16 | S-870 | CDWWTP Industrial Injection Well Surface Facilities |
4.21% – SBE/Cons Goal |
N/A | N/A |
2.89% SBE/GS 4.21% SBE/Cons |
N/A | |||
9/29/16 | 20160278 | Roadway Improvements to NE 16 Avenue from NE 123 Street to NE 135 Street |
SBE/Cons – 12.49% |
N/A | N/A |
6.30% SBE/GS Goal 19.14% SBE/CONS Goal 10.00% CWP Goal |
N/A | |||
9/23/16 | RPQ 20160266 | Roadway Resurfacing Contract |
Trade Set Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic and Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A | N/A |
Trade Set Aside 2 Trade Set Aside 1 10.00% CWP Goal |
N/A | |||
9/22/16 | S-891 | CD 2.19(2) Co-Gen Facility and 2.01(6) Electrical Improvements |
SBE/CONS 4.00% SBE GOODS & SERVICES 1.12% |
N/A | N/A |
1.12% SBE/GS Goal 5.06% SBE/Cons Goal |
N/A | |||
9/22/16 | W-934A | Miami Springs Wellfield Rehabilitation – Step 1 | Work Force Goals: No Measure – (Insufficient Availability) | N/A | No Measure | No Measure | N/A | |||
9/20/16 | RFQ 16-14374-KG | Rehab Basement Acoustical Ceiling | Level 3 Set-Aside | N/A | N/A | N/A | 100% Level 1 Set Aside | 100% Level 1 Set Aside | N/A | |
9/19/16 | RPQ P0193 | One (1) Year Countywide Contract for the Rehabilitation of Sanitary Sewer by the Cured-In-Placed Pipe Lining Method for PMCM Project )FY2017) | No Measure (Insufficient Availability) | N/A | N/A | No Measure | No Measure | N/A | ||
9/19/16 | RPQ 148150-B | Military Trail – Dog Park and Walkway Lighting - Rebid | Under Review | N/A | N/A | N/A | Under Review | Under Review | N/A | |
9/15/16 | RPQ 147311 | Matheson Hammocks Marina – Wet Slips – Fender Replacement | No Measure (Insufficient Availability) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
9/2/16 | RPQ 176357 | Rooftop A/C Package Units Replacement | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
9/1/16 | RPQ No. 20160255 | Culvert Replacement at NW 106 Street and NW South River Drive | SBE/Cons – 2.77% | N/A | N/A | N/A | 2.77% SBE/Cons Goal | 2.77% SBE/Cons Goal | N/A | |
8/30/16 | 320008-328286 | New Construction: Westchester Cultural Arts Center (WCAC) | SBE/Cons Goal – 20% | N/A | N/A | N/A |
1.00% SBE/GS Goal 30.00% SBE/Cons Goal |
N/A | ||
8/30/16 | RFQ 16-14091-KG | Replacement of Air Handling Unit (AHU) #227 | SBE/Cons - 100% Set-Aside | N/A | N/A | N/A |
Level 3 Set Aside 100% SBE/Con Goal |
N/A | ||
8/26/16 | RPQ No. 20160232 | Roadway Improvements to SW 142 Avenue from SW 26 Street to SW 8 Street | SBE/Cons Goal – 13.15% SBE/G&S Goal – 4.79% |
N/A | N/A | N/A |
12.06% SBE/Cons Goal 5.88% SBE/G&S Goal |
N/A | ||
8/19/16 | S-903 | CD 5.12 Upgrade of Sewage Pump Station No. 0187 | 4.30% – SBE/Cons Goal 1.00% – SBE/G&S Goal |
N/A | N/A | N/A |
1.00% SBE/GS Goal 4.30% SBE/Cons Goal |
N/A | ||
8/17/16 | AAA-08-17-2016-A | Weight Room Specialty Flooring | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
8/15/16 | RPQ No. 20160221 | Safe Route to Schools Locations, Phase 12, FM# 428211-1 | DBE Goal – 9.91% | N/A | N/A | N/A | 9.91% DBE Goal | 9.91% DBE Goal | N/A | |
8/15/16 | RPQ SA080516ZGU | Gutter and Downspout Replace at Col. Zubkoff HS Center | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/11/16 | 149734 | Ojus Park – Shade Structure | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/10/16 | RPQ No. 152822 | Gratigny Park- Playground Replacement | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/10/16 | RFQ 16-14275-KG | Replacement of Variable Frequency Drives (VFD) | SBE/Cons Goal – 100% Trade Set-Aside | N/A | N/A | N/A | Level 1 Setaside w/exception | Level 1 Setaside w/exception | N/A | |
8/8/16 | AMMiamiGardensP | AMMIAMIGARDENSP | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/8/16 | DB16-DTPW-01 (20160163) | Design-Build Services for the Bridge Replacement at Old Cutler Road over C-100 Canal (874293), Old Cutler Road over Black Creek Canal (874432), and SW 152 Street over C-100A Canal (874423) | SBE/Cons Goal – Trade Set-Aside for Traffic Stripes and Markings SBE/A&E Goal – 7.80% (Surveying and Mapping) SBE/ G&S Goal – 5.52% (Maintenance of Traffic & Grass/Sod) |
N/A | N/A | N/A |
Trade Set Aside SBE/Con Goal 6.77% SBE/GS Goal 10.00% CWP Goal |
N/A | ||
8/8/16 | VZ-VG-FVSTAB-16 | Vizcaya Museum and Gardens farm village building stabilization | 11% – SBE/Cons Goal | N/A | N/A | N/A | 8.91% SBE/CONS | 8.91% SBE/CONS | N/A | |
8/4/16 | NK-010(RTQ-00299) | HVAC and Controls - RTQ | Level 2 Set-Aside | N/A | N/A | N/A | Level 2 Set Aside | Level 2 Set Aside | N/A | |
8/4/16 | E09-DERM-01-026A1-CEI | Building 180 at Opa-Locka Airport | No Measure (Insufficient Availability) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/3/16 | 422801-13-013 | Boat Ramp Repairs | No Measure (Insufficient Availability) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/2/16 | 510601-13-003 | Matheson Hammocks Marina – Boat Ramp Repairs | No Measure (Insufficient Availability) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/1/16 | RPQ# 10079676 | Airfield and Roadway Work order based Striping Service Contract at all Operated MDAD Facilities | No Measure (Insufficient Availability) | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
7/29/16 | 2008-122.13A | Cruise Terminal J CBP Improvements Phase I | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/26/16 | RQID1600066 | Swimming Pool Heater Maintenance | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/26/16 | AAA-07-26-2016 | Re-Laminate Loge Cabinet Doors | N/A | N/A | N/A | 100% Level 2 Set Aside | 100% Level 2 Set Aside | N/A | ||
7/26/16 | RPQ 176108 | Improvements to the lighting on multiple parking lot locations and structural repairs to exterior stairs to meet the 40 year recertification | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/26/16 | 2015-020.05-R | Cruise Terminal E Building Improvements | 12.00%- SBE/Cons Goal 4.86%- SBE/G&S Goal |
N/A | N/A | N/A |
4.86% SBE/GS Goal 12.00% SBE/CONS Goal 10.00% CWP Goal |
N/A | ||
7/22/16 | RPQ No. S152188 | Dade County Courthouse – Courtroom 6-2 Witness Stand Platform Lift Replacement | No Measure (Insufficient Availability | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/19/16 | AAA-07-20-2016 | Lighting Control System | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/13/16 | RPQ P0191 | One-Year County-Wide Contract for Rehabilitation of Manholes Inflow and Infiltration | One-Year County-Wide Contract for Rehabilitation of Manholes Inflow and Infiltration | N/A | N/A | 11.11% SBE/CONS Goal | 11.11% SBE/CONS Goal | N/A | ||
7/12/16 | RFQ 16-14237-HO | Jackson Memorial Hospital (JMH) | SBE/Cons Level 1 Set-Aside | N/A | N/A | N/A | Level 1 Set Aside 100% SBE/Cons Goal | N/A | ||
7/12/16 | ITB-16-14204-JE-GC -01 | Job Order Contract (JOC) GC-01 | GC-01: Open Market, 30% SBE/Cons Goal, 15% if SBE/Cons is Prime |
N/A | N/A | N/A |
30.00% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
7/12/16 | ITB-16-14204-JE-GC -02 | Job Order Contract (JOC) GC-02 | GC-02: Level 2 SBE/Cons Set-Aside | N/A | N/A |
100% Level 2 Set Aside 10.00% CWP Goal |
N/A | |||
7/12/16 | ITB-16-14204-JE-GC -03 | Job Order Contract (JOC) GC-03 | GC-03: Level 1 SBE/Cons Set-Aside | N/A | N/A |
100% Level 2 Set Aside 10.00% CWP Goal |
N/A | |||
7/12/16 | ITB-16-14204-JE-EC -04 | Job Order Contract (JOC) EC-04 | EC-04: Open Market, SBE/Cons subcontracting participation encouraged | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
7/12/16 | ITB-16-14204-JE-EC -05 | Job Order Contract (JOC) EC-05 | EC-05: Level 2 SBE/Cons Set-Aside | N/A | N/A |
100% Level 2 Set Aside 10.00% CWP Goal |
N/A | |||
7/12/16 | ITB-16-14204-JE-EC -06 | Job Order Contract (JOC) EC-06 | EC-06: Level 1 SBE/ Cons Set-Aside | N/A | N/A |
100% Level 1 Set Aside 10.00% CWP Goal |
N/A | |||
7/12/16 | ITB-16-14204-JE-MC -07 | Job Order Contract (JOC) MC-07 |
MC-07: Open Market, SBE/Cons participation encouraged |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
7/12/16 | ITB-16-14204-JE-MC -08 | Job Order Contract (JOC) MC-08 | MC-08: Level 2 SBE/Cons Set-Aside | N/A | N/A |
100% Level 2 Set Aside 10.00% CWP Goal |
N/A | |||
7/12/16 | ITB-16-14204-JE-MC -09 | Job Order Contract (JOC) MC-09 | MC-09: Level 1 SBE/Cons Set-Aside | N/A | N/A |
100% Level 1 Set Aside 10.00% CWP Goal |
N/A | |||
7/12/16 | ITB-16-14204-JE-RC -10 | Job Order Contract (JOC) RC-10 |
RC-10: Open Market, SBE/Cons subcontracting participation encouraged |
N/A | N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
7/12/16 | ITB-16-14204-JE-RC -11 | Job Order Contract (JOC) RC-11 | RC-11: Level 1 SBE/Cons Set-Aside | N/A | N/A |
100% Level 2 Set Aside 10.00% CWP Goal |
N/A | |||
7/12/16 | ITB-16-14204-JE-PC -12 | Job Order Contract (JOC) PC-12 |
PC-12: Level 1 SBE/Cons Set-Aside |
N/A | N/A |
100% Level 1 Set Aside 10.00% CWP Goal |
N/A | |||
7/12/16 | MCC-V-043-A | MIA- Ticket Counters F, G Phase I (United Airlines) | Trade Set- Aside: Package “A” Miscellaneous General Work Package “F” Acoustical Ceilings Package “B” Miscellaneous Metals Package “G” HVAC Package “C” Doors Package “H” Fire Protection Package “D” Drywall Package “I” Plumbing Package “E” Painting Package “J” Electrical |
N/A | N/A | N/A |
84.00% Trade Set Aside 10% CWP Goal |
N/A | ||
7/12/16 | MCC-U-037-A | MIA- United Airlines Colocation Project Package “A” ATO Renovations |
Trade Set- Aside: Package “A” Miscellaneous General Work Package “G” Painting |
N/A | N/A | N/A |
84.00% Trade Set Aside 10% CWP Goal |
N/A | ||
7/11/16 | RPQ No. 20160219 | WASD Street Rehabilitation Contract | Trade Set Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic | N/A | N/A | N/A | Trade Set Aside SBE/Cons | Trade Set Aside SBE Cons | N/A | |
7/8/16 | RPQ No. 20160225 | People’s Transportation Plan (PTP) Roadway Improvements to NW 37 Avenue from NW 36 Street to NW | 15.5% - SBE/Cons Goal 1.5%- SBE/G&S Goal |
N/A | N/A | N/A |
1.54% SBE/GS Goal 15.45% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
7/8/16 | RPQ No. 20160218 | WASD Street Rehabilitation Contract | Trade Set-Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic | N/A | N/A | N/A |
Trade Set Aside 10.00% CWP Goal |
N/A | ||
7/8/16 | 2016-001.01 | Cruise Terminal A- Relocation of Cargo Road, Canopies, and Parking |
Goal Tier 1 6.93% SBE/Cons Goal Goal Tier 2 13.93% SBE/Cons Goal 10% CWP Goal |
N/A | N/A | N/A |
Goal Tier 1 6.93% SBE/Cons Goal Goal Tier 2 13.93% SBE/Cons Goal 10% CWP Goal |
|
N/A | |
7/8/16 | 2016-001.02 | Cruise Terminal A- Relocation of Onsite Utilities & Drainage | SBE/Cons Goal- 54.86% CWP Goal- 10.00% |
N/A | N/A | N/A |
54.86% SBE/Cons Goal Goal Tier 2 10% CWP Goal |
N/A | ||
6/29/16 | AAA-06-29-2016 | East Plaza Flooring Project | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/28/16 | RQID1600057 | Swimming Pool Heaters | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/27/16 | DB16-DTPW-06 | Design-Build Services for Bridge Replacement at Snapper Creek West of SW 107 Avenue (874436) | Trade Set-Aside | N/A | N/A | N/A | Trade Set-Aside | Trade Set Aside | N/A | |
6/27/16 | DB16-DTPW-07 | Design-Build Services for the Bridge Replacement at SW 16 Street West of SW 99 Avenue (874235) | Trade Set-Aside - SBE/Cons 7.05%- SBE/A&E Goal |
N/A | N/A | N/A | Trade Set Aside | Trade Set Aside | N/A | |
6/27/16 | DB16-DTPW-08 | Design-Build Services for the Bridge Replacement at NE 10 Avenue North of NE 79 Street (874178) | Trade Set-Aside - SBE/Cons 7.05%- SBE/A&E Goal |
N/A | N/A | N/A | Trade Set Aside | Trade Set Aside | N/A | |
6/27/16 | RQWS1600009 | Enterprise Construction Project Management Software | No Measure (Accessing MNSCU Contract PO #47457) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
6/24/16 | RPQ No. 20160203 | Drainage Cleaning and Video Inspection Multiple Sets | No Measure | N/A | N/A | Under Review | Under Review | N/A | ||
6/21/16 | DB16-DTPW-04 | Design-Build Services for the Bridge Replacement at N. Miami Avenue over Little River Canal (874127) | Trade Set-Aside | N/A | N/A | N/A |
Trade Set Aside 10.00% CWP Goal |
N/A | ||
6/17/16 | RPQ No. 327079 | Traffic Management Center Phase I Reconfiguration | No Measure (Funding Source) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
6/17/16 | RPQ No. NMCENTROMWES | Centro Mater West Roof Repair | No Measure – (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/17/16 | RPQ No. NMPARADISE | Paradise Christian School | No Measure – (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/17/16 | RPQ No. NMBETHCHANN | Bethany Learning Center U Channel Install | No Measure – (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/17/16 | RPQ No. NMEASTHAIT | Easter Seals Haitian Youth HS/EHS Delegate Agency Site 2 | No Measure – (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/15/16 | RPQ NO. 174522 | General Building /Door Repair for Rainbow Village | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
06/13/16 | RPQ NO. 174936 | Palm Tower | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
06/09/16 | S-889 | CD 2.15(1) Plant 2 Cluster 1 Digester Upgrades | 9.54% SBE Construction and 1.66% SBE Good & Service Goals | N/A | N/A | N/A |
1.80% SBE/GS Goal 10.10% SBE/Cons Goal |
N/A | ||
06/08/16 | RPQ No. 174856 | Installation of Mailboxes at Arthur Mays & Goulds Elderly | No Measure – (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/8/16 | AAA-06-08-2016 | Outside Air Compliance - AHUS 16, 21, 22, 23, 24 |
Level 2 Set Aside 100% SBE/Cons Goal |
N/A | N/A |
Level 2 Set Aside 100% SBE-Construction Goal |
N/A | |||
06/08/16 | S-900 | One Year Countywide Contract For Rehabilitation Of Sanitary Sewers By The Sectional Lining Method, With County Option To Renew For An Additional Three Years On A Yearly Basis | 100% Set Aside - SBE Construction | N/A | N/A | N/A | 100% Set Aside - SBE Construction | 100% Set Aside- SBE Construction | N/A | |
06/02/16 | RPQ No. 319594 | Bus Garages Roof | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/26/16 | RQID1600046 | Chillers and HVAC Equipment Maintenance For WASD | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/24/16 | RFQ 16-13940-CW | Exterior Painting Services for JMH Highland Park Garage Building, and Additional JMH Main Campus Buildings |
Level 1 Set Aside 100% SBE/Cons |
N/A | N/A | N/A |
Level 1 Set Aside 100.00% SBE/Cons goal |
N/A | ||
5/20/16 | RPQ No. 20160143 | Intersection Improvements Contract | Trade Set-A-Side: Traffic Stripes and Markings: Painted and/or Thermoplastic and Concrete: Sidewalk and/or Curb and Gutter. | N/A | N/A | N/A |
Trade Set Aside 2 Trade Set Aside 1 |
N/A | ||
5/18/16 | RPQ No. SA051616NCFEN | New Fence for Playground at North County Head Start | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/17/16 | S-901 | CD 4.10(1) REHABILITATION OF 48-INCH PCCP FORCE MAIN FROM NW 37 AVE. TO NW 32 AVE. ALONG NORTH RIGHT OF WAY OF BISCAYNE (C-8) CANAL (GREEN SPACE) | No Measure - (Rehabilitation Project) | N/A | N/A | No Measure | No Measure | N/A | ||
5/17/16 | S-902 | CD 4.10(2) INSTALLATION OF APPROXIMATELY 10,000 LF OF 54-INCH DI FORCE MAIN ALONG THE SOUTH RIGHT OF WAY OF BISCAYNE CANAL (C-8) FROM NW 57th AVE TO NW 37th AVE | 1.96% SBE Construction Goal and 1.35% SBE Goods and Services Goal | N/A | N/A |
1.51% - SBE/GS Goal 1.92% - SBE/Cons Goal |
N/A | |||
5/13/16 | RPQ No. 171289 | Foam Roof Repair at Applicant Leasing Center (ALC) | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/13/16 | DB16-WASD-02 | Design-Build Services for the Construction of a New Drinking Water Laboratory Building at the Alexander Orr, Jr. Water Treatment Plant | 15.02% SBE Construction, 14.98% SBE A&E, 2.58% SBE Good & Service Goals |
N/A | N/A |
2.58% SBE/GS Goal 15.02% SBE/Cons Goal |
N/A | |||
5/13/16 | RQID1600045 | Power Generating Systems, Maintenance, Repair, and Purchase | No Measure (B,C,D,E &F) | N/A | N/A | N/A | No Measure (B,C,D,E &F) | No Measure (B,C,D,E &F) | N/A | |
5/11/16 | RPQ No. NMFCAAALLA | FCAA Allapattah Facilities Plan Site 1 | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/11/16 | RPQ NO. 250808 | Traction Power Rectifier Transformer | 0% DBE Goal – No Measure – Funding Source | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/10/16 | TAC-N #T-172B (Package B) | MIA British Airways D21 Galleries Lounge | Under Review | N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/10/16 | SPO6129 (RTQ-00299(B)) | Shenandoah Condenser Controls | Under Review | N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/5/16 | RFQ-16-14026-SW | Eddy Current Test of Five Chillers | 100% Set Aside | N/A | N/A | N/A | 100% Set Aside | 100% Set Aside | N/A | |
5/4/16 | S071A | MIA Concourse H Roof Replacement and Misc. Repairs | 18.0% Disadvantage Business Enterprise (DBE Project Goal) and 10% Community Workforce Program (CWP) | N/A | N/A | N/A | 18.00% DBE Goal | 18.00% DBE Goal | N/A | |
5/2/16 | S-877 | North District Wastewater Treatment Plant New Pumps for Existing Deep Injection Well Pumping Station | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/28/16 | 422801-05-014 | Crandon Park Beachside Restroom Replacement | 20.70% - SBE/Cons Goal | N/A | N/A | N/A | 20.70% - SBE/Cons Goal | 20.70% - SBE/Cons Goal | N/A | |
4/25/16 | RPQ No. NMPBOPLAYGROUND | Early Head Start PBO Playgrounds | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/22/16 | 2015-020.05 | Cruise Terminal E Building Improvements | 9.92% SBE Cons / 10% CWP Goals | N/A | N/A | N/A |
12% SBE/Cons Goal 10% CWP Goal |
N/A | ||
4/21/16 | S-880 | CD 2.03 AND 2.04 PLANT 1 AND PLANT 2 HEADWORKS UPGRADES, 2.18(1) ODOR CONTROL SYSTEMS AND 2.25(2) VENTILATION IMPROVEMENTS | Work Force Goals: 10.85% Construction and 2.2% Goods and Services | N/A | N/A | N/A |
2.20%-SBE/GS Goal 10.85% SBE/Cons Goal |
N/A | ||
4/21/16 | RFQ 16-13981-KG | Preventive Maintenance for Radiology Chillers |
Level 1 Set Aside 100% SBE/Con Goal |
N/A | N/A | N/A |
100% Set Aside |
N/A | ||
4/20/16 | RPQ No. 170530 | Emergency Fence Repair/Installation for NSP1 Single Family Home – Carlton Little | No Measure (Federal Funding) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
4/19/16 | RFQ-16-14043-HO | AHU Damper Control Replacement Project – Highland Professional Garage | 100% Set Aide | N/A | N/A | N/A | 100% Set Aside | 100% Set Aside | N/A | |
4/19/16 | 20160076 | Joint Participation Agreement (JPA) Between Miami-Dade County and the City of West Park for Roadway Resurfacing Project Along NE 215 Street and NE 2nd Avenue to 525 feet East of NE 10th Avenue. | 13.42% SBE/Con Goal | N/A | N/A | N/A | 13.42% SBE/Con Goal | 13.42% SBE/Con Goal | N/A | |
4/18/16 | S-879 | Two-Year Countywide Contract For Cleaning And Televising Of Large Diameter Sewers, With County Option To Renew For An Additional Two Years On A Yearly Basis |
1.12% - SBE-GS Goal No Measure - SBE/Con |
N/A | N/A | N/A |
1.12% - SBE/GS Goal No Measure -SBE/Con |
N/A | ||
4/13/16 | RPQ No. 20160090 | East Venetian Causeway Bridges Rehabilitation | 1.6% SBE Cons Goal: Signing & Pavement Markings | N/A | N/A | N/A | 1.60% SBE - Con Goal | 1.60% SBE - Con Goal | N/A | |
4/12/16 | IBT 16-13975-JE | JMH Vehicle and Pedestrian Entrance for Emergency Room Project – Phase 2 | 51.5% SBE Cons Goal | N/A | N/A | N/A |
35.09 SBE- Con Goal 10.00% CWP Goal |
N/A | ||
4/12/16 | SA022616ZAW | Col. Zubkoff Head Start Center Awning Improvements Project | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/5/16 | RPQ No. 173179 | Emergency Replacement of the Domestic Water Booster Pump System at Claude Pepper High-Rise Building at 750 NW 18 Terr. | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/5/16 | W160022 | Gran Via Elderly Affordable Housing – Additional Parking | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/5/16 | E150044 | Mold Abatement – Dade County Courthouse 16th Floor | No Measure (Insufficient Availability) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/1/16 | W-889 | South Miami Heights Maintenance Facility | 22 % SBE-Cons Goal 5.59% SBE Good/Services Goal |
N/A | N/A | N/A |
22.48% SBE - Con Goal 5.59% SBE - GS Goal 10% CWP Goal |
N/A | ||
3/30/16 | 16-13906-KG | Replacement of Air Handling Units (AHU) #231, #232, & #233 at DTC Roof | 94% SBE-Cons Goal | N/A | N/A | N/A |
100% Set Aside (w/exemptions) 10% CWP Goal |
N/A | ||
3/29/16 | ITQ FR-032816-01-BB | HVAC AND CONTROLS – RTQ (BRIDGE) Bid No. RTQ-00299(B) [RFQ from MDFR] | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/25/16 | S-898 |
CD 4.5(1) INSTALLATION OF 4.1 MILES OF 54 INCH FORCE MAIN FROM SW 280 ST. AND SW 127 AVENUE TO EXISTING 54 INCH FORCE MAIN AT SW 248 ST. AND SW 107 AVENUE
|
SBE Construction - 5.11% and SBE Goods & Services - 5.16% | N/A | N/A | N/A |
5.11% SBE/Cons Goal 5.16% SBE/G&S Goal |
N/A | ||
3/25/16 | RPQ No. 131503-A | Greynolds Park - New Playground | 8.24% SBE/Con Goal | N/A | N/A | N/A |
8.24% SBE/Con Goal 10% CWP Goal |
N/A | ||
3/22/16 | 20160025 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Medley for Roadway Improvement Project along NW 89 Avenue from NW 93 Street to NW 95 Street and NW 93 Street from NW 89 Avenue to NW 87 Avenue | 11.07% SBE-Cons Goal | N/A | N/A | N/A | 11.70% SBE-Con Goal | 11.70% SBE-Con Goal | N/A | |
3/17/16 | SA032616NCPL | North County Head Start Center Parking Lot Improvements | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/17/16 | SA022616ZPL | Col. Zubkoff Head Start Parking Lot Improvements | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/17/16 | SA022616ZP | Repaint Exterior of Col. Zubkoff Head Start Center | No Measure (Funding Source) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/17/16 | SA022616NCP | Exterior Paint North County Head Start | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/17/16 | 20160048 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Florida City for Roadway Improvement Project along SW 344th Street from US-1 to SW 172nd Avenue | 6.7% SBE-Const Goal: (Concrete, Landscaping & Pavement Marking and Signage) | N/A | N/A | N/A | 6.70% SBE-Const Goal | 6.70% SBE - Const Goal | N/A | |
3/16/16 | MDADGG-004 | MDAD MCC 7360 Work Order Based Program Emergency Priority Maintenance Construction Services Glass and Glazing | No Measure | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
3/16/16 | MDADGG-005 | MDAD MCC 7360 Work Order Based Program Emergency Priority Maintenance Construction Services Glass and Glazing | No Measure | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
3/14/16 | RFQ-16-13870-HO | Supply and Install Two (2) New Rotary Vane Vacuum Oil-Less Pump Motor | 100% SBE-Con Goal | N/A | N/A | N/A | 100% Level 1 Set Aside | 100% Level 1 Set Aside | N/A | |
3/8/16 | Z000120 GOB ESP | Culmer/Overtown Neighborhood Services Center | Work Force Goals: 21.72% Construction and 2.00% Goods and Services | N/A | N/A |
SBE/Cons 30.10% Goal 2.00% SBE/G&S Goal 10.00% CWP Goal |
N/A | |||
3/4/16 | RPQ 170328-R | Fence Repair for NSPI Single Family Homes 245 and 5661 | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/3/16 | RPQ 143761 | Ark Creek Park – Chickee Hut/Shade Structure and Slab Replacement | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/29/16 | RPQ 172258 | Emergency Repairs for Spalling Concrete and Steel Columns at Palm Court | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/23/16 | 790503-05-001 | South Dade Park Aquatic Facilities Development and Renovation | 19.77 % CSBE Goal: Site Preparation, Earthwork, Concrete, Masonry, Metals, Wood & Plastic, Doors & Windows, Finishes, Plumbing, and Electrical. 1.52 % SBE: Survey, Temporary Utilities, Temporary Fencing, Trash Removal / Clean Up, and Landscaping. | N/A | N/A |
1.66% SBE-G&S Goal 21.78% SBE-Const Goal |
N/A | |||
2/24/16 | Z00020A GOB ESP | Wynwood/Allapattah Neighborhood Service Center | 16.3% SBE Goal and 1.00 % Goods and Services | N/A | N/A | Under Review | Under Review | N/A | ||
2/24/16 | RPQ 20150202-R | WASD Street Rehabilitation Contract | Trade Set Aside: Traffic stripes and Markings: Painted and/or Thermoplastic | N/A | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||
2/24/16 | RFQ-16-13888-SW | Supply and Install Chilled Water Pump with VFD | 100% Set Aside: HVAC | N/A | N/A | N/A | 100% Set Aside | 100% Set Aside | N/A | |
2/19/16 | 20160015 | Street Lighting Maintenance | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/19/16 | 20160016 | Street Lighting Maintenance | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/17/16 | RPQ 171920 | Emergency Repairs to Concrete Slabs at 2101 and 2105 NW 18 Terr. At the Gwen Cherry Project, Site 15 | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/11/16 | RPQ 2015-020.04 | Cruise Terminal E Concourse | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/11/16 | RPQ 2015-020.03 | Cruise Terminal D Concourse | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/10/16 | RPQ 20160020 | Roadway Resurfacing Contract | Trade Set Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic and Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items. | N/A | N/A |
Trade Set Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | |||
2/9/16 | RPQ 171288 | Vacancy Preparation at Various Locations for Liberty Square | No Measure (Federal Funding) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/5/16 | RPQ 20160019 | Roadway Resurfacing Contract | Trade Set Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic and Concrete; Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items. | N/A |
Trade Set Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | ||||
2/5/16 | Work Order Contract No. 6 - RPQs 171090-171091-171092 | MCC 7360 Plan–CICC7360-0/08 RPQs No. 171090, 171091, 171092. Work Order Contract No. 6 | No Measure (Federal Funding) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/2/16 | 20150201-R | WASD Street Rehabilitation Contract | Trade Set Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | |||
2/2/16 | RPQ No. 170857 | Interior Vacancy Repairs (South Dade) | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/27/16 | TAC-R Project T-172A (R) | British Airways Airside Improvements Package “A” MIA D21 Galleries Lounge | SBE Construction Goal 17.43% SBE Goods & Services Goal .25% |
N/A | N/A | N/A |
SBE/G&S 0.25% Goal SBE/Cons 14.43% Goal 10% CWP Goal |
N/A | ||
1/21/16 | E160077 | Coral Gables Court – CIPP Lining Sewer Line | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/20/16 | E09-DERM-01-025-CEI | Former Aquagas Tank Farm at Opa-Locka Airport – Source Removal, Reporting, and Monitoring Well Installation on Behalf of the Miami-Dade Aviation Department (MDAD) |
No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
1/19/16 | 2010-037.02 | North Bulkhead Repairs Phase II | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/15/16 | RPQ 15R014 | Resources Recovery Cell 19 Closure | Sub-Contractor Goal 6.44% (Sod Installation) | N/A | 6.44% SBE-Cons Goal | 6.44% SBE-Cons Goal | N/A | |||
1/14/16 | RQPR1600004 | Swimming Pool Filter Maint/Repair Svc | Under Review | N/A | N/A | Under Review | Under Review | N/A | ||
1/12/16 | RQID1600012 | Chillers and HVAC Equipment Maintenance for WASD | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
1/12/16 | RPQ No. 142590 | Gwen Cherry Park-Reconstruction of Athletic Field | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/12/16 | RPQ No. 170083 | Electrical Repair for PHCD at Smather’s Plaza | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/11/16 | ITB 16-13814-JE (51015018) | JMH Central 2nd Floor Auditorium Modernization | CSBE Goal 74.4% | N/A |
100% Level 1 Set aside w/exception 10.00% CWP Goal |
N/A | ||||
1/5/16 | RPQ No. 170539 | Exterior Painting For Edison Court | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/6/16 | S-899 | CD 4.8 REHABILITATION OF 54-INCH PCCP FM FROM THE INTER. OF NW 11 ST. AND NW 37 AVE. TO THE INTER. NW 2 ST. AND NW 67 AVE. | Trade Set-Aside (2) (1) Paving (2) Hauling |
N/A | N/A |
Trade Set-Aside 1 Trade Set Aside 2 4.00% SBE/G&S Goal |
N/A | |||
1/7/16 | RPQ No. 170297 | Barrier Removal Renovations & Interior Finishes to Existing Community Toilets at RKH | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
12/29/15 | E09-DERM-01-024-CEI | Building 410 at Opa-locka Airport – Source Removal, Reporting, and Monitoring Well Installation on Behalf of the Miami-Dade Aviation Department (MDAD) | No Measure | N/A | No Measure | No Measure | N/A | |||
12/28/15 | RPQ 20150218 | People’s Transportation Plan (PTP) Oleta River Culvert Extension | 2.1 % SBE/Cons Subcontractor Goal | N/A | 7.90% SBE/Cons Goal | 7.90% SBE/Cons Goal | N/A | |||
12/24/15 | 129547 | Matheson Hammock Marina – Floating Docks | No Measure | N/A | No Measure | No Measure | N/A | |||
12/23/15 | DB15-PWWM-01 (20150195) | Roadway Improvements to NE 2 Avenue from NE 69 Street to NE 84 Street | SBE A/E Measure: Land Surveying 7.0%, Landscape Architecture 4.0%, SBE G/S Measure: MOT Devices 2.4%, SBE Construction Measure: Concrete 8.4%, Landscaping 1.6%, Signage & Pavement Markings 0.6%, CWP Goal: As applicable | N/A |
10.30% SBE Cons Goal 10% CWP Goal 4% SBE G&S Goal
|
N/A | ||||
12/22/15 | 15-131416-CW | Jackson Health System (JMH) Steam System Condensate Return Replacement Project | 30.00% SBE/Cons Goal | N/A | N/A |
30.00% SBE/Cons Goal 10% CWP Goal |
N/A | |||
12/16/15 | Z000128 (Phase I) | Richard E. Gerstein Justice Building – Abatement of Hazardous Material (Phase I) | No Measure (Insufficient Availability) | N/A | N/A |
No Measure 10% CWP Goal |
N/A | |||
12/14/15 | M2016-015 | Asbestos Abatement Services – 1001 Administration Building – Suite 105 | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
12/8/15 | 490601-15-001 | Trail Glades Range- Phase I Development | 22.06% - SBE/Cons Goal | N/A | N/A | 22.93% SBE Cons Goal | 22.93% SBE Cons Goal | N/A | ||
12/7/15 |
RFP 15-13736-TC (A) RFP 15-13736-TC (A) (CM) |
Pre-Construction and Construction Management Services for Projects at Various Jackson Health System Facilities: Jackson North Medical Center | SBE-C Goal 27.58% | N/A | N/A | N/A |
32.77% SBE-Cons Goal 6.31% SBE-Cons Goal CM |
N/A | ||
12/7/15 |
RFP 15-13736-TC (B) RFP 15-13736-TC (B) (CM) |
Pre-Construction and Construction Management Services for Projects at Various Jackson Health System Facilities: Jackson West | SBE-C Goal 34.43% | N/A | N/A | N/A |
34.05% SBE Construction Goal 6.31% -SBE Cons Goal CM |
N/A | ||
12/7/15 |
RFP 15-13736-TC (C) RFP 15-13736-TC (C) (CM) |
Pre-Construction and Construction Management Services for Projects at Various Jackson Health System Facilities: Jackson Memorial Hospital Main Campus | SBE-C Goal 27.58% | N/A | N/A | N/A |
32.77% SBE-Cons Goal 6.31% SBE - Cons Goal CM 25.20% CWP Goal |
N/A | ||
12/7/15 |
RFP 15-13736-TC (D) RFP 15-13736-TC (D) (CM) |
Pre-Construction and Construction Management Services for Projects at Various Jackson Health System Facilities: Jackson Memorial Hospital Main Campus Floor Modernizations | SBE-C Goal 27.58% | N/A | N/A | N/A |
32.77% SBE/Cons Goal 6.31% SBE-Cons Goal CM 25.20% CWP Goal |
N/A | ||
12/7/15 |
RFP 15-13736-TC (E) RFP 15-13736-TC (E) (CM) |
Pre-Construction and Construction Management Services for Projects at Various Jackson Health System Facilities: Jackson South Community Hospital | SBE-C Goal 27.58% | N/A | N/A | N/A |
32.77% SBE/Cons Goal 6.31% SBE/ Cons Goal CM |
N/A | ||
12/7/15 |
RFP 15-13736-TC (F) RFP 15-13736-TC (F) (CM) |
Pre-Construction and Construction Management Services for Projects at Various Jackson Health System Facilities: Jackson Rehabilitation Hospital | SBE-C Goal 34.43% | N/A | N/A | N/A |
34.05% SBE-Cons Goal 6.31% SBE Cons Goal CM 25.20% CWP Goal |
N/A | ||
12/3/15 | 20150201 | WASD Street Rehabilitation Contract | Trade Set Aside: Traffic Stripes and Markings: Painted and/or Thermoplastic | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | |||
12/3/15 | 20150202 | WASD Street Rehabilitation Contract | Trade Set Aside: Traffic Stripes and Makings: Painted and/or Thermoplastic | N/A | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||
12/2/15 | RPQ 167054 | Exterior Paint for Southridge I | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
12/2/15 | Fed Ex BP #3 | Sports Lighting System | 6.90% SBE/Cons Subcontractor Goal | N/A | Under Review | Under Review | N/A | |||
12/15/15 | S-890 | CDWWTP Chlorination Facilities Consent Decree Project 2.17 | 5.16% SBE/Cons Goal | N/A |
1.75% SBE-G&S Goal 5.00% SBE Cons Goal |
N/A | ||||
11/23/15 | RPQ No. MDFRD-502-USR-P | USAR Exterior Painting Trailers | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/17/15 | 20150187 | Roadway Improvements to SW 152 Street from SW 157 Ave to SW 147 Ave | 24.4% SBE/Cons Goal 1.1% SBE/GS Goal |
N/A | N/A |
1.10% SBE/G&S Goal 24.40% SBE/Cons Goal |
N/A | |||
11/16/15 | RPQ No. 306670 | Park and Ride Facility at Kendall and SW 127th Avenue | 0% DBE Goal | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/13/15 | RPQ# 169237 | Boiler Maintenance/Inspections and Repair at PHCD | No Measure (Federally Funded) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
11/10/15 | RPQ# MDAD U113A | Opalocka Airport Air Traffic Control Tower Beacon Light Installation | 11.8% SBE- Const Goal | N/A | N/A | Under Review | Under Review | N/A | ||
11/10/15 | MCC-T-021-A | MIA- Gates D1 & D2 Modification to Receive the A380 Aircraft | 18% SBE-Const Goal | N/A | N/A | 16.66% SBE/Cons | 16.66% SBE/Cons | N/A | ||
11/2/15 | RPQ No. P0182 | Inspection of Sewer Laterals with CCTV | 0% SBE-Cons Goal | N/A | N/A | No Measure | No Measure | N/A | ||
11/2/15 | RFQ-15-13647-HO | Repair of Air Handling Units in Highland Parking Garage | Set-Aside | N/A | N/A | N/A | Under Review | Under Review | N/A | |
10/30/15 | DB15-WASD-03 | Design-Build Services for Installation of a 48-inch Diameter Water Main Downtown | 20% SBE-A&E Goal 8.2% SBE-Cons Goal 0.5% SBE-G&S Goal |
N/A | Under Review | Under Review | N/A | |||
10/30/15 | MCC-T-072-E | MIA- Lower Concourse “E” 3rd Level Sterile Corridor | Trade Set-Aside | N/A | N/A | N/A |
Trade Set-Aside 10% CWP Goal |
N/A | ||
10/28/15 | RPQ No. 168611 | General Building Repair/Bathrooms for Rainbow Village for Miami-Dade Public Housing and Community Development | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
10/22/15 | RPQ No. 20150169 | Roadway Improvements to SW 328th street from US-1 to SW 162nd Avenue | 19% SBE/Cons Goal 4% SBE/GS Goal |
N/A |
4% SBE/G&S Goal 19% SBE/Cons Goal |
N/A | ||||
10/20/15 | W160003 | MacFarlane Homestead Historic District – Rehabilitation of Three Single Family Residences | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
10/20/15 | RPQ No. 20150157 | Push-Button Contract for Roadway Resurfacing | Trade Set-Aside | N/A | N/A |
Trade Set Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | |||
10/16/15 | S-868R | Two-Year County Contract for Removal and Replacement of Sanitary Sewer Gravity Mains, With County Option to Renew for an Additional Two | 23.0% -SBE/Cons Goal 2.0% -SBE/GS Goal |
N/A | N/A | 23.0% -SBE/Cons Goal 2.0% -SBE/GS Goal |
23.0% -SBE/Cons Goal 2.0% -SBE/GS Goal |
N/A | ||
10/15/15 | RPQ No. 20150156 | Push-Button Contract for Roadway Resurfacing | Trade Set-Aside | N/A | N/A |
Trade Set-Aside 1 Trade Set-Aside 2 10% CWP Goal |
N/A | |||
10/15/15 | MCC-T-072-D | MIA- Lower Concourse “E” APM Station 4th Floor | Trade Set-Aside | N/A | N/A |
Trade Set Aside 10.00% CWP Goal |
N/A | |||
10/7/15 | RPQ# 136992 | MDPD Training Bureau/ Pool Resurfacing | No Measure | N/A | N/A | Under Review | Under Review | N/A | ||
10/7/15 | RPQ# MDADRAS-001 | MDAD/MCC Work Order-Based Program-Emergency/Priority Fac. Mgmt. Roadway Striping | No Measure (Insufficient Availability) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
10/7/15 | RPQ# MDADRAS-002 | MDAD/MCC Work Order-Based Program-Emergency/Priority Fac. Mgmt. Roadway Striping | No Measure (Insufficient Availability) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
10/7/15 | RPQ# MDADRAS-003 | MDAD/MCC Work Order-Based Program-Emergency/Priority Fac. Mgmt. Roadway Striping | No Measure (Insufficient Availability) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
10/6/15 | 10027602-R | MDAD Glazing Service Contract 2015-2018 | No Measure (Insufficient Availability) | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
10/6/15 | RPQ No. 20150134 | Safe Route to Schools Locations, Phase 10, FM# 433443-1 | 9.91% DBE Goal | N/A | N/A | N/A | 9.91% DBE Goal | 9.91% DBE Goal | N/A | |
10/6/15 | RPQ No. 20150148 | Safe Route to Schools Locations, Phase 11, FM# 433444-1 | 9.91% DBE Goal | N/A | N/A | N/A | 9.91% DBE Goal | 9.91% DBE Goal | N/A | |
10/2/15 | S-758R | Conversion of Sewage Pump Station No. 418 to Booster Station | 13.25% SBE/Cons Goal 2.77 SBE/GS Goal |
N/A |
13.25% SBE/Construction Goal 4.00% SBE/G&S Goal |
N/A | ||||
9/30/15 | RPQ No. P0175 | Switch Logic Cabinet Overhaul Metromover | No Measure | N/A | N/A | Under Review | Under Review | N/A | ||
9/28/15 | RFQ15-13530-KG | Replacement of Heat Wheels for AHU #16 & #17 at East Tower | Set-Aside | N/A | N/A | N/A | 100% Level 1 Set Aside | 100% Level 1 Set Aside | N/A | |
9/25/15 | RPQ No. 20150133 | Roadway Resurfacing Contract | Trade Set Aside for Traffic Stripes and Concrete | N/A | N/A | N/A |
Trade Set Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | ||
9/24/15 | RPQ 167873 | Arthur Mays parking lot lighting improvements | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
9/24/15 | RQID1500136 | HVAC AND CONTROLS | Pre-Qualification Pool (each individual work order shall be sent to SBD for the recommendation of Small Business Measures) |
N/A | N/A | N/A | Measures to be determined | Measures to be determined | N/A | |
9/22/15 | RPQ No. 10045510 | Cured In Place Pipe Liner Installation at various MDAD locations | No Measure (Insufficient Availability) | N/A | N/A |
No Measure |
No Measure | N/A | ||
9/22/15 | 20150135 | Miami FEC Port Lead Reconnection Pre-Emption Circuits | No measure | N/A | N/A | No Measure | No Measure | N/A | ||
9/21/15 | RQID1500135 | Trenchless Pipe Installation and Pipe Rehabilitation Services | Under Review | N/A | N/A | N/A | Measures to be determined | Measures to be determined | N/A | |
9/17/15 | DB15-SEA-01 /2015-055 | Cruise Terminal F Upgrades | SBE/ Construction Goal- 8.92% SBE/ Good & Services Goal – 6% SBE/ A&E Goal- 14% |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
9/14/15 | RPQ No. 20150132 | Roadway Resurfacing Contract | Trade Set-Aside for Traffic Stripes and Concrete | N/A | N/A | N/A |
Trade Set Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | ||
9/11/15 | RPQ No. 167460 | Three Round Towers | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
9/8/15 | RFPQ 15-13462-SR | Repair Of Sidewalks At The Exterior Of Park Plaza East Garage | 100% SBE/Cons Level 1 Set-Aside | N/A | N/A | N/A |
100% SBE/Cons Level 1 Set-Aside |
100% SBE/Cons Level 1 Set-Aside | N/A | |
9/3/15 | RPQ No. P0178 | Asbestos Roof Removal at Miami Maintenance Facility | No Measure (Insufficient Availability) | N/A | N/A | No Measure | No Measure | N/A | ||
9/3/15 | RPQ#10038377 | MCC-7360 for Terrazzo & Miscellaneous Flooring Installation, Maintenance, Repairs and/or Replacement at MDAD Operated Facilities | No Measure | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
9/3/15 | MCC #U055A | MIA- Interior Renovations Relocation of ID Section and Drivers Training |
Trade Set Aside 10% CWP Goal |
N/A | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||
8/31/15 | MCC-V040A-4 | MIA-Satellite E Pavement Rehabilitation-Package #4 Fuel System and Environmental Controls | No Measure | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
8/31/15 | MCC-V040A-3 | MIA-Satellite E Pavement Rehabilitation-Package #3 Bituminous Concrete Milling | 6% SBE- Construction Goal | N/A | N/A | N/A |
6% SBE/Cons Goal 10% CWP Goal |
N/A | ||
8/31/15 | MCC-V040A-2 | MIA-Satellite E Airside Improvements-Package #2 Pavement/Concrete Work | 15% SBE- Construction Goal | N/A | N/A | N/A |
15% SBE/Cons Goal 10% CWP Goal |
N/A | ||
8/28/15 | MCC-V040A-1 | MIA-Satellite E Pavement Rehabilitation | Trade Set-Aside (Package “A” General Work; Package “B” Pavement Markings; Package “C” Electrical) | N/A | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||
8/28/15 | AAA-08-20-2015-2 | Cold Food Station | N/A | N/A | N/A | N/A | 100% Set Aside SBE/Construction Goal | N/A | ||
8/28/15 | AAA-08-20-2015-3 | Retail Kiosk #2 | N/A | N/A | N/A | N/A | 100% Set Aside SBE/Construction Goal | 100% Set Aside SBE/Construction Goal | N/A | |
8/27/15 | RPQ No. 305373 | I-95 Track Work | N/A | N/A | N/A | No Measure | No Measure | N/A | ||
8/27/15 | MCC-U-010-D | MIA-Satellite E Airside Improvements | Trade Set-Aside (Package “A” General Work; Package “B” Pavement Markings; Package “C” Electrical) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/26/15 | RPQ No. P0175 | One year Countywide Contract For Evaluation Of Existing Gravity Sewers With Low Voltage Exfiltration Test, Cleaning And CCTV Inspection Of Sewer Basins & Manholes For I/I Reduction Within Miami-Dade County, Florida | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
8/26/15 | RPQ131395 | Partner’s Park- Restroom and Storage Buildings Improvements | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/26/15 | RQAV1500022 | Switchgear Failure Repairs | No Measure (Emergency) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/24/15 | RFQ No. MDAD-15-03 | Airport Signage Fabrication and Installation Services | No Measure (Insufficient Availability) | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
8/21/15 | RPQ# MDADGG-001 | Glass & Glazing at all Operated MDAD Facilities Service Contract | No Measure (Insufficient Availability) | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
8/21/15 | RPQ# MDADGG-002 | Glass & Glazing at all Operated MDAD Facilities Service Contract | No Measure (Insufficient Availability) | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
8/20/15 | AAA-08-20-2015 | Retail Kiosk #1 | N/A | N/A | N/A | N/A | 100% Set Aside SBE/Construction Goal | 100% Set Aside SBE/Construction Goal | N/A | |
8/20/15 | AAA-08-20-2015-1 | Food Stations | N/A | N/A | N/A | N/A | 100% Set Aside SBE/Construction Goal | 100% Set Aside SBE/Construction Goal | N/A | |
8/20/15 | RQID1500121 | Led And Induction Lighting Systems - RTQ | Pre Qualification Pool (Each Individual Work Order Will Be Submitted To SBD For Review) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/19/15 | 2013-015.08 | Cruise Terminal H Tent – HVAC Retrofit | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/13/15 | RFQ-15-13417-SW | Park Plaza West Basement Replace CHW Piping Insulation | SBE/Construction Set-Aside | N/A | N/A | N/A | 100% Level 1 Set Aside | 100% Level 1 Set Aside | N/A | |
8/11/15 | MDADTF-003 | Terrazzo Flooring at all Operated MDAD Facilities Service Contract | No Measure (Insufficient Availability) | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
8/11/15 | MDADTF-002 | Terrazzo Flooring at all Operated MDAD Facilities Service Contract | No Measure (Insufficient Availability) | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
8/11/15 | MDADTF-001 | Terrazzo Flooring at all Operated MDAD Facilities Service Contract | No Measure (Insufficient Availability) | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
8/11/15 | MCC-V-099-A | MIA-Relocation of I.C.E. Offices to Suite 11508 | Trade Set-Aside | N/A | N/A | N/A |
Trade Set-Aside 10% CWP Goal |
N/A | ||
8/6/15 | M2015-022 | Parking Improvements (Portwide) | SBE- Construction Trade Set-Aside for Pavement Marking and Concrete | N/A | N/A | N/A |
Trade Set Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | ||
8/6/15 | MCC-V-075-A | MIA - Structural Bridge 3111 Repairs | Trade Set-Aside | N/A | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||
7/29/15 | ITB 15-13381-KG-AHU | Replacement at South Wing and Central Building | 15% SBE- Construction Goal | N/A | N/A | N/A |
15.00% SBE/Cons Goal 25.20% CWP Goal |
N/A | ||
7/28/15 | RPQ 165824 | Lemon City Parking Lot Improvements | No Measure – Federally Funded | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/22/15 | RPQ No. 123952 | Debbie Curtin Park – Walkway and Site Improvements | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/22/15 | RPQ No. 165809 | Liberty Square Parking Lot Improvements | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/20/15 | RPQ No. 129695-A | Southridge Park Running Track | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/20/15 | RPQ No. 129693-A | Goulds Park/Running Track | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/20/15 | RFQ-15-13357-SW | Trauma Building Plumbing Repair | 100% SBE/Cons Level 1 Set-Aside | N/A | N/A | N/A | Under Review | Under Review | N/A | |
7/14/15 | RPQ No. EC-HOPEVI-40C2 | Hope VI 40Y Certification Repairs | No Measure (Funding Source) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/1/15 | ITB 15-13304-JE | Jackson Memorial Hospital – Highland Professional Building 7th Floor Medical Offices | 45.6% SBE-Construction Goal | N/A | N/A | N/A |
45.50% SBE-Construction Goal 25.20% CWP Goal |
N/A | ||
6/23/15 | RPQ No. P0168 | One year Countywide Contract For Rehabilitation Of Sanitary Sewers By The Cured-IN-Place Pipe Lining Method | No Measure | N/A | N/A |
No Measure 10% CWP Goal |
N/A | |||
6/22/15 | 300385 | ARRA Municipalities – City of North Miami Bus Shelters | No Measure (Federally Funded - DBE) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/23/15 | Z000128-W150050 | Richard E. Gerstein Justice Building – Abatement of Hazardous Flooring Materials for Temp Café. | No Measure – Insufficient Availability | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/18/15 | MCC-U-055A | MIA Interior Renovations Relocation of ID Section and Drivers Training | SBE Construction Trade Set-Aside (11 Packages) | N/A | N/A | N/A |
Trade Set Aside 10.00% CWP Goal |
N/A | ||
6/17/15 | ITB 15-13256-JE | Jackson South Community Hospital (JSCH) 4th Floor In-Patient Unit Renovation Project | 23% SBE-Construction Goal | N/A | N/A |
23.00% SBE/Cons Goal 25.20% CWP Goal |
N/A | |||
6/17/15 | ITB 15-13255-JE | Holtz East Tower (ET) 6B Renovation Project | 27.75 SBE-Construction Goal | N/A | N/A |
27.75% SBE- Construction Goal 25.20% CWP Goal |
N/A | |||
6/17/15 | ITB 15-13254-JE | Low Voltage Delta Cabling Services | 10% SBE - Construction Goal | N/A | N/A |
10.00% SBE-Construction Goal 10.00% CWP Goal |
N/A | |||
6/12/15 | RPQ No. 299527 | Metromover Public Address System Replacement | 10% DBE Goal | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/12/15 | RQAV1500022 | Switchgear Failure Repairs | No Measure (Emergency) | N/A | N/A | N/A | Under Review | Under Review | N/A | |
6/10/15 | RPQ No. 164330 | Work Order Contract No. 5 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/10/15 | RPQ No. 164331 | Work Order Contract No. 5 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/10/15 | RPQ No. 164332 | Work Order Contract No. 5 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/10/15 | RPQ No. 164333 | Work Order Contract No. 5 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/10/15 | RPQ No. 164334 | Work Order Contract No. 5 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/10/15 | RPQ No. 164335 | Work Order Contract No. 5 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/10/15 | RPQ No. 164336 | Work Order Contract No. 5 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/10/15 | RPQ No. 164337 | Work Order Contract No. 5 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/10/15 | RPQ No. 164338 | Work Order Contract No. 5 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/9/15 | BP No. 25 | Sports Lighting System | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
6/4/15 | BP No. 83 | Furnish and Install the Underground Storm Water System | 10% SBE Construction | N/A | N/A | 10% SBE Construction Goal | 10% SBE Construction Goal | N/A | ||
5/29/15 | MCC S100A | MCC S100A –MIA-CC G Existing Switchgear Replacement and Ground Support Services | Trade Set-Aside Package “A” Electrical | N/A | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||
5/29/15 | BP No. 28 | Furnish and Install Audio System | 2% SBE Construction Goal | N/A | N/A | 2% SBE-Construction Goal | 2% SBE-Construction Goal | N/A | ||
5/28/15 | RPQ No. 20150061 | Roadway Resurfacing Contract | Trade Set-Asides (Traffic Stripes and Markings: painted and/or thermoplastic; Concrete: sidewalk and/or curb and gutter) | N/A | N/A |
Trade Set-Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | |||
5/27/15 | RPQ No. 20150062 | Roadway Resurfacing Contract | Trade Set-Asides (Traffic Stripes and Markings: painted and/or thermoplastic; Concrete: sidewalk and/or curb and gutter) | N/A | N/A |
Trade Set-Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | |||
5/26/15 | 101-0146-M (RM) | Maintenance and Repair, Pipeline (Poly Pig Cleaning) | No Measure (Accessing a Pinellas County Contract) | N/A | N/A | No Measure | No Measure | N/A | ||
5/22/15 | S-871 | North District Wastewater Treatment Plant Pretreatment / Sludge Transfer Rehabilitation | 6.19 % SBE/Cons Goal 1.00% SBE/GS Goal |
N/A | N/A |
0.97% SBE/G&S Goal 5.78% SBE/ Const Goal |
N/A | |||
5/22/15 | RPQ No. 294158 | Bus Garage Plumbing | No Measure – (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/19/15 | RQET1500007 | Hewlett Packard Network Hardware and Services | Bid Preference | N/A | N/A | Bid Preference | Bid Preference | N/A | ||
5/18/15 | RQET1500006 | Hewlett Packard Storage Array, Hardware and Services | Bid Preference | N/A | N/A | Bid Preference | Bid Preference | N/A | ||
5/18/15 | RPQ No. 20150068 | Bridge Rehabilitation – William Powell Bridge | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
5/18/15 | M2015-024 | Asbestos Abatement Services – 1001 | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
5/15/15 | RPQ No. 20150067 | Roadway Improvements – Alley North of SW 81 St. between SW 67 Avenue to SW 69 Avenue | 10% - SBE-Construction Goal | N/A | N/A | 14.42% SBE-Const Goal | 14.42% SBE-Const Goal | N/A | ||
5/12/15 | RQID1500090 | Playground – Installation And Infrastructure Services (Prequalification Pool) | Workforce Goal | N/A | N/A | N/A | Workforce Goal | Workforce Goal | N/A | |
5/12/15 | RPQ No. 294742 | Parking Space Counters @ Metrorail Garages | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/12/15 | RPQ No. 163837 | Expedited Work Order Contract No. 1 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/11/15 | RPQ No. W140040 | ISD/FUMD/Ice Plant Roof Replacement | No Measure | N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/5/15 | RPQ No. 294377 | MIC Additional Rain Canopies | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/1/15 | RPQ No. 10027602 | MDAD Glazing Service Contract | No Measure | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
5/1/15 | RPQ No. 20150018 | Crandon Blvd. Milling & Resurfacing | Trade Set-Aside | N/A | N/A | N/A | Trade Set-Aside | Trade Set-Aside | N/A | |
4/30/15 | MDAD718-R | MIA Cc-E E-Satellite and Misc. Locations Glazing Service | No Measure | N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
4/30/15 | BP No. 30 | Furnish and Install Security System | 2% - SBE-Const - Goal | N/A | N/A | 2.00%-SBE-Const Goal | 2.00%-SBE-Const Goal | N/A | ||
4/27/15 | RPQ No. W-931 | Furnish And Install 36-Inch D.I. Water Transmission Main Along SW 152 ST. From SW 137 Ave. To SW 112 Ave | 7.27 % SBE/Cons Goal | N/A | N/A |
4.00% SBE/G&S Goal 7.27% SBE/Const Goal 10% CWP Goal |
N/A | |||
4/23/15 | RPQ 163336 | Spalling concrete repairs to the exterior corridors | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/14/15 | BP No. 88 | Broadcast Truck Area | 10% - SBE-Const - Goal | N/A | N/A | 10%-SBE-Const-Goal | 10%-SBE-Const-Goal | N/A | ||
4/14/15 | BP No. 74 | Shade Canopy Metal Panels | 2% - SBE-Const - Goal | N/A | N/A | 2%-SBE-Const-Goal | 2%-SBE-Const-Goal | N/A | ||
4/14/15 | BP No. 75 | Shade Canopy Roofing | 2% - SBE-Const - Goal | N/A | N/A | 2%-SBE-Const-Goal | 2%-SBE-Const-Goal | N/A | ||
4/8/15 | RPQ No. P0165 | One Year County Wide Contract for Evaluation of Existing Gravity Sewers with CCTV | No Measure | N/A | N/A |
No Measure - SBE/G&S No Measure -SBE/Cons 10% CWP Goal |
N/A | |||
4/7/15 | BP No. 51 | Escalator Canopy Steel | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
4/6/15 | BP No. 44A | Miscellaneous Steel | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
4/2/15 | BP No. 73 | Curtainwall Removal and Reinstallation | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
4/2/15 | BP No. 54 | Miscellaneous Steel | No Measure | N/A | N/A | Under Review | Under Review | N/A | ||
4/2/15 | BP No. 2A | MEP Demolition | No Measure | N/A | N/A | Under Review | Under Review | N/A | ||
4/2/15 | BP No. 26 | Structured Cabling Infrastructure | 10% - SBE-Const - Goal | N/A | N/A | 10%-SBE-Const Goal | 10%-SBE-Const-Goal | N/A | ||
4/2/15 | BP No. 27 | Broadcast Infrastructure | 20% - SBE-Const - Goal | N/A | N/A | 20% - SBE-Const-Goal | 20% - SBE-Const - Goal | N/A | ||
4/1/15 | RPQ No. EC-MGI-002 | Miami Gardens Interior | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/27/15 | BP No. 16 | Facilities Trash Chutes | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
3/26/15 | Section 15-3000 | Courtside Family Apartments (Fire Sprinklers) | Set Aside | N/A | N/A | 100% Set Aside | 100% Set Aside | N/A | ||
3/26/15 | Section 15-7000 | Courtside Family Apartments (HVAC) | No Measure | N/A | N/A | No Measure | No Measure | |||
3/26/15 | Section 09-9000 | Courtside Family Apartments (Paints and Coating) | Set-Aside | N/A | N/A | 100% Set Aside | 100% Set Aside | N/A | ||
3/26/15 | Section 10-5220 | Courtside Family Apartments (Fire Extinguishers) | Set-Aside | N/A | N/A | 100% Set Aside | 100% Set Aside | N/A | ||
3/26/15 | Section 10-5380 | Courtside Family Apartments (Canopies) | Set-Aside | N/A | N/A | 100% Set Aside | 100% Set Aside | N/A | ||
3/26/15 | Section 02-8700 | Courtside Family Apartments (Site Furnishings) | 100% - SBE-CONS - Set-Aside | N/A | N/A | 100%-SBE-Construction -Set Aside | 100% SBE-Construction Set Aside | N/A | ||
3/26/15 | Section 04-7200 | Courtside Family Apartments (Cast Stone) | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
3/26/15 | Section 05-5200 | Courtside Family Apartments (Handrails and Railing) | 100% - SBE-CONS - Set-Aside | N/A | N/A | No Measure | No Measure | N/A | ||
3/26/15 | Section 05-5000 | Courtside Family Apartments (Miscellaneous Metals) | 100% - SBE-CONS - Set-Aside | N/A | N/A | 100% SBE - Construction - Set Aside | 100% SBE-Construction - Set Aside | N/A | ||
3/26/15 | Section 06-4000 | Courtside Family Apartments (Cabinetry) | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
3/26/15 | Section 07-1000 & 07-9200 | Courtside Family Apartments (Dampproofing & Waterproofing) | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
3/26/15 | BP No. 29 | Video Boards | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/23/15 | MDADSM-001 thru 005 | MDAD CSBE/MCC Pilot Program-Maintenance Construction | No Measure | Under Review | N/A | Under Review | Under Review | Under Review | N/A | |
3/23/15 | MDADDW-001 thru 005 | MDAD CSBE/MCC Pilot Program-Maintenance Construction | No Measure | Under Review | N/A | Under Review | Under Review | Under Review | N/A | |
3/20/15 | BP No. 24 | Translucent Canopy Panels | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
3/19/15 | RPQ No. 129693 | Gould’s Park/Running Track | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/19/15 | RPQ No. 129695 | Southridge Park-Running Track | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/18/15 | RPQ No. Project Order #4 | MDAD-Quick Response Renovations | Trade Set-Aside | N/A | N/A | N/A | Trade Set-Aside | Trade Set-Aside | N/A | |
3/17/15 | RPQ 03-15-002 | Liberty City Renovation | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/16/15 | RPQ PR-03-15-01 | Liberty City Parking and Drain Project | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/13/15 | E09-DERM-01-014-CEI | Zoo Miami-Limited Source Removal and Associated Report, on behalf of Parks, Recreation and Open Spaces (PROS) | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/6/15 | RPQ No. 118241A | Multiple Parks - Boat Pump Out Project | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/4/15 | RPQ No. SA03021501MG | Miami Gardens CRC Asphalt Repair and Resurfacing | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure (Federally Funded) | No Measure (Federally Funded) | N/A | |
3/3/15 | BP No. 50 | General Contractor for South Club | 10% - SBE-Const - Goal | N/A | N/A | 20%-SBE-Const-Goal | 20%-SBE-Const-Goal | N/A | ||
3/3/15 | BP No. 49 | General Contractor North, East and West Clubs | 10 % SBE-CONS Goal | N/A | N/A | 20%-SBE-Const-Goal | 20%-SBE-Const-Goal | N/A | ||
3/3/15 | BP No. 48 | General Contractor for Founders Club | 10% - SBE-Const - Goal | N/A | N/A | 20%-SBE-Const-Goal | 20%-SBE-Const-Goal | N/A | ||
3/3/15 | RPQ No. 147491-R | Jollivette Plaza Exterior Site and Community Center UFAS Barrier Removal | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/2/15 | RPQ No. 161097 | Carrie Meek Building Demolition | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/26/15 | RPQ No. 161481 | Emergency Demolition of Rear Walls at New Haven Project | No Measure (Federally Funded / Emergency) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/25/15 | BP No. 15 | Signage and Wayfinding | 10% - SBE-Const - Goal | N/A | N/A | 10% - SBE-Const-goal | 10%-SBE-Const-goal | N/A | ||
2/25/15 | BP No. 44 | Miscellaneous Steel | 10% - SBE-Const - Goal | N/A | N/A | 10%-SBE-Const-goal | 10%-SBE-Const-goal | N/A | ||
2/25/15 | BP No. 45 | Toilet and Miscellaneous Accessories | 10% - SBE-Const - Goal | N/A | N/A | 100% Level 1 Set Aside | 100% Level 1 Set Aside | N/A | ||
2/24/15 | BP No. 46 | Millwork, Casework for Concessions | 11% - SBE-Const - Goal | N/A | 11%-SBE-Const-Goal | 11%-SBE-Const-Goal | N/A | |||
2/19/15 | BP No. 41 | Plumbing (Food Service & Restrooms) | 20% - SBE-Const - Goal | N/A | 20% SBE-Const-Goal | 20% SBE-Const-Goal | N/A | |||
2/19/15 | BP No. 42 | Mechanical (Food Service & Restrooms) | 20% - SBE-Const - Goal | N/A | 20% SBE-Const-Goal | 20% SBE-Const-Goal | N/A | |||
2/19/15 | BP No. 43 | Electrical (Food Service & Restrooms) | 20% - SBE-Const - Goal | N/A | 20% SBE-Const-Goal | 20% SBE-Const-Goal | N/A | |||
2/13/15 | VZ-MH001-13 | Historic Restoration and Preservation of Structural elements, at the Main House of Vizcaya Museum and Gardens | No Measure | N/A | No Measure | No Measure | N/A | |||
2/12/15 | RPQ No. 161175 | Emergency Fire Pump Controller | No Measure (federally funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/12/15 | RFP MDAD-13-14 | Request for Proposals for Parking Access & Revenue Control System (PARCS) | 3% - SBE-Construction- Goal No Measure - SBE-Goods & Services |
N/A | N/A |
2.89% -SBE-Const-Goal 10% CWP Goal |
N/A | |||
2/11/15 | RPQ No. 20150018 | Crandon Blvd. Milling & Resurfacing | Trade Set-Aside (Pavement Markings and Signage) | N/A | N/A | Trade Set-Aside | Trade Set-Aside | N/A | ||
2/9/15 | BP No. 39 | Overhead Coiling Doors | 5 % SBE-CONS Goal | N/A | 5%-SBE-Const-Goal | 5%-SBE-Const-Goal | N/A | |||
2/8/15 | BP No. 40 | Bi-Fold Stacking Doors | 5% - SBE-Const - Goal | N/A | 5% -SBE-Const-Goal | 5%-SBE-Const-Goal | N/A | |||
2/6/15 | BP No. 38 | Glass, Storefronts and Curtainwall | 5% - SBE-Const - Goal | N/A | 5% -SBE-Const-Goal | 5%-SBE-Const-Goal | N/A | |||
2/5/15 | RPQ No. 288960 | Existing Metromover Station Part 1 – Graphics and Signage Retrofit | 10% DBE Goal | N/A | N/A | N/A | 10% DBE Goal | 10% DBE Goal | N/A | |
2/5/15 | E09-DERM-01-013-CEI | Penny Thompson Park – Limited Source Removal and Associated Report, on behalf of Parks, Recreation and Open Spaces (PROS) | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
2/4/15 | MDAD 718 | Work Order Service Contract for Glazing Maintenance, Repairs and/or Replacement | N/A | N/A | Under Review | Under Review | N/A | |||
2/3/15 | BP No. 23 | Painting | 25% - SBE-Const - Goal | Under Review | N/A | 25% SBE-Const-Goal | 25% SBE-Const-Goal | N/A | ||
2/3/15 | BP No. 37 | Hard and Soft Flooring | 12% - SBE-Const - Goal | Under Review | N/A | 20% - SBE-Const-Goal | 20% - SBE-Const-Goal | N/A | ||
2/2/15 | BP No. 36 | Roofing for Bathrooms at 100 & 400 level and Concessions | 10% - SBE-Const - Goal | N/A | N/A | 100% SBE-Const - Set Aside | 100% SBE-Constr- Set Aside | N/A | ||
2/2/15 | BP No. 35 | Metal Studs/Drywall/Ceilings | 12% - SBE-Const - Goal | N/A | N/A | 100%-SBE-Const- Set Aside | 100%-SBE-Const-Set Aside | N/A | ||
1/30/15 | BP No. 13 | Underbowl Subroof System | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
1/30/15 | BP No. 33 | Furnish Hollow Metal Frames, Furnish and Install Doors and Hardware | 8% - SBE-Const - Goal | N/A | N/A | 12%-SBE-Const-Goal | 12%-SBE-Const-Goal | N/A | ||
1/30/15 | BP No. 34 | Masonry | 10% - SBE-Const - Goal | N/A | N/A | 15% -SBE-Const-Goal | 15% - SBE-Const-Goal | N/A | ||
1/28/15 | RPQ No. 158571 | Abe Arronovitz Gas Conversion and Roof Replacement | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/20/15 | W-930 | South Miami Heights Water Treatment Plant Injection Well System and Upper Floridan Aquifer Test Production Well Program | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
1/16/15 | RPQ NO. 159449 | Expedite Work Order Contract No. 1-North Region | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/16/15 | RPQ NO. 159450 | Expedite Work Order Contract No. 1-Central Region | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/16/15 | RPQ NO. 159451 | Expedite Work Order Contract No. 1-South Region | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
1/12/15 | RPQ No. P0163 | Central District Administration Bldg. Asbestos Clean-up (Phase II) | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
1/9/15 | AAA-01-09-2015-1 | Paver Removal & Replacement | 100% Set Aside | N/A | 100% Set Aside | 100% Set Aside | N/A | |||
1/9/15 | RPQ No. 20140229 | People’s Transportation Plan (PTP) Roadway Improvements to SW 264 Street from US-1 to SW 137 Street | 29% - SBE- Const – Goal | N/A |
30.69% SBE-Construction Goal 10% CWP Goal |
N/A | ||||
12/30/14 | BP No. 18 | Handicap Lifts | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
12/18/14 | RPQ NO. 105994 | Tamiami Park Pool Filtration System Replacement | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
12/18/14 | E09-DERM-01-009 CEI | Soil Trenching for Phase II Environmental Site Assessment at the Miami-Dade Police Department Simulator Ammunition, Classroom & Driving Range | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
12/15/14 | RPQ NO. CJ Liberty City 001 | Liberty City Community Resource Center | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
12/12/14 | RPQ NO. PR-081214-1 | Emergency Housing North Rehabilitation Project | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
12/12/14 | MCC T-021-A | MIA-Concourse “D” A380 Gate Modification Foundation Package | 18% - SBE- Const - Goal | N/A | N/A |
21.96% SBE - Const-Goal 10% CWP Goal |
N/A | |||
12/10/14 | 118699 | Black Point Park and Marina-Shrimpers Row Roadway Improvements Phase One | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
12/2/14 | BP No. 17 | Concrete Restoration | No Measure | N/A | No Measure | No Measure | N/A | |||
11/25/14 | BP No. 14 | Traffic Coating | 8% - SBE- Const - Goal | N/A | 8.19% SBE-Const-Goal | 8.19% SBE-Const-Goal | N/A | |||
11/25/14 | BP No. 22 | CIP Concrete Super Columns & Pile Cap Concrete | 14% - SBE- Const - Goal | N/A | 20% SBE-Const-Goal | 20% SBE-Const-Goal | N/A | |||
11/19/14 | RPQ P0158 | 20th Street Storage Tank Internal Protective Coating Repair | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
11/19/14 | 1-A RPQ 158638 | Work Order No. 4 North Sub-Region 1-A | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/19/14 | 1-B RPQ 158639 | Work Order No. 4 North Sub-Region 1-B | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/19/14 | 2-A RPQ 158640 | Work Order No. 4 Central Sub-Region 2-A | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/19/14 | 2-B RPQ 158641 | Work Order No. 4 Central Sub-Region 2-B | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/19/14 | 3-A RPQ 158642 | Work Order No. 4 South Sub-Region 3-A | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/19/14 | 3-B RPQ 158643 | Work Order No. 4 South Sub-Region 3-B | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/17/14 | RPQ No. MDFRD-USAR-HQC | USAR New Concrete Slab at HQ | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/14/14 | RPQ No. 20140206 | Push Button Contract for Intersection Improvements | Trade Set-Aside (Pavement Traffic Stripes and Markings; Concrete) | N/A | N/A |
Trade Set-Aside 2 Trade Set-Aside 1 10% CWP Goal |
N/A | |||
11/14/14 | RPQ No. 20140207 | Push Button Contract for Intersection Improvements | Trade Set-Aside (Pavement Traffic Stripes and Markings; Concrete) | N/A | N/A |
Trade Set-Aside 2 Trade Set-Aside 1 10% CWP Goal |
N/A | |||
11/10/14 | RQID1500028 | Playground – Installation and Infrastructure Services, Request to Qualify | Bid Preference | N/A | N/A |
No Measure 10% CWP Goal |
N/A | |||
11/5/14 | RPQ 158136 | Boiler Maintenance Inspections and Repairs | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/6/14 | BP No. 10 | Bowl - CIP Concrete | 14% - SBE- Const - Goal | N/A | 14% - SBE Construction Goal | 14% - SBE Construction Goal | N/A | |||
10/31/14 | BP No. 12 | Bowl Railings | 5% - SBE- Const - Goal | N/A | N/A | 5%-SBE-Construction Goal | 5%-SBE-Construction Goal | N/A | ||
10/22/14 | IT-01 | Low Voltage Installation | SBE – Construction Level 1 Set Aside | N/A | Level 1 Set Aside | Level 1 Set Aside | N/A | |||
10/21/14 | NSP1-D | Opa-Locka Demolition | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
10/17/14 | RPQ No. 20140183 | Push-Button Contract for Sidewalk Improvements – Multiple Sites | No Measure | N/A |
No Measure 10% CWP Goal |
N/A | ||||
10/15/14 | RPQ No. 20140184 | Push-Button Contract for Sidewalk Improvements – Multiple Sites | No Measure | N/A |
No Measure 10% CWP Goal |
N/A | ||||
10/14/14 | RPQ No. 20140164 | Push-Button Contract for Roadway Resurfacing | Trade Set-Aside (Pavement Markings and Concrete) | N/A | N/A |
Trade Set Aside 1 & 2 10% CWP Goal |
N/A | |||
10/14/14 | RPQ No. 20140163 | Push-Button Contract for Roadway Resurfacing | Trade Set-Aside (Pavement Markings and Concrete) | N/A | N/A |
Trade Set Aside 1 & 2 10% CWP Goal |
N/A | |||
10/10/14 | RPQ No. 20140167 | Culvert Replacement at NW 106 St & NW South River Drive | No Measure | N/A | 3.69 % CSBE Goal | 3.69% CSBE Goal | N/A | |||
10/9/14 | RPQ P0153 | One Year Countywide Contract for Rehabilitation of Sanitary Sewer by the Cured-in-Place Pipe Lining Method for PSIP projects | No CSBE Measure | N/A | PROJECT CANCELLED | PROJECT CANCELLED | N/A | |||
10/7/14 | RPQ P0154 | One Year County Wide Contract for Rehabilitation of Manholes Inflow and Infiltration Repair for PSIP | No Measure | N/A |
No Measure 10% CWP Goal |
N/A | ||||
10/7/14 | CCGJPA-2014.01 | Joint Participation Agreement (JPA) between Miami Dade County and City of Coral Gables for Roadway Improvement along Ponce De Leon from Salamanca Ave. to Antiquera Ave. | 4.3% CSBE Goal | N/A | 16.35 % CSBE Goal | 16.35% CSBE Goal | N/A | |||
10/6/14 | BP No. 21 | Provide Auger Cast-in-place Piles | 13% CSBE Goal | N/A | N/A | 13% CSBE Goal | 13% CSBE Goal | N/A | ||
10/3/14 | BP No. 11 | Provide Steel, Cable, metal decking and catwalks | 2.2% CSBE Goal | N/A | N/A | 2.20% CSBE Goal | 2.20% CSBE Goal | N/A | ||
10/2/14 | BP No. 7 | Replacement/modifications of mechanical equipment and piping | 10% CSBE Goal | N/A | N/A | 10% CSBE Goal | 10% CSBE Goal | N/A | ||
10/1/14 | BP No. 5 | Replacement/modifications of plumbing equipment and piping | 10% CSBE Goal | N/A | N/A | 10% CSBE Goal | 10% CSBE Goal | N/A | ||
10/1/14 | BP No. 6 | Design/replacement/modifications of fire protection equipment and piping | 2% CSBE Goal | N/A | N/A | 10% CSBE Goal | 10% CSBE Goal | N/A | ||
10/1/14 | BP No. 8 | Replacement/modifications of electrical equipment, feeders, equipment connections and fire alarm | 10% CSBE Goal | N/A | N/A | 10% CSBE Goal | 10% CSBE Goal | N/A | ||
10/1/14 | BP No. 19 | Replacement/Modifications of the Low Voltage Raceway Systems | 10% CSBE Goal | N/A | N/A | 10% CSBE Goal | 10% CSBE Goal | N/A | ||
9/30/14 | RPQ No. 20140165 | Drainage Improvements – Multiple Sites | No Measure | N/A | PROJECT CANCELLED | PROJECT CANCELLED | PROJECT CANCELLED | |||
9/25/14 | RPQ No. 156791 | Site Lighting and Fencing for Various Sites | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
9/24/14 | CMJPA-2014.01 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Miami along NE 2 Ave from NE 42 Street to NE 51 Street | 15.86% CSBE Goal | N/A | N/A |
19.98% CSBE Goal 19.70% CWP Goal |
N/A | |||
9/23/14 | RPQ No. 20140154 | Push Button Contract for Sidewalk Improvements | No Measure | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||||
9/23/14 | RPQ No. 20140156 | Push Button Contract for Sidewalk Improvements | No Measure | N/A |
Trade Set Aside 10% CWP Goal |
N/A | ||||
9/23/14 | 20140143 | Improvements to Cartagena Plaza Circle | Trade Set-Aside (2) Traffic Stripes and Marking (Painted and/or Thermoplastic) Concrete |
N/A | 19.89% CSBE Goal | 19.89% CSBE Goal | N/A | |||
9/19/14 | RPQ 113808 | Tropical Memorial Park - Football and Running Track Re- | 6.8% CSBE Goal | N/A | N/A | 6.80% CSBE Goal | 6.80% CSBE Goal | N/A | ||
9/17/14 | RPQ 20140161 | Joint Participation Agreement (JPA) between Florida Department of Transportation (FDOT) and Miami-Dade Transit (MDT)Busway Pedestrian Access Improvements, FM 41805019401, MDT-4 | No CSBE Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
9/17/14 | RQID1400148 | Protective Coating Services - Prequalification | Bid Preference | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | |||
9/15/14 | 122623 – A; B; C | Food Court Electrical Upgrade (A) Telephone System (B) Audio System (C) |
Food Court Electrical Upgrade (CSBE Set-Aside) Telephone System (No Measure - Proprietary) Audio System (No Measure - Proprietary) |
N/A | N/A |
(A) Level 1 Set-Aside; 100% CSBE goal (B) No Measure - Proprietary
|
N/A | |||
9/15/14 | MCC-P049A - 132702 | MIA Elevator Sump Pumps @ Cc “E” Lobby | No Measure (EMERGENCY) | N/A | N/A | No Measure - Emergency | No Measure - Emergency | N/A | ||
9/12/14 | BP-4 (A & B) | Vertical Transportation for Miami Dolphins Stadium Renovations | No Measure (Proprietary) | N/A | N/A | No Measure - Proprietary | No Measure - Proprietary | N/A | ||
9/12/14 | MCC-781-016R0 | MIA – NTD BHS Parts Storage Ramp Level MEP | No Measure (EMERGENCY) | N/A | N/A | No Measure - Emergency | No Measure - Emergency | N/A | ||
9/11/14 | CDJPA-2013.01 | Joint Participation Agreement (JPA) between Miami Dade County and City of Doral; NW 97 Avenue from NW 70 Street to NW 74 Street | 22.94% CSBE Goal | N/A | N/A | 22.94% CSBE Goal | 22.94% CSBE Goal | N/A | ||
9/8/14 | CVGJPA-2014.01 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Virginia Gardens, Intersection Improvement at NW 40 Street and NW 57 Avenue | 10.6% CSBE Goal | N/A | 16.35% CSBE Goal | 16.35% CSBE Goal | N/A | |||
9/5/14 | RPQ 147491 | Jollivette Plaza Exterior Site and Community Center UFAS Barrier Removal | No Measure – (Federally Funded) | N/A | N/A | N/A | No Measure - Federally Funded | No Measure - Federally Funded |
N/A | |
9/2/14 | 20140142 | Bridge Rehabilitation at SW 328 St over Levee L-31-E, FM 432762-1 | No Measure - CSBE (8.6% DBE Goal) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
9/2/14 | RPQ 20140144 | Seaboard Acres Storm-water Pump Station Retrofit and Pump Casing Replacement Project | 20% CSBE Goal | N/A | N/A |
20.66% CSBE Goal 10% CWP Goal |
N/A | |||
8/28/14 | RPQ P0152 | John E. Preston Water Treatment Plant Water Softening Tank #4 Coating | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
8/22/14 | RFP No. MDAD-11-14 | Baggage Handling Systems Operation and Maintenance (BHS O & M) | 15.42% CSBE Goal | N/A | N/A |
32.32% CSBE Goal 10% CWP Goal 3.02% SBE Goal |
N/A | |||
8/20/14 | 20140140 | Busway Pedestrian Access Improvements FM 41805019401, 3 of 3 | No CSBE Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/20/14 | 20140135 | WASD Street Rehabilitation Contract | Trade Set-Aside (Traffic Stripes & Markings) | N/A | N/A |
Trade Set-Aside 10% CWP Goal |
N/A | |||
8/20/14 | 20140139 | Busway Pedestrian Access Improvements FM 41805019401, 2 of 3 | No CSBE Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/20/14 | 20140138 | Busway Pedestrian Access Improvements FM 41805019401, 1 of 3 | No CSBE Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/18/14 | 20140134 | WASD Street Rehabilitation Contract | Trade Set-Aside (Traffic Stripes & Markings) | N/A | N/A |
Trade Set Aside 10% CWP Goal |
N/A | |||
8/18/14 | 147486 | Donn Gardens Exterior UFAS | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/13/14 | RQID1400139 | Chillers – Full-Service Maintenance | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
8/12/14 | 123752 | Pelican Harbor Marina – Fender Replacement | No Measure | N/A | No Measure | No Measure | N/A | |||
8/7/14 | TAC-N #T-172B | British Airways – MIA D21 Galleries Lounge, Package “B” | 6 % CSBE Goal | N/A | On Hold | On Hold | N/A | |||
8/6/14 | 400501-13-001 | Ruben Dario Park, Driveway Lighting & Access Control Fence | No Measure – Federally Funded | N/A | N/A | No Measure | No Measure | N/A | ||
8/1/14 | 1404-305301 | Emergency Liner Installation on Damaged/Deteriorated Sewer Lines | No Measure – Emergency | N/A | N/A | No Measure | No Measure | N/A | ||
8/1/14 | MDAD BC-10 | MDAD CSBE/MCC 7040 Work Order-Based Pilot Program for Maintenance Construction at MDAD Facilities | No Measure – Insufficient Availability | N/A | N/A | No Measure | No Measure | N/A | ||
7/29/14 | ITB 13-11538-JE | Job Order Contracts (JOC) | Combination of CSBE Set-Asides and CSBE Goals | N/A | N/A | N/A |
Combination of CSBE Set-Asides and CSBE Goals 10% CWP Goals |
N/A | ||
7/28/14 | 20140051-R (Resubmittal) | Push-Button Contract for Traffic Signal Improvements (North) | CSBE Trade Set-Aside for Traffic Stripes and Markings | N/A | N/A |
CSBE Trade Set-Aside 10% CWP Goal |
N/A | |||
7/28/14 | 20130272-R (Resubmittal) | Push-Button Contract for Traffic Signal Improvements (South) | CSBE Trade Set-Aside for Traffic Stripes and Markings | N/A | N/A |
CSBE Trade Set-Aside 10% CWP Goal |
N/A | |||
7/25/14 | 153605 | Moody Village and Moody Gardens UFAS FLA 5-081/069 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure (Federally Funded) | No Measure (Federally Funded) | N/A | |
7/24/14 | 20090317 | Joint Participation Agreement (JPA) between Miami Dade County and the City of Miami Drainage Improvements along South Miami Avenue | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
7/24/14 | 20140111 | Roadway Resurfacing Contract | -Trade Set-Aside #1 Pavement Markings -Trade Set-Aside #2 Concrete |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | |||
7/24/14 | 20140112 | Roadway Resurfacing Contract | Trade Set-Aside #1 – Pavement Markings - Trade Set-Aside #2 – Concrete |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goals |
N/A | |||
7/16/14 | RQID1400129 | HVAC & Controls: Repairs, Replace, Supply & Install | CSBE No Measure | N/A | N/A | N/A | CSBE No Measure-Accessing an existing Miami-Dade School Board Contract # 052-PP09 |
CSBE No Measure-Accessing an existing Miami-Dade School Board Contract # 052-PP09 |
N/A | |
7/8/14 |
1403-315751
|
OPF Opa-locka Airport Interior Service Road | No Measure (Federally Funded) 15% DBE Goal | N/A | N/A | N/A | THIS PROJECT IS CANCELLED |
THIS PROJECT IS CANCELLED |
THIS PROJECT IS CANCELLED |
|
7/8/14 | S019A | Opa-locka Airport Interior Service Road | No Measure (Federally Funded) 15% DBE Goal | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/8/14 | RPQ #4783 IDIS | Cliff’s Restaurant Demolition | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/30/14 | S-868 | Two-Year County Contract for Removal and Replacement of Sanitary Sewer Gravity Mains | 17.1 % CSBE Goal | 27% CSBE Goal | 27% CSBE Goal | N/A | ||||
6/26/14 | E09-Derm-01-007R1-ceI | Soil Trenching for Phase II Environmental Site Assessment at Two Parcels at the Future Park & Ride Station |
2.15 % CSBE Goal | N/A | N/A | No Measure | No Measure | N/A | ||
6/18/14 | W130088-R | Medical Examiner HVAC Equipment Replacement | 7% CSBE Goal | N/A |
7% CSBE Goal 25.20% CWP Goal |
N/A | ||||
6/17/14 | S142348 | ISD/Record Center – Mold Abatement of Materials Around Skylights | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
6/11/14 | RPQ No. 20140088 | Roadway Resurfacing Contract | Trade Set-Aside | N/A |
Trade Set Aside 1 & 2 14.45% CWP Goal |
N/A | ||||
6/2/14 | 20140081 | Tamiami Canal Bridge Replacement | No Measure | N/A | N/A | N/A | No Measure- Federally Funded | No Measure-Federally Funded | N/A | |
5/29/14 | TAC-R Project #T-172A | British Airways Airside Improvements – Package “A” MIA D21 Galleries Lounge | 8% CSBE Goal | N/A |
17.43% CSBE Goal 10% CWP Goal |
N/A | ||||
5/28/14 | ITB 14-11960-SR | JMH Campus-Wide Air Handler Unit (AHU) Replacements (Resubmittal) | 21.30% CSBE Goal | N/A |
19.36% CSBE Goal 25.20% CWP Goal |
N/A | ||||
5/27/14 | W-927 | Southwest Well-field Middle Lagoon Removal of Calcium Carbonate | 14.45% CSBE Goal | N/A | N/A | 14.45% CSBE Goal | 14.45% CSBE Goal | N/A | ||
5/27/14 | w130077 | ISD/FUMD/Central Support Facility – Multiple Chiller Replacement | 6% CSBE Goal | N/A | 6% CSBE Goal | 6% CSBE Goal | N/A | |||
5/21/14 | w130078 | Gerstein Justice Building – Install New Fan Walls, 1351 NW 12th Street, Miami FL 33125 | 9% CSBE Goal | N/A |
9% CSBE Goal 13.30% CWP Goal |
N/A | ||||
5/12//14 | S-866 (Resubmittal) | Two-Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Cured-in-Place Pipe Lining Method with County Option to Renew for an Additional Two years on a Yearly Basis | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
5/8/14 | RPQ 116010 | Ruben Dario Driveway Lighting | No Measure | N/A | Federally Funded | N/A | No Measure | No Measure | N/A | |
5/6/14 | RQID1400096 | Chillers/ Water Treatment Service Contract | Bid Preference | N/A | Federally Funded | No Measure | No Measure | N/A | ||
5/6/14 | P0145 | One Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Cured-in-Place Pipe Lining Method for PSIP Projects |
No Measure | N/A | No Measure | No Measure | N/A | |||
5/2/14 | RPQ 152573 | Work Order No. 3 North Sub-Region 1-A | No Measure | N/A | Federally Funded | N/A | No Measure | No Measure | N/A | |
5/2/14 | RPQ 152574 | Work Order No. 3 North Sub-Region 1-B | No Measure | N/A | Federally Funded | N/A | No Measure | No Measure | N/A | |
5/2/14 | RPQ 152575 | Work Order No. 3 Central Sub-Region 2-A | No Measure | N/A | Federally Funded | N/A | No Measure | No Measure | N/A | |
5/2/14 | RPQ 152576 | Work Order No. 3 Central Sub-Region 2-B | No Measure | N/A | Federally Funded | N/A | No Measure | No Measure | N/A | |
5/2/14 | RPQ 152577 | Work Order No. 3 South Sub-Region 3-A | No Measure | N/A | Federally Funded | N/A | No Measure | No Measure | N/A | |
5/2/14 | RPQ 152578 | Work Order No. 3 South Sub-Region 3-B | No Measure | N/A | Federally Funded | N/A | No Measure | No Measure | N/A | |
5/1/14 | RPQ 152157 | South Miami Gardens/Wynwood Homes/Richmond Homes/Wynwood Elderly/ Arthur Mays. Exterior Paint |
No Measure | N/A | Federally Funded | N/A | No Measure | No Measure | N/A | |
5/1/14 | RPQ 152158 | Lemon City FLA 5-051 Exterior Paint and Hurricane Shutters, Model Cities FLA 5-817 Parking Lot Re-surfacing | No Measure | N/A | Federally Funded | N/A | No Measure | No Measure | N/A | |
4/25/14 | RQID 1400090 | Security Gates Services | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
4/25/14 | RPQ 151197 | Arthur Mays Duplexes Re-roofing FLA 5-040 | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/21/14 | W120176 | Courthouse Annex – Replace Entire Roof | No Measure | N/A | No Measure | No Measure | N/A | |||
4/21/14 | P0144 | Annual Cleaning, Video Recording and Smoke Testing of Selected Portions of the MDWASD Sanitary Sewer System | No Measure | N/A | No Measure | No Measure | N/A | |||
4/16/14 | 20140056 | Roadway Resurfacing Contract | Two (2) CSBE Trade Set-Asides for Traffic Stripes & Markings and Concrete | N/A |
Trade Set Aside 2 Trade Set Aside 1 |
N/A | ||||
4/14/14 | P0142 | 36” Water Main along NW 87 Ave. from NW South River Dr. to NW 122 St. Phase II | 7% CSBE Goal | 7.58% CSBE Goal | 7.58% CSBE Goal | N/A | ||||
4/9/14 | 20140055 | Roadway Resurfacing Contract | Two (2) CSBE Trade Set-Asides for Traffic Stripes & Markings and Concrete | N/A |
Trade Set Aside 1 Trade Set Aside 2 |
N/A | ||||
4/9/14 | P0132 | One year Countywide Contract for Rehabilitation of Manholes Inflow and Infiltration Repair | No Measure | N/A | No Measure | No Measure | N/A | |||
4/4/14 | 20130272 | Push-Button Contract for Traffic Signal Improvements (South) | CSBE Trade Set-Aside for Traffic Stripes and Markings | N/A |
Trade Set Aside-1 10% CWP Goal |
N/A | ||||
4/4/14 | 20140051 | Push-Button Contract for Traffic Signal Improvements (North) | CSBE Trade Set-Aside for Traffic Stripes and Markings | N/A |
Trade Set Aside 1 10% CWP Goal |
N/A | ||||
4/4/14 | P0143 | Chemical Building Asbestos Removal at that Virginia Key Sewer Treatment Facility | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
4/3/14 | CMJPA-2013.01 | JPA Between Miami-Dade County and the City of Miami, Coconut Grove Sidewalk Improvements | No Measure | N/A | No Measure | No Measure | N/A | |||
3/28/14 | RFP No. MDAD-03-14 | Non-Exclusive Telecommunications and Network Management Services for the Miami-Dade Aviation Department | 8% CSBE Goal | N/A | N/A |
Trade Set-Aside 10% CWP Goal |
N/A | |||
3/25/14 | RPQ P0141 | Central District Wastewater Treatment Plant Digester P-2/D-3 Cover Replacement | No Measure | N/A | No Measure | No Measure | N/A | |||
3/24/14 | ITB 14-11792-JE | Backflow & Bypass Domestic Water Project | 20% CSBE Goal | N/A |
17.34% CSBE Goal 10% CWP Goal |
N/A | ||||
3/20/14 | 20140046 | Larchmont Gardens Pump Station Retrofit Phases 1 & 2 | 12% CSBE Goal | N/A |
26.90% CSBE Goal 13.70% CWP Goal |
N/A | ||||
3/19/14 | 20130201 | People’s Transportation Plan (PTP) Roadway Improvements on SW 264 Street from US-1 to SW 137 Avenue | 16% CSBE Goal | N/A |
16% CSBE Goal 10% CWP Goal |
N/A | ||||
3/19/14 | M2012-018.04-R | Asbestos/Abatement Services – 1001/1015 Administrative Offices – Suites 107 & 101 | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
3/11/14 | 14S003 | South Dade Landfill Cell 5 Construction | 4.85% CSBE Goal | N/A | 4.85% CSBE Goal | 4.85% CSBE Goal | N/A | |||
3/11/14 | 109730 | Zoo Miami – Asian Elephant Enclosure | 7.42% CSBE Goal | N/A | N/A | 7.42% CSBE Goal | 7.42% CSBE Goal | N/A | ||
3/10/14 | W130026 | Jackson Head Start Facility – Fence Project | No Measure (Federally Funded) | N/A | N/A | No Measure -Federally Funded | No Measure - Federally Funded | N/A | ||
3/10/14 | 118241 | Boat Pump Out Project | No Measure (Federally Funded) | N/A | N/A | N/A | No Measure - Federally Funded | No Measure -Federally Funded | N/A | |
3/10/14 | RPQ P0138 | Replacement of Finish Water Meter #1 at the Alexander Orr Water Treatment Facility, PCTS No. 12577 | 5% CSBE Goal | N/A | 5% CSBE Goal | 5% CSBE Goal | N/A | |||
3/5/14 | ITB 14-11683-WAG | Jackson Medical Towers 1st Floor Resources Renovation | 40.81% CSBE Goal | N/A |
100% Level 1 set aside with exception 25% CWP Goal |
N/A | ||||
3/3/14 | ITB 14-11647-KG | Jackson Medical Towers 9th Floor Revenue Cycle Renovation | 37.89% CSBE Goal | N/A | N/A |
100% Level 1 Setaside with exception 25% CWP Goal |
N/A | |||
2/28/14 | 20130281 | Roadway Resurfacing Contract | Trade Set Asides (2) : Pavement Markings and Concrete | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 |
N/A | |||
2/28/14 | 20130280 | Roadway Resurfacing Contract | Trade Set Asides (2) : Pavement Markings and Concrete | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 |
N/A | |||
2/27/14 | E-08-DERM-01-037-URS | Former Bldg. 147 at the Opa-Locka Executive Airport, Source Removal , on behalf of the Miami- Dade County Aviation Department (MDAD) |
No Measure | N/A | No Measure | No Measure | N/A | |||
2/25/14 | 112018 | Greynolds Park – Cedar Shake Roof Installations | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/7/14 | 20140014 | Roadway Improvements – Multiple Sites | 14.8% CSBE Goal | N/A |
14.80% CSBE Goal 19.00% CWP Goal |
N/A | ||||
2/6/14 | 20120004 | Peoples Transportation Plan (PTP) Roadway Improvements to NW 74th Street from NW 114th Ave to NW 107th Ave | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/4/14 | 146527 | Annie Coleman 15 UFAS | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
1/24/14 | 20140012 | Roadway Improvements to NW 36th Ave from N. River Dr. to NW 36th St. Phase 1 | 14% CSBE Goal | N/A |
14.30% CSBE Goal 10% CWP Goal |
N/A | ||||
1/24/14 | S-866 | Two-Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Cured-In-Place Lining Method | No Measure | N/A | No Measure | No Measure | N/A | |||
1/24/14 | S-869 | Central District Wastewater Treatment Plant Industrial Waste Deep injection Well System | No Measure | N/A | No Measure | No Measure | N/A | |||
1/21/14 | RPQ P0130 | One Year Countywide Contract for Rehabilitation of Sanitary Sewer by the Cured-In-Place Pipe Lining Method | No Measure | N/A | No Measure | No Measure | N/A | |||
1/7/14 | RPQ No. 20130036 | Virginia Key North Shared-Use Path | Trade Set Aside | N/A | N/A | Trade Set Aside | Trade Set Aside |
This Project is a resubmittal |
||
1/7/14 | 2008-032.04 | Seaboard Marine Cargo Terminal Redevelopment Phase II (4 of 5) | 10.56% CSBE Goal | N/A | N/A |
10.56% CSBE Goal 10.00% CWP Goal |
N/A | |||
12/31/13 | RPQ No. 147475 | Interior and Exterior Renovations at Phyllis Wheatley and Abe Arronovitz | No Measure | N/A | N/A | N/A | No Measure Federal Funds | No Measure - Federal Funds | N/A | |
12/27/13 | RPQ No. 147468 | Little River Terrace VCA-UFAS Renovations | No Measure | N/A | N/A | N/A | No Measure- Federal Funds | No Measure - Federal Funds | N/A | |
12/26/13 | RPQ No.20130219 | Safe Route to Schools Locations, Phase 9 FMs# 431505-1 | 24.77% DBE Goal | N/A | N/A | No Measure - Federal Funds | No Measure - Federal Funds | N/A | ||
12/20/13 | RPQ No. 20130278 | Old Cutler Road Bike Path Phase II | 8.6% DBE Goal | N/A | N/A | N/A | No Measure-Federal Funds | No Measure - Federal Funds | N/A | |
12/18/13 | ITB 13-11571-JE | Park Plaza West Garages Mixed Retail Phase 2 | 23.11% CSBE Goal | N/A |
23.11% CSBE Goal 25.20% CWP Goal |
N/A | ||||
12/17/13 | 503204-05-001 | West Perrine Park – Family Aquatic Center | 17.92% CSBE Goal | N/A |
17.93% CSBE Goal 10% CWP Goal |
N/A | ||||
12/10/13 | 592500-12-001 | Zoo Miami Amphitheater Canopy | 5.84% CSBE Goal | N/A | N/A | 5.84% CSBE Goal | 5.84% CSBE Goal | N/A | ||
12/2/13 | 20130202 | People’s Transportation Plan (PTP) Roadway Improvements for NW 74th Street from NW 87th Avenue to SR-826, FM #414731-5 | 11% DBE Goal | N/A | N/A | N/A | 11% DBE Goal | 11% DBE Goal | N/A | |
12/2/13 | 20130272 | Push Button Contract for Traffic Signal Improvements | Trade Set-Aside | N/A | N/A | Trade Set Aside 10% CWP Goal | Trade Set Aside 10% CWP Goal | N/A | ||
11/25/13 | Z000108-PG GOB ESP | Animal Services Multi-Purpose Facility | 30% CSBE Goal | N/A | N/A | N/A | 29.89% CSBE Goal | 29.89% CSBE Goal | N/A | |
11/20/13 | RPQ No. 20130036 | Virginia Key North Shared-Use Path | Trade Set-Aside | N/A | N/A | Trade Set-Aside | Trade Set-Aside | |||
11/20/13 | RPQ No. 148257 | Robert King High IT Central Office Building | No Measure – Federal Funds | N/A | N/A | N/A | No Measure -Federal Funds | No Measure-Federal Funds | N/A | |
11/18/13 | 213001-11-001 GOB ESP | Amelia Earhart Soccer Complex Phase 1 | 18.77% CSBE Goal | N/A | N/A |
23.17% CSBE Goal 10% CWP Goal |
N/A | |||
11/14/13 | 144016 | Boiler Inspections, Preventive Maintenance, Replacements & Repairs | No Measure – Federal Funds | N/A | N/A | N/A | No Measure – Federal Funds | No Measure – Federal Funds |
||
11/12/13 | RPQ No. FMB 25188 | Boiler Service, Repairs and Replacements for MDCR | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
10/30/13 | 20130244 | Push-Button Contract for Roadway Resurfacing | Trade Set-Aside | N/A | N/A | N/A |
Trade Set-Aside 2 Trade Set Aside 1 10% CWP Goal |
N/A | ||
10/25/13 | MCC-S-103-A | MIA-Relocation of Runway 8L Localizer Shelter | Trade Set-Aside | N/A | N/A | Trade Set-Aside | Trade Set-Aside | N/A | ||
10/22/13 | RQID1400013 | Service for Electrical and Mechanical Security Gates for Miami Dade Public Housing & Community Development | No Measure | N/A | N/A | N/A | No Measure-Federal Funding | No Measure - Federal Funding | N/A | |
10/17/13 | T-153A TAC-N | LAN Cargo Aircraft Maintenance Hangar | 20% CSBE Goal | N/A | N/A |
20% CSBE Goal 10% CWP Goal |
N/A | |||
10/16/13 | RPQ No. 146526 | Smathers Plaza UFAS | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure (Federal Funds) | N/A | |
9/23/13 | 2009-043 | Construction Contract Services for Area 2 (Bays 177-183) Construction of Seawall | 7.96 CSBE Goal | N/A | N/A | TBD | 7.23% CSBE Goal 10% CWP Goal | N/A | ||
9/16/13 | CDJPA-2013.01 | JPA Between Miami-Dade County and the City of Doral NW 97th Avenue from NW 70th Street to NW 74th Street | 17% CSBE Goal | N/A | N/A | 19.75% CSBE Goal | 19.75% CSBE Goal | N/A | ||
8/28/13 | M2012-018.04 | Asbestos Abatement Services – 1015 Administration Building | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
8/19/13 | ITB 13-11261-KG | Park Plaza East Main Corridor Modernization Project | 25.38% CSBE Goal | N/A | N/A | 25.66% CSBE Goal & 25.60% CWP Goal | 25.66% CSBE Goal & 25.60% CWP Goal | N/A | ||
8/16/13 | RPQ No. 20130208 | WASD Roadway Resurfacing Contract | Trade Set-Aside | N/A | N/A | 2 Trade Set-Asides | 2 Trade Set- Asides | N/A | ||
8/14/13 | M2013-014 | Paving Improvements (Portwide) | Trade Set-Aside | N/A | N/A | Trade Set-Aside | Trade Set-Aside | N/A | ||
8/14/13 | W70308/Z00051-PG GOB ESP | Joseph Caleb Center (JCC), New Parking Garage | 24.7% CSBE Goal | N/A | N/A | N/A | Level 3 Set-Aside 100% CSBE Goal & 25.10% CWP Goal | Level 3 Set-Aside - 100% CSBE Goal & 25.10% CWP Goal | N/A | |
8/8/13 | RPQ 144789 | Stairs Replacement | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure (Federal Funds) | N/A | |
8/7/13 | 20120004 | People’s Transportation Plan (PTP) Roadway Improvements to NW 74th St. from NW 114th Ave. to NW 107th Ave., FM #414731-3 | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/5/13 | PR07011301 | Repair and Resurfacing of Perrine Senior Center Parking Lot | No Measure (Federal Funds) | N/A | N/A | No Measure (Federal Funds) | No Measure – Federal Funds |
N/A | ||
8/5/13 | SA07161301 | Portable Classroom Demolition and Site Restoration | No Measure (Federal Funds) | N/A | N/A | No Measure (Federal Funds) | No Measure – Federal Funds |
N/A | ||
8/5/13 | 20130001 | Safe Route to Schools Locations, Phase 8 FMs# 431498-1, 431504-1 | 33% DBE Goal | N/A | N/A | N/A | 33% DBE Goal | 33% DBE Goal | N/A | |
8/2/13 | 20120156 | Safe Route to Schools Locations, Phase 8 FMs# 425855-1, 425857-1 | 28% DBE Goal | N/A | N/A | N/A | 28% DBE Goal | 28% DBE Goal | N/A | |
7/25/13 | W120120-R | Repair Sewer Lines – Cure-in-Place Pipe Lining | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/18/13 | CMJPA-2013.01 | JPA between Miami-Dade County and the City of Miami, Coconut Grove Sidewalk Improvements | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/12/13 | RPQ No. 20130169 | Push Button Contract for Roadway Resurfacing | Trade Set-Aside | N/A | N/A | N/A | 2 CSBE Trade Set-Asides and CWP – Work Order Driven |
2 CSBE Trade Set-Asides and CWP – Work Order Driven |
N/A | |
6/26/13 | RPQ No. 20130163 | Drainage Improvement Project Multiple Sites | Trade Set-Aside | N/A | N/A | N/A |
Trade Set-Aside 1 and 2 13.43% CWP |
N/A | ||
6/26/13 | CHJPA-2013.01 | JPA between Miami-Dade County and the City of Hialeah W. 24th Ave. from W. 60th St. to W. 76th St. | 11% CSBE Goal | N/A | N/A | N/A | 11% CSBE Goal | 11% CSBE Goal | N/A | |
6/26/13 | CHJPA-2013.02 | JPA between Miami-Dade County and the City of Hialeah W. 76th St. from W. 36th Ave. to W. 20th Ave. | 12% CSBE Goal | N/A | N/A | N/A | 12% CSBE Goal | 12% CSBE Goal | N/A | |
6/25/13 | RPQ No. 20130144 | Improvements to the Miami Avenue Bridge over the Miami River | Trade Set Aside | N/A | N/A | N/A |
Trade Set-Aside 15.20% CWP |
N/A | ||
6/21/13 | ITB-13-11096-SR | JMH Modernization of NICU B, C, & Intermediate Units | 24% CSBE Goal | N/A | N/A | 23.90% CSBE goal & 25.20% CWP goal | 23.90% CSBE goal & 25.20% CWP goal | N/A | ||
6/21/13 | RPQ P0125 | Asbestos Removal at Hialeah Maintenance Building, 800 West 3 Ave., Hialeah | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/18/13 | ITB-13-11118-SE | Ryder Trauma Exterior Hardening Project | 18% CSBE Goal | N/A | N/A |
18% CSBE Goal 25.20% CWP |
N/A | |||
6/11/13 | RPQ No. 141598 | General Building Repair (Mailbox) Repair – Rainbow Village for Miami Dade Public Housing and Community Development | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure - Federal Funds | N/A | |
6/7/13 | RQAV1300011 | Precision Cooling Systems, Maintenance and Repairs | Bid Preference | N/A | N/A |
No Measure 10% CWP |
N/A | |||
6/6/13 | MCC-D-105-C | MIA-Dolphin & Flamingo Parking Garages Structural Repairs | Trade Set-Aside | N/A | N/A | Trade Set-Aside and 10%CWP goal | Trade Set-Aside and 10%CWp goal | N/A | ||
6/3/13 | ITB-12-10521-SR | UC Emergency Power Upgrades Main Campus – Power Monitoring System Construction | No Measure | N/A | N/A | N/A |
No Measure 25.20% CWP Goal |
N/A | ||
5/31/13 | ITB 13-11134-JE | Jackson North Medical Center (JNMC) Utility Center Mechanical Upgrades | 21.2% CSBE Goal | N/A | N/A | 21.20% CSBE Goal | 21.20% CSBE Goal | N/A | ||
5/30/13 | RPQ No. 20130147 | Roadway Resurfacing Contract | Trade Set-Aside | N/A | N/A | N/A |
CSBE Trade Set Aside 1 & 2 11.53% CWP Goals |
N/A | ||
5/29/13 | ITB 13-10748-KG | JMH Campus-Wide Air Handler Unit (AHU) Replacements | 12.2% CSBE Goal | N/A | N/A | 21.3% CSBE Goal | 21.3% CSBE Goal | N/A | ||
5/17/13 | RPQ No. 94080-B | Gwen Cherry Park Gym Floor Replacement | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/9/13 | RPQ No. P0120 | Alex Orr Plant New Switchgear Building | 16.9% CSBE Goal | N/A | 16.86% CSBE Goal | 16.86% CSBE Goal | N/A | |||
5/6/13 | MCC-O-043-A | MIA-Building 861, 862, & 863 Phase 2 Construction | Trade Set-Aside | N/A | N/A | N/A | Trade Set-Aside | Trade Set-Aside | N/A | |
5/1/13 | 123203-13-002 | Ives Dairy Estates District Park – Multipurpose Synthetic Field and Scoreboard | 4.5% CSBE Goal | N/A | N/A | 4.50% CSBE Goal | 4.50% CSBE Goal | N/A | ||
4/29/13 | RPQ No. 20131234 | Florida City Canal Improvement Project | 23.71% | N/A | N/A | N/A | 24.45% CSBE Goal | 24.45% CSBE Goal | N/A | |
4/29/13 | RPQ No. P0119 | Asbestos Removal at Distribution Office | No Measure – Insufficient Availability | N/A | N/A | N/A | No Measure – Insufficient Availability | No Measure – Insufficient Availability | N/A | |
4/26/13 | RPQ No. P0117 |
Emergency Asbestos Clean-Up at Records Center |
No Measure – Insufficient Availability | N/A | N/A | N/A | No Measure – Insufficient Availability | No Measure – Insufficient Availability | N/A | |
4/24/13 | RPQ No. 141610 | Wynwood Elderly – UFAS Improvements | No Measure – Federal Funds | N/A | N/A | N/A | No Measure – Federal Funds | No Measure – Federal Funds | N/A | |
4/23/13 | RQID1300114 | Roll-Up Doors: Inspection, Repair, Furnish & Installation Services | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
4/23/13 | RPQ No. 92551 | Gwen Cherry Park Baseball Lighting Upgrade | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure | N/A | |
4/17/13 | RPQ No. 141572 | New Haven 05 UFAS | No Measure – Federal Funds | N/A | N/A | N/A | No Measure – Federal Funds | No Measure-Federal Funds | N/A | |
4/17/13 | RPQ No. MDFRD-446-64-B | MDFR Miami Lakes Fire Station 64 | 20.5% CSBE Goal | N/A | 24.62% CSBE Goal | 24.62% CSBE Goal | N/A | |||
4/17/13 | RPQ No. MDFRD-445-70-B | MDFR Coconut Palm Fire Station 70 | 22.9% CSBE Goal | N/A | 24.13% CSBE Goal | 24.13% CSBE Goal | N/A | |||
4/17/13 | RPQ No. 20130036 | Virginia Key North Shared-Use Path | Trade Set-Aside | N/A | Trade Set Aside | Trade Set Aside | N/A | |||
4/16/13 | RPQ No. 139508 | Smathers Plaza UFAS Ramps | No Measure – Federal Funds | N/A | N/A | N/A | No Measure – Federal Funds | No Measure- Federal Funds | N/A | |
4/12/13 | FL 5-057/RPQ 141328 | Helen Sawyer Housing for the Elderly Re-Roofing | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure-Federal Funds | N/A | |
4/11/13 | RPQ No. 139898 | Vacancy Preparation and Miscellaneous Work – Work Order Contract | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure-Federal Funds | N/A | |
4/11/13 | RPQ No. 139897 | Vacancy Preparation and Miscellaneous Work – Work Order Contract | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure-Federal Funds | N/A | |
4/11/13 | RPQ No. 139896 | Vacancy Preparation and Miscellaneous Work – Work Order Contract | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure-Federal Funds | N/A | |
4/11/13 | RPQ No. 139895 | Vacancy Preparation and Miscellaneous Work – Work Order Contract | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure-Federal Funds | N/A | |
4/11/13 | RPQ No. 139893 | Vacancy Preparation and Miscellaneous Work – Work Order Contract | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure- Federal Funds | N/A | |
4/11/13 | RPQ No. 139885 | Vacancy Preparation and Miscellaneous Work – Work Order Contract | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure-Federal Funds | N/A | |
4/9/13 | S-852 | Master Pump Station No. 3 | 2.6% CSBE Goal | N/A | 2.59% CSBE Goal | 2.59% CSBE Goal | N/A | |||
4/8/13 | 320801-10-003 | Pelican Marina – Utilities Replacement | 6.8% CSBE Goal | N/A | N/A | 7.01% CSBE Goal | 7.01% CSBE Goal | N/A | ||
4/5/13 | 20130019 | Street Light Maintenance | No Measure | N/A | N/A | N/A |
No Measure 13.51% CWP Goal |
N/A | ||
4/4/13 | E08-DERM-01-029-AMEC | Limited Phase 2 Assessment at the ISD Vacant Lot, located at NW 37 Ave. and NW 183 St., on behalf of the Miami-Dade County Regulatory and Economic Resources (RER) | No Measure | N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/3/13 | RPQ No. 20130018 | Street Light Maintenance | No Measure | N/A | N/A | N/A |
No Measure 20.01% CWP Goal |
N/A | ||
3/29/13 | TCBJPA-2008.02 | Joint Participation Agreement (JPA) between Miami-Dade County and the Town of Cutler Bay Caribbean Boulevard from Coral Sea Road to SW 87th Avenue | 22% CSBE Goal | N/A | N/A | 21.67% CSBE Goal | 21.67% CSBE Goal | N/A | ||
3/28/13 | 20130055 | Water and Sewer Department (WASD) Street Rehabilitation Contract | Trade Set-Aside | N/A | N/A | Trade Set-Aside and CWP Work Order Driven | Trade Set-Aside and CWP Work Order Driven | N/A | ||
3/13/13 | RQID1300085 | Air Conditioning (A/C) Duct Cleaning Services - Prequalification | None | N/A | N/A | TBD | TBD | N/A | ||
3/12/13 | 490601-10-001 GOB | Trail Glades Range – Entrance Culvert Replacement | 7.68% CSBE Goal | 7.68% CSBE Goal | 7.68% CSBE Goal | N/A | ||||
3/11/13 | RPQ No. 20120162 | Drainage Improvement Project for Multiple Sites | 2 CSBE Trade Set-Aside and CWP Work Order Driven | N/A | 2 CSBE Trade Set-Aside and CWP Work Order Driven | 2 CSBE Trade Set-Asides and CWP Work Order Driven | N/A | |||
3/5/13 | S131375 | Repair Damaged Fence and Gate | No Measure – Federal Funds | N/A | N/A | N/A | No Measure – Federal Funds | Under Review | N/A | |
2/26/13 | W-926 | One-Year Countywide Contract for Restoration of Sidewalk, Curb, Gutters and Driveways with County Option to Renew for an Additional Two Years on a Yearly Basis | CSBE Set-Aside | N/A | N/A | Under Review | Under Review | Under Review | N/A | |
2/25/13 | RPQ P0068 | Preston Water Treatment Plant Water Softening Tank Coat | No Measure | N/A | N/A | Under Review | Under Review | N/A | ||
2/20/13 | RQID1300072 | Roll-Up Doors: Inspection, Repair, Furnish & Installation Services | CSBE Set-Aside | N/A | N/A | N/A | ||||
2/12/13 | MCC-B-313-A | MIA-South Terminal 6th Floor Mechanical Room 5K502 Existing Modification | Trade Set-Aside | N/A | N/A | Trade Set-Aside | Under Review | N/A | ||
2/12/13 | MCC-N-165-C | MIA-Building 896 40 Year Re-Certification | Trade Set-Aside | N/A | N/A | Trade Set-Aside | Under Review | N/A | ||
2/6/13 | MCC-779y | MIA-NTD FIS Re-Check Concourse Level | Trade Set-Aside | N/A | N/A | Trade Set-Aside | Under Review | N/A | ||
2/6/13 | RPQ P0111 | Asbestos Panels Pressure Wash at 3575 S. LeJeune Rd. | No Measure | N/A | N/A | No Measure | Under Review | N/A | ||
2/5/13 | RPQ No. 20120126 | Improvements to Pine Tree Drive Bridge over the Flamingo Waterway, Phase II | No Measure | N/A | N/A | No Measure | Under Review | N/A | ||
1/22/13 | MCC-R-107-A | MIA – Midfield Fire Station | Trade Set-Aside | N/A | N/A | Trade Set-Aside | Under Review | N/A | ||
1/22/13 | s130843 | Replace Kitchen Window Pane – NSP Home | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | Under Review | N/A | |
1/11/13 | E09-DERM-01-005R1-CEI | Waste Water Treatment System Installation at the Central, Northeast and Coral Way Bus Facilities: located at 3300 NW 32 Ave, 2775 SW 74 Ave, and 360 NE 185 St., Respectively, On Behalf of Miami-Dade Transit (MDT) | 2.1% CSBE Goal | N/A | N/A | Under Review | Under Review | N/A | ||
1/11/13 | SA01071301 | Portable Classroom Demolishing and Site Restoration | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | Under Review | N/A | |
1/11/13 | SA01071302 | Asbestos Abatement Building # 3 Perrine Community Enrichment Center | No Measure | N/A | N/A | No Measure | Under Review | N/A | ||
1/11/13 | MCC-HG-001-13 | Public Shoreline Stabilization of the Northeast Garden Area | No Measure | N/A | No Measure | Under Review | N/A | |||
1/10/13 | H024B-3 | MIA Runway 12/30 Pavement Rehabilitation and New Air Cargo Apron | 10.1% DBE Goal | N/A | N/A | N/A | 10.1% DBE Goal and 10% CWP Goal | Under Review | N/A | |
1/7/13 | MCC-TAC-R Project No. S-104-A (Lease No. C-7545) | El Dorado Furniture Corporation | 8% CSBE Goal | N/A | Under Review | Under Review | Under Review | N/A | ||
1/3/13 | ITB 12-10748-KG | JMH Campus-wide Air Handler Unit (AHU) Replacements | No Measure | N/A | Under Review | Under Review | N/A | |||
12/26/12 | RPQ No. 138481 | Replacement of 65 LF of Sewer Lines | No Measure – Federally Funded | N/A | N/A | N/A | No Measure – Federally Funded | No Measure – Federally Funded | N/A | |
12/24/12 | MCC-R-044-A | MIA – Hotel Lobby/Public Space Renovations | Trade Set-Aside | N/A | N/A | Under Review | Under Review | N/A | ||
12/21/12 | 592500-12-001 | Miami Metro Zoo – Amphitheatre Canopy | 4.08% CSBE Goal | Under Review | Under Review | N/A | ||||
12/21/12 | E08-DERM-01-016R3-CEI | Source Removal, Monitoring Well Installation and Sampling for the North County Neighborhood Service Center, located at 3201 NW 207 St., on behalf of the Miami-Dade Department of Community Action and Human Services (CAHS) | No Measure | N/A | Under Review | Under Review | Under Review | N/A | ||
12/03/12 | W110046 | Frankie Shannon Rolle – Renovate Five (5) Restrooms, 3750 South Dixie Highway | No Measure – Federal Funds | N/A | N/A | N/A | No Measure – Federal Funds | Under Review | N/A | |
12/03/12 | W110045 | Edison Neighborhood Services Center – Renovate Four (4) Restrooms, 150 NW 79th Street | No Measure – Federal Funds | N/A | N/A | N/A | No Measure – Federal Funds | Under Review | N/A | |
12/03/12 | W120120 | Repair Sewer Lines – Cure-in-Place Pipe Lining | No Measure | N/A | N/A | Under Review | Under Review | Under Review | N/A | |
12/3/12 | ITB-12-10521-SR | Jackson Memorial Hospital Utility Center Emergency Power Upgrades | No Measure | N/A | N/A | Under Review | Under Review | Under Review | N/A | |
11/19/12 | RPQ No. 20120127 | People’s Transportation Plan (PTP) Roadway Improvements on SW 17 Avenue from S. Dixie Highway to W. Flagler Street | Trade Set-Aside | N/A | N/A | Under Review | Under Review | 2 Trade Set-Asides and a 21.8% CWP Goal | N/A | |
11/15/12 | ITB-12-10698-JE | Replacement of Medium Voltage Oil Switches & Emergency Gears @ North Wing & DTC Power Plant # 2 – Phase 1 | 2% CSBE Goal | N/A | N/A | Under Review | Under Review | Under Review | N/A | |
11/15/12 | RPQ No. 1202-228976 | Greenway Bridges, Bridge A Black Creek Trail and Bridge B – Biscayne Trail | 3% CSBE Goal | N/A | Under Review | Under Review | Under Review | N/A | ||
11/08/12 | 600712-06-001 GOB | Greenway Bridges, Bridge A Black Creek Trail and Bridge B – Biscayne Trail | 8.6% DBE Goal | N/A | N/A | N/A | 8.6% DBE Goal | 8.6% DBE Goal | N/A | |
11/08/12 | W120139 | MDPD Communication Bureau – Target Hardening – Installing Chain Link Fences | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure (Federal Funds) | N/A | |
11/07/12 | W120100-R | Medical Examiner Glass Pipe Repairs | No Measure | N/A | Under Review | Under Review | Under Review | N/A | ||
10/26/12 | RPQ No. 20120116 | People’s Transportation Plan (PTP) Roadway Resurfacing Contract | Trade Set-Aside | N/A | Under Review | Under Review | Under Review | N/A | ||
10/25/12 | RPQ P0086 | Mechanical Integrity Testing (MIT), Repair IW-13 Thru IW-17 SDWWTP IW-4N NDWWTP | No Measure | N/A | N/A | Under Review | Under Review | N/A | ||
10/23/12 | 20120678 | People’s Transportation Plan (PTP) Roadway Improvements along SW 157th Avenue from SW 184th Street to SW 152nd Street | 18.3 CSBE Goal | N/A | N/A | Under Review | Under Review | N/A | ||
10/19/12 | E08-DERM-01-006R2-CEI | Empty Lot South of NW 135 St. at the Opa-Locka Executive Airport, Site Fencing the Miami-Dade County Aviation Department | 15.46% CSBE Goal | N/A | Under Review | Under Review | 15.46% CSBE Goal | N/A | ||
10/18/12 | RPQ No. 20120102 | CDBG Sidewalk Improvements | 5% DBE Goal | N/A | N/A | N/A | 5% DBE Goal | 5% DBE Goal | N/A | |
10/15/12 | RPQ P0098 | Sewer Structures Corrosion Rehabilitation | No Measure | N/A | Under Review | 21.8% CWP Goal | N/A | |||
10/15/12 | RPQ 136173 | PHCD – Sewer Line Replacement | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure (Federal Funds) | N/A | |
10/03/12 | RPQ No. 20120110 | People’s Transportation Plan (PTP) Roadway Resurfacing Contract | Trade Set-Aside | N/A | N/A | Trade Set-Aside | 2 Trade Set-Asides and 10% CWP Goal | N/A | ||
10/02/12 | RPQ P0082 | South District Wastewater Treatment Plant Screening Systems Improvements for Plants 1 & 2 | 5.5% CSBE Goal & 11.8% CWP Goal | N/A | N/A | N/A | Under Review | 5.51% CSBE goal and 11.8% CWP Goal | N/A | |
10/02/12 | 20120032 | People’s Transportation Plan (PTP) Roadway Improvements to SW 27th Avenue from Tigertail Avenue to SW 28th Terrace | 25% CSBE | N/A | N/A | Under Review | 25% CSBE Goal | N/A | ||
10/02/12 | W100158 | NSP Rehabilitation – 13985 SW 276 Way | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure (Federal Funds) | N/A | |
10/02/12 | W100154 | NSP Rehabilitation – 16545 SW 144 Court | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure (Federal Funds) | N/A | |
09/28/12 | RQID1200141 | Neon Signs / Lighting Systems Inspection, Maintenance & Repairs | Bid Preference | N/A | N/A | No Measure: Group A Set-Aside: Group B | No Measure: Group A Set-Aside: Group B | N/A | ||
09/26/12 | RQID1200119 | Cleaning Blood Borne Pathogens/Pathological Waste | Bid Preference | N/A | N/A | N/A | Bid Preference | Bid Preference | N/A | |
09/25/12 | RQID1200086 | Plastic Laminates (High Pressure) Furnish and Deliver | Bid Preference | N/A | N/A | TBD | TBD | N/A | ||
09/18/12 | ITB-MDAD-04-12 (Construction) | Invitation to Bid – Satellite E APM Replacement and O&M Services Project Phases 1 and 2 | 12.69% CBE Goal | N/A | N/A | 12.77% CSBE Goal10% CWP Goal | 12.77% CSBE Goal10% CWP Goal | N/A | ||
09/17/12 | RQWS1200024 | Swimming Pool Covers | No Measure | N/A | N/A | N/A | No Measure - Emergency | No Measure - Emergency | N/A | |
05/24/12 | W100156 | NSP 16961 SW 298th St., Miami, FL 33125 | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure (Federal Funds) | No Measure (Federal Funds) | ||
05/14/12 | RPQ No. MDFRD-UASI-HQ2R | Install and Motorizing of HQ Gates | No Measure (Federal Funds) |
N/A |
N/A |
N/A |
No Measure (Federal Funds) | No Measure (Federal Funds) | ||
05/11/12 | RPQ P0078 | Perrine-Cutler Ridge Water & Sewer Improvements, Water Main, Gravity Sewer and Force Main for Basin C | No Measure |
N/A |
N/A |
Under Review | Under Review | No Measure (Federal Funds) | ||
05/10/12 | MCC-P-046-A | Repairs & Modification of Central Chiller Plant East & Central Terminal HVAC | 15% DBE Goal |
N/A |
N/A |
N/A |
Under Review | Under Review | ||
05/10/12 | RPQ No. PER-SLB-123 | Slab Covered Trench Cleaning and Repair Along Coral Way (SR 972 between S.W. 19th Avenue and S.W. 22nd Avenue) | No Measure |
N/A |
Under Review | Under Review | ||||
05/08/12 | RFQ-12-10491-JE | West Wing Basement Pharmacy Room Phase II Carousels | 29% CSBE Goal |
N/A |
Under Review | Under Review | ||||
05/01/12 | RPQ No. 128009 (7360) | Gwen Cherry, Site 13 & 15 Gutters and Down Spouts System | No Measure (Federally Funded) |
N/A |
N/A |
N/A |
No Measure (Federally Funded) | No Measure | ||
04/24/12 |
RPQ No. 20110191 |
Improvements to SW 147th Avenue from SW 26th Street to SW 10th Street |
19.69% CSBE Goal |
|
Under Review |
Under Review |
Under Review |
|
||
04/24/12 |
RPQ No. 20120038 |
People’s Transportation Plan (PTP) Roadway Resurfacing Contract |
Trade Set-Asides |
|
Under Review |
Under Review |
Trade Set-Aside 10% CWP Goal |
|
||
04/24/12 |
RPQ No. 20120029 |
Miami River Greenways |
26% CSBE Goal |
|
Under Review |
Under Review |
Under Review |
|
||
04/19/12 |
RFP No. MDAD-06-11 |
Baggage Handling Systems at MIA |
15.3% CSBE Goal |
|
N/A |
15.37% CSBE Goal |
Pending Signature |
|
||
04/18/12 |
E08-DERM-01-017R2-CEI |
MDAD-Building 100-Location J at the Miami International Airport, Source Removal |
No Measure |
|
N/A |
No Measure |
Pending Signature |
|
||
04/18/12 |
RM-6-12/15 |
Pavement Repairs |
15.06% CSBE Goal |
|
N/A |
15.06% CSBE Goal |
|
|||
04/17/12 |
RPQ 129771 |
Lightning Protection at Three Round Tower, Stirrup Plaza and South Miami Plaza |
No Measure (Federal Funds) |
N/A |
|
N/A |
No Measure (Federal Funds) |
|
||
04/16/12 |
RPQ 128667 |
Naranja Site Improvements |
No Measure (Federal Funds) |
N/A |
|
N/A |
No Measure (Federal Funds) |
|
||
04/06/12 |
RQCO1200004 |
Emergency/Allocation HVAC Contract Services |
No Measure |
N/A |
N/A |
N/A |
No Measure-Emergency |
|
||
04/05/12 |
20090317 |
JPA Between Miami-Dade County and The City of Miami Drainage Improvements Along South Miami Avenue |
No Measure |
N/A |
No Measure |
|
||||
03/28/12 |
W70308/Z00051 GOB ESP |
Renovation of the Joseph Caleb Center (JCC), New Courthouse Annex/Additions, and New Parking Garage |
21% CSBE Goal |
N/A |
24.70% CSBE Goal |
|
||||
03/26/12 |
IRP090 |
Metromover Station Lighting Refurbishment – Phase 2: College/Bayside, College North, and Tenth Street |
No Measure (Federally Funded) |
N/A |
N/A |
No Measure (Federally Funded) |
|
|||
03/23/12 |
20120007 |
Water and Sewer Department (WASD) Street Rehabilitation Contract |
Trade Set-Aside |
N/A |
N/A |
Trade Set-Aside |
|
|||
03/22/12 |
402202-05-005 GOB ESP |
Tropical Park – Equestrian Complex |
20.08% CSBE Goal |
N/A |
N/A |
20.73% CSBE Goal |
|
|||
03/22/12 |
20120008 |
Water and Sewer Department (WASD) Street Rehabilitation Contract |
Trade Set-Aside |
N/A |
N/A |
Trade Set-Aside |
|
|||
03/22/12 |
Z00018 GOB-C |
Pre-Trial Detention Center Renovation and Expansion |
15% CSBE Goal |
|
||||||
03/21/12 |
20120023 |
CDBG West Little River Driveways |
No Measure (Federally Funded) |
N/A |
N/A |
N/A |
No Measure (Federally Funded) |
|
||
03/20/12 |
20120028 |
People’s Transportation Plan (PTP) Traffic Signal Intersections |
1.67% CSBE |
N/A |
|
|||||
03/20/12 |
ITB 12-10457 |
Jackson Memorial Hospital RFP – Campus Wide Fire Sprinkler Upgrade Project |
13.4% |
|
||||||
03/15/12 |
P0079 |
Replacement of Refractory Bricks in the Existing Kiln at Lime Plant #2 |
No Measure |
N/A |
Level 1 Set-Aside |
|
||||
03/12/12 |
20110197 |
Goulds NRSA Drainage/Sidewalk (CDBG) and Model City Sidewalk (CDBG-R) Improvement Project |
|
28% DBE Goal |
N/A |
N/A |
N/A |
28% DBE Goal |
28% DBE Goal |
|
03/05/12 | 20120004 | People’s Transportation Plan (PTP) Roadway Improvements to NW 74th Street From NW 114th Avenue to NW 107th Avenue | 13% DBE Goal |
N/A |
N/A |
N/A |
13% DBE Goa | 13% DBE Goa | ||
02/29/12 |
RPQ No. 126594 (7360) |
Ward Towers/ALF UFAS Renovations |
No Measure (Federally Funded) |
N/A |
N/A |
N/A |
No Measure (Federally Funded) |
|
||
02/29/12 |
RPQ No. 86760 (7360) |
Kendall Soccer Park Artificial Turf Replacement |
No Measure |
N/A |
N/A |
N/A |
No Measure |
|
||
02/17/12 |
20110194 |
People’s Transportation Plan Roadway Improvements NW 87 Ave. From NW 154 St. to NW 186 St. |
22% CSBE Goal |
N/A |
N/A |
22.57% CSBE Goal |
|
|||
02/15/12 |
20100678 |
People’s Transportation Plan Roadway Improvements Along SW 157 Ave. From SW 184 St. to 152 St. |
19% CSBE Goal |
N/A |
N/A |
19.82% CSBE Goal |
|
|||
02/13/12 |
R-126-A |
MIA Jet Fuel Storage Facility New Fire Hydrant System Pump Stations |
No Measure -Emergency |
N/A |
N/A |
No Measure (Emergency) |
|
|||
02/09/12 |
RPQ No. 91656 |
Goulds Park Gymnasium Roof Replacement |
No Measure (Federally Funded) |
N/A |
N/A |
N/A |
No Measure (Federally Funded) |
|
||
02/08/12 |
RPQ No. 20120009 |
Community Development Block Grant (CDBG) Roadway Resurfacing Project Floral Park 1 and 3A |
10% DBE Goal |
N/A |
N/A |
N/A |
10% DBE Goal |
|
||
01/30/12 |
422801-06-007-GOB-ESP |
Crandon Park Marina – Entrance, Parking and Dock Security Gates |
|
30% CSBE Goal |
Under Review |
|
Under Review |
Under Review |
|
|
01/20/12 |
H00441-R3 |
Roof Tile Replacement at Cultural Center, MAM, FHM, and Other Adjacent Buildings |
No Measure (Federal Funds) |
N/A |
|
N/A |
No Measure – Federal Funds |
|
||
01/20/12 |
E08-DERM-01-008R1-AMEC |
MDAD Building 147 at Opa-Locka Executive Airport, Source Removal |
No Measure |
|
No Measure |
|
||||
01/19/12 |
RPQ No. P0077 |
Furnish & Install 48-Inch Valves and Manholes in N.W. 135 St. |
No Measure |
N/A |
Under Review |
No Measure/10.2% CWP Goal |
|
|||
01/18/12 |
RQPM1100186 |
A/C Chiller for Building 33 MDAD |
TBD |
N/A |
|
TBD |
TBD |
Under Review |
N/A |
|
01/11/12 |
RPQ No. 125125 |
PCHD Robert King High Development |
No Measure-Federally Funded |
N/A |
|
N/A |
No Measure-Federal Funds |
|
||
01/06/12 |
RQPM1200037 |
LED Signs Inspection, Maintenance, Repair Services and Parts |
Bid Preference |
N/A |
|
N/A |
No Measure |
Resubmittal |
You are now leaving the official website of Miami-Dade County government. Please be aware that when you exit this site, you are no longer protected by our privacy or security policies. Miami-Dade County is not responsible for the content provided on linked sites. The provision of links to these external sites does not constitute an endorsement.
Please click 'OK' to be sent to the new site, or Click 'Cancel' to go back.