Hurricane Irma
As we continue our recovery and cleanup efforts, please visit the Emergency website for the latest information on openings and closings in Miami-Dade County.
Architectural & Engineering / CBE
Listed below are Architectural & Engineering projects and the status of the review for small business measures. A Verification of Availability form is available below (when applicable) and may be submitted any time prior to the posting of the SBD Final Recommendation. Simply download form accompanying the applicable project and return as instructed. Additionally, comments on any project may be sent to [email protected]. SBD reviews all comments and may use information when making goal recommendations as applicable.
Date Received | Project Number | Project Title | Project Package | Dept. RCMD | SBD Project Breakout |
Additional Information |
Verification of Availability |
SBD Analysis & RCMDs |
SBD Final RCMD |
Comments |
5/28/24 | E24AV01 | MDAD Building Recertification Program | SBE/A&E - 20% Goal | N/A | N/A | N/A | 20% Goal - SBE/A&E | 20% SBE-A&E goal | N/A | |
5/17/24 | E24RE03 | Environmental Cleanup, Compliance and Related Services for Department of Transporation and Public Works (DTPW) and other County Departments utilizing People’s Transportation Plan (PTP) Funds |
SBE/A&E - 10% Goal | N/A | N/A | N/A | 10% Goal - SBE/A&E | 11.00% SBE/A&E Goal | N/A | |
5/17/24 | E24RE02 | Environmental Cleanup, Compliance and Related Services for Department of Transportation and Public Works (DTPW) and other County Departments utilizing People’s Transportation Plan (PTP) Funds |
SBE/A&E - 10% Goal | N/A | N/A | N/A | 10% Goal - SBE/A&E | Tier I Set Aside | N/A | |
4/23/24 | E23TP05 | General Architectural/Engineering Consultants for a wide range of engineering, surveying, architectural, landscaping, technical, management, and administrative services | SBE/A&E - 20% Goal | N/A | N/A | N/A | 20% Goal - SBE/A&E | 20% SBE-A&E goal | N/A | |
4/12/24 | E23TP08 | Professional Planning, Design, and Engineering services for DTPW Infrastructure Project Management |
DBE - 18-20% Goal | N/A | N/A | N/A | 18-20% Goal - DBE | No Measure | N/A | |
4/11/24 | E23TP07 | Professional Planning, Design, and Engineering services for DTPW Infrastructure Project Management |
SBE/A&E - 17.50% Goal | N/A | N/A | N/A | 17.50% Goal - SBE/A&E | 17.50% SBE/A&E Goal | N/A | |
2/1/24 | E23TP03 | Professional Services Agreements (PSA) to Provide Construction, Engineering and Inspection services (CEI) for DTPW’s Projects |
DBE - 21% Goal | N/A | N/A | N/A | 21% goal - DBE | No Measure | N/A | |
12/11/23 | A23FR01 | Miami-Dade Fire Rescue, Facility Design Services | SBE/A&E - 20% Goal | N/A | N/A | N/A | 20% Goal - SBE/A&E | Under Review | N/A | |
11/27/23 | E23SP01 (2021-042) | Marine Infrastructure Engineering Services | SBE/A&E - 17% Goal | N/A | N/A | N/A | 17% Goal - SBE/A&E | Under Review | N/A | |
11/22/23 | A23PR03 | Request to Advertise for Parks, Recreation and Open Spaces (PROS) for Professional Services Agreement for Ludlam Trail Development | SBE/A&E - 10% Goal | N/A | N/A | 10% Goal - SBE/A&E | Under Review | N/A | ||
11/14/23 | TAC-N CA-164A | MIA - AAR Hangar Expansion Building 850 | SBE/A&E - Under Review | N/A | N/A | N/A | Under Review | Under Review | N/A | |
9/25/23 | LC-RENO-23 | Construction Services for ADA and Interior Upgrades, Roof Replacement, and New Impact Resistant Windows, Doors and Storefront at the Lemon City Branch Library | SBE/A&E - 18.00% Goal | N/A | N/A | N/A | Under Review | Under Review | N/A | |
9/6/23 | E23SW01 | Professional Engineering Services for Dept of Solid Waste Management's South Dade Landfill Cell 4 Closure | SBE/A&E - Under Review | N/A | N/A | Under Review | Under Review | N/A | ||
8/15/23 | TAC-R #CA-074A | AAR Hangar Expansion | Under Review | N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/3/23 | E23AV03 | Miami International Airport (MIA) MIA Sanitary Sewer Consent Decree (CD) Capacity, Management, Operation and Maintenance Program | SBE/A&E - 10% Goal | N/A | N/A | N/A | 10% Goal - SBE/A&E | Under Review | N/A | |
7/21/23 | 2022-010 (under DB23SP01) | Design-Build Services for the New Cruise Terminal G Program | SBE/A&E - 18.00% Goal | N/A | N/A | N/A | 18.00% Goal - SBE/A&E | Under Review | N/A | |
7/19/23 | S-16030 | Upgrade of Pump Station 0300 | SBE/A&E - 2% Goal | N/A | N/A | N/A | 2% Goal - SBE/A&E | Under Review | N/A | |
6/29/23 | A23PR01 | Parks, Recreation and Open Spaces (PROS) for Professional Services Agreement for Pre-Development and Environmental Planning Services Project | SBE/A&E - 6% Goal | N/A | N/A | N/A | 6% Goal - SBE/A&E | Under Review | N/A | |
6/28/23 | TAC-N CA-073A | PS MIA at Bldg. 874 – The Private Suite MIA, LLC, Restoration of Old Pan Am Headquarters |
SBE/A&E -15% Goal | N/A | N/A | N/A | 15% Goal - SBE/A&E | Uner Review | N/A | |
6/26/23 | E23IT01 | Aerial Photograhpy, photogrammetric mapping, topographic, and Light Detection and Ranging (Lidar) | SBE/A&E - Under Review | N/A | N/A | N/A | Under Review | Under Review | N/A | |
6/15/23 | TAC-N-BA-088A |
Aero Miami 1/LATAM Security Camera Update at Bldg. 709 & 710 |
SBE/A&E - 0% Goal | N/A | N/A | N/A | 0% Goal - SBE/A&E | Under Review | N/A | |
6/14/23 | E23TP04 (20230116) | Construction Engineering and Inspection Services for Various Dept of Transportation and Public Works Projects | SBE/A&E - Set-Aside | N/A | N/A | N/A | Set-Aside | Under Review | N/A | |
5/24/23 | A22-PROS-04 | Professional Services Agreement for the Preston B. Bird & Mary Heinlein Fruit and Spice Park Master Plan Improvements Project | SBE/A&E - 16.00% Goal | N/A | N/A | N/A | SBE/A&E - 16.00% Goal | Under Review | N/A | |
3/28/23 | TAC-N-AB-024A |
AA Conversion of Space terminal D 3rd FL btwn Gates D25 and D26 into HUB |
SBE/A&E –17.39% Goal |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/24/23 | A23PR02 |
Professional Services Agreement for Park, Recreation and Open Space Planning Project |
SBE/A&E – 6.00% Goal |
N/A | N/A | N/A | 13.00% SBE/A&E Goal | 13.00% SBE/A&E Goal | N/A | |
3/23/23 | E23PR01 |
Professional Services Agreement for Pre-Development and Environmental Planning Services Project |
SBE/A&E – 6.00% Goal |
N/A | N/A | N/A |
12.00% SBE/A&E Goal |
N/A | ||
3/21/23 | E23WS02 |
Engineering Design and Related Services for Water and Wastewater Infrastructure (Watermains, forcemains, gravity sewers, and water and sewer pump stations) |
SBE/A&E – 10.13% Goal |
N/A | N/A | N/A |
Tier II Set Aside 100% SBE-A&E goal |
N/A | ||
2/21/23 | 2021-042 (E22-SEA-01) |
Marine Infrastructure Engineering Services |
SBE/A&E – 17.00% Goal |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
2/3/23 | TAC-N-AB-081A |
Johnston and Murphy Refurb Project |
SBE/A&E – 0% Goal (Insufficient Availability) |
N/A | N/A | Under Review | Under Review | N/A | ||
1/31/23 | E23TP01 |
Construction, Engineering and Inspection (CEI) Services for The South Dade Bus Maintenance Facility |
SBE/A&E – 20% Goal |
N/A | N/A | 20% SBE-A&E Goal | 20% SBE-A&E Goal | N/A | ||
1/25/23 | DB23-PHCD-01 |
Development of Senior Housing at the Westchester Regional Library Site |
SBE/Cons – 20% Goal |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
1/6/23 | E22-MDAD-04 |
Miami International Airport (MIA) MIA Perimeter Security Hardening – Phase 1 |
SBE/A&E – 16% Goal |
N/A | N/A | 16% SBE-A&E Goal | 16% SBE-A&E Goal | N/A | ||
12/21/22 | TAC-N-AC-130A (AC-130A) |
DHL MIA Hub Bonded holds Mezzanine Expansion at Bldg. 716 |
SBE/A&E – 11.13% Goal |
N/A | N/A | N/A | 11.13% SBE-A&E Goal | 11.13% SBE-A&E Goal | N/A | |
12/21/22 | A23-JHS-01 |
A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Outpatient Pavilion New Construction |
SBE/A&E – 21.0% Goal |
N/A | N/A | 21.00% SBE-A&E Goal | 21.00% SBE-A&E Goal | N/A | ||
12/16/22 | A22-MDPLS-001-GOB-ESP |
Key Biscayne Branch Library |
SBE/A&E – 25% Goal |
N/A | N/A | N/A | 25.00% SBE-A&E Goal | 25.00% SBE-A&E Goal | N/A | |
10/19/22 | TAC-N-AC-034A |
The Rental Car Center – Stormwater Drainage Project |
SBE/A&E – 0.0% Goal |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
10/18/22 | TAC-N-BA-086A |
Aero Miami I LATAM Fire Suppression and updates at Warehouse Bldg. 709 |
SBE/A&E – No Measure |
N/A | N/A | No Measure | No Measure | N/A | ||
10/11/22 | A22-PROS-05 |
Professional Services Agreement for the Crandon Park Master Plan Improvements |
SBE/A&E – 25.00% Goal |
N/A | N/A | 25.00% SBE - A&E Goal | 25.00% SBE-A&E Goal | N/A | ||
10/6/22 | 20220112 |
Scope of Services for Project Development and Environment (PD&E) Studies |
SBE/A&E – 25% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/4/22 | TAC-N: BA-081A |
Jet Aviation of America at OPF |
SBE/A&E – 0.0% Goal (Based on the justifications provided by the tenant) |
N/A | N/A |
No Measure |
N/A | |||
10/3/22 | E22-DSWM-03 |
Professional Engineering Services for Department of Solid Waste Management's South Dade Solid Waste Management Complex Upcoming Solicitation for Architectural and Engineering Services |
SBE/A&E – 20.50% SBE - A&E Goal |
N/A | N/A |
20.50% SBE - A&E Goal |
20.50% SBE-A&E Goal | N/A | ||
7/12/22 | TAC-N #BA036A |
Ave Buildings B3, LLC Self Storage and Retail Bakery Development |
SBE/A&E – 0% Goal (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/29/22 | A21-MDAD-01 |
MIA Public Restrooms Modernization Phases 1.2-1.5 |
SBE/A&E – 20% Goal |
N/A | N/A | N/A |
20% SBE- A&E Goal |
N/A | ||
6/24/22 | E22-MDAD-01 |
Environmental Management System/ISO 14001:2015 Consulting Services |
SBE/A&E – 15.00% Goal |
N/A | N/A | N/A |
20% SBE- A&E Goal |
N/A | ||
6/22/22 | E22-MDAD-02 |
Aviation Acoustical and Land Use Compatibility Planning Services |
SBE/A&E – No Measure (Insufficient Availability) |
N/A | NA |
No Measure |
N/A | |||
5/16/22 | FTX-05-16-2022-D |
A&E Services – Roofing Replacement and Roof Sign Installation Project |
SBE/A&E – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
5/11/22 | E22-DSWM-01 |
Professional Bond Engineering Services for Department of Solid Waste Management |
SBE/A&E – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/4/22 | TAC-N-AA-0084B |
Sky Harbour Opa-Locka Aiport LLC Phase II Development |
SBE/A&E – 4.00% Goal |
N/A | N/A |
4% SBE-A&E Goal |
N/A | |||
4/25/22 | E21-MDAD-05 |
Inspection Services and Environmental Oversight |
SBE/A&E – Set Aside Tier 3 With Exemption related to 90.6, 9.07, 10.07 and 10.06 |
N/A | N/A | N/A |
Tier 3 Set Aside |
N/A | ||
4/25/22 | E21-MDAD-06 |
Inspection Services and Environmental Oversight |
SBE/A&E – 16% Goal |
N/A | N/A | N/A |
16% SBE-A&E Goal |
N/A | ||
2/3/22 | TAC-N-AC129A |
KOPF Acquisitions Phase 1A |
SBE/A&E – 4.20% |
N/A | N/A | N/A |
4.20% SBE A/E Goal |
N/A | ||
10/28/21 | E21-PROS-03 |
Construction Engineering and Inspection Services for Rickenbacker Causeway Hobie Island North Side Shoreline and Roadway Protection |
SBE/A&E – 10% Goal |
N/A | N/A | N/A |
10.00% SBE-A&E Goal |
N/A | ||
10/18/21 | E21-DSWM-01 |
Professional Bond Engineering Services for DSWM |
SBE/A&E – No Measure (Insufficient Availability) |
N/A | N/a | N/A | No Measure | N/A | ||
10/7/21 | CMJPA 2021.01 |
Joint Participation Agreement (JPA) between Miami-Dade County and the City of Miami for Commodore Trail Revitalization - Phase 1 |
SBE/A&E – 19.60% Goal |
N/A | N/A | N/A |
19.60% SBE - A&E Goal |
N/A | ||
9/29/21 | A21-PROS-04 |
Preston B. Bird & Mary Heinlein Fruit and Spice Park Master Plan Improvements Project |
SBE/A&E– 8% Goal |
N/A | N/A | N/A |
8.00% SBE- A&E Goal |
N/A | ||
9/8/21 | A21-ISD-02 |
Program Management Consultant Services |
SBE/A&E– 18% Goal |
N/A | N/A | N/A |
25.00% SBE-A&E Goal |
N/A | ||
9/3/21 | A21-ISD-01 |
Program Management Consultant (PMC) Services Of Internal Services Department (ISD) Managed And Owned Facilities: Stephen P. Clark Government Center (SPCC) Building, Office |
SBE/A&E– 18% Goal |
N/A | N/A |
25.00% SBE-A&E Goal |
N/A | |||
8/23/21 | DB21-DTPW-08 |
Design-Build Services for Roadway Signs in the Vicinity of Metrorail Stations |
SBE/A&E– set aside |
N/A | N/A | N/A |
SBE - A&E Set Aside |
N/A | ||
8/11/21 | A21-PROS-07 |
Professional Services for the JL (Joe) and Enid W. Demps Park – Park Improvements Phase 2 Project |
SBE/A&E – 24.00% Goal |
N/A | N/A |
24.00% SBE - A&E Goal |
N/A | |||
8/11/21 | A21-PROS-03 |
Professional Services for the Larry and Penny Thompson Memorial Park Renovation to Lakeside Concession Facility |
SBE/A&E – 20.00% Goal |
N/A | N/A |
20.00% SBE-AE Goal |
N/A | |||
8/11/21 | E21-TPO-01 |
General Planning Consultant (GPC) VIII |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
8/10/21 | E20-MDAD-04 |
Aviation Planning & Programming Consultant Services |
SBE/A&E – 15% Goal |
N/A | N/A | N/A |
15% SBE-A&E Goal |
N/A | ||
8/10/21 | E21-MDAD-02 |
MIA Runway 9-27 Rehabilitation |
SBE/A&E – 15% Goal |
N/A | N/A | N/A |
15% DBE Goal |
N/A | ||
7/27/21 | A21-SEA-01 |
Port Representation Services - Architectural |
SBE/ A&E – 17.00% Goal |
N/A | N/A | N/A |
17.00% SBE-A&E Goal |
N/A | ||
7/27/21 | E21-SEA-01 |
Port Representation Services – Engineering |
SBE/ A&E – 17.00% Goal |
N/A | N/A | N/A |
17.00% SBE-A&E Goal |
N/A | ||
6/9/21 | E21-PROS-02 |
Professional Services Agreement (PSA) for Crandon Park Basin Dredging Phase I |
SBE/ A&E – 14.22% Goal |
N/A | N/A |
14.22% SBE/A&E Goal |
N/A | |||
6/1/21 | DB21-DTPW-06 |
Replacement of Existing Span-Wire Signalized Intersections for Mast-Arm Configuration |
SBE/Cons – 8.61% Goal |
N/A | N/A | N/A |
13.00% SBE-A&E Goal |
N/A | ||
5/20/21 | DB21-DTPW-05 |
Roadway Improvements to Bay Vista Blvd. from NE 151 Street to Gwen Margolis Blvd |
SBE/Cons – 9.27% |
N/A | N/A |
22.00% SBE-A&E Goal |
N/A | |||
5/10/21 | DB21-DTPW-04 |
Roadway Improvements to NW 84th Avenue between NW 58th Street and NW 74th Street |
SBE/Cons – 20.90% Goal |
N/A | N/A | N/A |
22.00% SBE-A&E Goal |
N/A | ||
3/29/21 | DB21-DTPW-01 |
Design Build Services (RDBS) for a Project with Disadvantaged Business Enterprise Goals |
10.65% DBE Goal |
N/A | N/A | N/a |
10.65% DBE Goal |
N/A | ||
3/18/21 | DB21-DTPW-03 |
Design-Build Services for the Dadeland South Intermodal Station |
|
N/A | N/A | N/A |
12.59% SBE-A&E |
N/A | ||
3/17/21 | A21-PROS-02 |
Zoo Miami - Hospital Renovation and Expansion |
SBE/A&E – 5% Goal |
N/A | N/A | N/A |
5.00% SBE- A&E Goal |
N/A | ||
3/5/21 | E21-WASD-01 |
Engineering Services for Upgrades to Miami-Dade’s Wastewater Treatment Plants and their Appurtenant Facilities |
SBE/A&E – 20% Goal |
N/A | N/A |
20% SBE/A&E Goal |
N/A | |||
3/2/21 | A21-PROS-01 |
Professional Services for the Ludlam Trail Strategic Implementation Plan Under the Florida Department of Transportation (FDOT) Local Agency Program (LAP) FM 416660-3 |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/3/21 | AB-058A |
Foundry Meek Parcel/DFM9 |
SBE/A&E– 2.17% Goal |
N/A | N/A | N/A |
3.33% SBE-AE Goal |
N/A | ||
2/2/21 | DB21-DTPW-02 |
Roadway Improvements to NE 2 Ave from NE 20 Street to NE 36 Street |
SBE/Cons – 7.7% Goal |
N/A | N/A | N/A |
25.00% SBE-A&E Goal |
N/A | ||
1/20/21 | A20-CUA-01 |
Professional Services for the Renovations and Upgrades to the Miami-Dade County Auditorium |
SBE/A&E – 19.00% SBE-A&E Goal |
N/A | N/A | N/A |
19.00% SBE-A&E Goal |
N/A | ||
1/5/21 | E20-WASD-09 |
Water and Sewer Rates, Fee Analysis and Bond Engineering Services |
SBE/A&E – Under Review |
N/A | N/A |
No Measure |
N/A | |||
12/30/20 | AA-0171B |
OPF Bridge Aviation Warehouse Bldg. MIA2 |
SBE/Cons– 5% Goal |
N/A | N/A | N/A |
5.34% SBE-Con Goal |
N/A | ||
12/23/20 | AB-074A |
IFC New FBO Building & Storage Hangars |
SBE/Cons– 9% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/23/20 | 2021-001 |
MDCR Master Plan Replacement Jail-Site 1 |
SBE/A&E – 18% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/23/20 | 2021-002 |
MDCR Master Plan Replacement Jail-Site 2 |
SBE/A&E – 18% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/9/20 | AB-070A |
Amazon Parcel Sorter Machine Installation at OPF MIA1 Facility |
SBE/A&E– No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/17/20 | DB-20-LIB-01 |
Design and Construction of new 20,000 SQ.FT. Doral Branch Library |
|
N/A | N/A | N/A |
28.0% SBE-A&E Goal |
N/A | ||
11/5/20 | DB20-PROS-01 |
Design- Build Services for the Country Club of Miami Golf Course Reconfiguration |
SBE/A&E– 8.75% |
N/A | N/A | N/A | 8.75% SBE-A&E Goal | N/A | ||
10/15/20 | E21-PROS-01 |
Professional Services Agreement (PSA) for Rickenbacker Causeway Bond Engineering Services |
SBE/A&E – 16.00% Goal |
N/A | N/A | N/A |
16.00% SBE-A&E Goal |
N/A | ||
10/14/20 | E20-MDAD-02A |
General MEP Engineering & Design Services |
SBE/A&E – Set Aside Tier 3 |
N/A | N/A | N/A |
Tier 3 Set-Aside - SBE-A&E 1.00% SBE- Services Goal |
N/A | ||
10/14/20 | E20-MDAD-02B |
General MEP Engineering & Design Services |
SBE/A&E – 15% Goal |
N/A | N/A | N/A |
15.00% SBE-A&E Goal 1.00& SBE-Services Goal |
N/A | ||
10/14/20 | E20-SEA-02 |
Construction, Engineering and Inspection Services |
SBE/A&E – 17% Goal |
N/A | N/A | N/A |
17.00% SBE - A&E Goal |
N/A | ||
10/14/20 | E20-DTPW-01 |
Professional Services Agreement for Traffic Engineering Services for the Department of Transportation and Public Works |
SBE/A&E – 21.5% Goal |
N/A | N/A | N/A |
21.50% SBE - A&E Goal |
N/A | ||
9/28/20 | DB20-WASD-02 |
Design-Build Services for the North District Wastewater Treatment Plant Oxygen Trains and Oxygen Production Facility Consent Decree |
|
N/A | N/A | N/A |
SBE/A&E - 15.20% Goal |
N/A | ||
9/18/20 | E20-MDAD-03 |
Photogrammetric Mapping, Topographic, Planimetric and Light Detection and Ranging (LiDar) Services |
SBE/A&E – 2% Goal |
N/A | N/A | N/A |
2.00% SBE A&E Goal 1.00% SBE Services Goal |
N/A | ||
9/17/20 | A-20-DSWM-01 |
Professional Engineering Services for Dept of Solid Waste Management’s Mosquito Control Complex |
SBE/A&E –Tier 2 Set-Aside 100% |
N/A | N/A | N/A |
Tier 2 Set-Aside 100% SBE-A&E |
N/A | ||
8/12/20 | A20-ISD-05 |
Rehabilitation and Renovation Services of Fleet Facilities included in the Countywide Infrastructure Investment Program (CIIP) |
SBE/A&E – 18% Goal |
N/A | N/A | N/A |
SBE/A&E - 18.00% Goal SBE/Goods - No Measure SBE/Services - No Measure |
N/A | ||
8/6/20 | A20-ISD-06 |
Rehabilitation and Renovation Services of ISD Parking Garages/Structures |
SBE/A&E – 18% Goal |
N/A | N/A | N/A |
SBE/A&E - 18.00% Goal SBE/Goods - No Measure SBE/Services - No Measure |
N/A | ||
8/6/20 | A20-ISD-08 |
Rehabilitation Renovation Services of ISD Office Buildings |
SBE/A&E – 18% Goal |
N/A | N/A |
SBE/A&E - 18.00% Goal SBE/Goods - No Measure SBE/Services - No Measure |
N/A | |||
8/6/20 | E20-ISD-03 |
Rehabilitation Services of ISD Surface Lots/Parking Lots |
SBE/A&E – 18% Goal |
N/A | N/A | N/A |
SBE/A&E - 18.00% Goal SBE/Goods - No Measure SBE/Services - No Measure |
N/A | ||
8/6/20 | E20-DTPW-05 |
Professional Services Agreement for Planning, Design, Engineering, and Management Services for DTPW Highway Division Projects |
SBE/A&E – 24% Goal |
N/A | N/A |
SBE/A&E – 24% Goal |
N/A | |||
8/3/20 | 592500-20-008 |
Zoo Miami- Hospital Renovation and Expansion |
SBE/A&E – 5% Goal |
N/A | N/A | N/A |
SBE/A&E – 5% Goal SBE/ Goods - No Measure SBE/Services - No Measure |
N/A | ||
7/28/20 |
E20-WASD-07 |
Hydrogeologic and Engineering Services for Comprehensive Water Resource Projects including Injection, Production, Monitoring Wells and Aquifer Storage and Recovery Wells |
SBE/A&E – 16% Goal SBE/ Goods - No Measure SBE/Services - No Measure |
N/A | N/A |
SBE/A&E – 16% Goal SBE/ Goods - No Measure SBE/Services - No Measure |
N/A | |||
7/28/20 |
E20-WASD-06 |
Hydrogeologic and Engineering Services for Injection Well Infrastructure relating to the State of Florida Ocean Outfall Legislation |
SBE/A&E – 16% Goal SBE/ Goods - No Measure SBE/Services - No Measure |
N/A | N/A |
SBE/A&E – 16% Goal SBE/ Goods - No Measure SBE/Services - No Measure |
N/A | |||
7/25/20 |
E20-DTPW-06 |
Professional Services for NW 17th Avenue Bridge over Miami River Project Development & Environmental Study | SBE/A&E – No Measure (Federally Funded) | N/A | N/A | N/A |
No Measure |
N/A | ||
7/22/20 |
E20-MDAD-01 |
Bond Engineering Consulting Services |
SBE/A&E – No Measure SBE/Goods – No Measure SBE/Services – No Measure |
N/A | N/A | N/A |
SBE/A&E – No Measure SBE/Goods – No Measure SBE/Services – No Measure |
N/A | ||
7/21/20 |
E20-PROS-02 |
Rickenbacker Causeway Hobie Island North Side Shoreline and Roadway Protection Contract | SBE/A&E – 10% Goal | N/A | N/A |
10% SBE/A&E Goal |
N/A | |||
7/20/20 |
A20-ISD-04 |
Rehabilitation and Renovation Services of ISD Courthouses and Judicial Facilities | SBE/A&E – 18% Goal | N/A | N/A | N/A |
SBE/A&E - 18% Goal No Measure - SBE/Goods No Measure - SBE/Services |
N/A | ||
7/17/20 |
E20-WASD-04A |
Construction Management and Inspection Services | SBE/A&E – 100% Set-Aside | N/A | N/A | N/A |
Tier 3 Set Aside - SBE/A&E No Measure - SBE/Goods No Measure - SBE/Services |
N/A | ||
7/17/20 |
E20-WASD-04B |
Construction Management and Inspection Services | SBE/A&E – 20% Goal | N/A | N/A | N/A |
20.00% SBE-A&E Goal No Measure - Goods No Measure - Services |
N/A | ||
7/13/20 |
A20-ISD-03 |
Rehabilitation and Renovation Services for the Stephen P. Clark Government Center (SPCC) Building | SBE/A&E – 18% Goal | N/A | N/A | N/A |
18%- SBE/A&E goal No Measure - SBE/Goods No Measure - SBE/Services |
N/A | ||
6/16/20 |
E20-WASD-02A |
Geotechnical Services, Special Inspections, Structural Assessments, Soils, Foundations and Materials Testing Services Related to the Improvement, Upgrades and Expansions of Water and Wastewater Treatment Plants, Pump Stations | SBE/A&E – Set-Aside | N/A | N/A | N/A |
Tier II Set Aside A&E 100% Goal No Measure-SBE/Goods No Measure - SBE/Services |
N/A | ||
6/16/20 |
E20-WASD-02B |
Geotechnical Services, Special Inspections, Structural Assessments, Soils, Foundations and Materials Testing Services Related to the Improvement, Upgrades and Expansions of Water and Wastewater Treatment Plants, Pump Stations | SBE/A&E – 20% Goal | N/A | N/A | N/A |
20.00% SBE -A&E Goal No Measure-SBE/Goods No Measure - SBE/Services |
N/A | ||
6/10/20 |
E20-WASD-01A |
GENERAL LAND AND ENGINEERING SURVEYING AND MAPPING SERVICES | SBE/A&E – Set-Aside | N/A | N/A | N/A |
SBE/A&E Tier III Set Aside 100.00% Goal SBE/Goods - No Measure SBE/Services - No Measure |
N/A | ||
6/10/20 |
E20-WASD-01B |
GENERAL LAND AND ENGINEERING SURVEYING AND MAPPING SERVICES |
SBE-A&E 20.00% Goal SBE/Goods - No Measure SBE/Services - No Measure |
N/A | N/A | N/A |
SBE-A&E 20.00% Goal SBE/Goods - No Measure SBE/Services - No Measure |
N/A | ||
6/8/20 |
E20-DTPW-02 |
Professional Services for Bridge Structural Engineering Projects | SBE/A&E – TBA | N/A | N/A | N/A |
TBA |
N/A | ||
5/26/20 |
E20-WASD-05 |
Hydrogeologic and Engineering Services for Comprehensive Water Resource Projects including Injection, Production, Monitoring Wells and Aquifer Storage and Recovery Wells | SBE/A&E – 12% Goal | N/A | N/A | N/A |
12% SBE /AE Goal |
N/A | ||
5/14/20 |
E20-DTPW-04 |
Civil Infrastructure Engineering Services | SBE/A&E – 20.00% Goal | N/A | N/A | N/A | 20.00% SBE/AE Goal | 20.00% SBE/AE Goal
|
N/A | |
5/7/20 |
E20-PROS-01 |
Professional Services for the Ludlam Trail Development Under the Florida Department of Transportation (FDOT) Local Agency Program (LAP) | DBE – 10.65% Goal | N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/6/20 |
DB20-DTPW-01 |
Additional Elevators at Dadeland North Metrorail Station Parking Garage Project | SBE/A&E– 10.65% DBE Goal | N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
3/10/20 |
E20-DTPW-01 |
Professional Services Agreement for Traffic Engineering Services for the Department of Transportation and Public Works | SBE/A&E – 21.50% Goal | N/A | N/A | N/A |
21.50% SBE-A&E Goal |
N/A | ||
2/20/20 |
E19-WASD-03 |
Design and Engineering Services for the Electrical Distribution Building and its Appurtenant Facilities at the North District Wastewater Treatment Plant | SBE/A&E – 17% Goal SBE/G&S – 1% Goal |
N/A | N/A |
17.00% SBE-A&E Goal No Measure - SBE-Goods No Measure - SBE - Services |
N/A | |||
2/11/20 |
A19-DTPW-01 |
Professional Services for Transit and Public Works Projects | SBE/A&E – No Measure | N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
2/11/20 |
E19-DTPW-11 |
Professional Services for Transit and Public Works Projects | SBE/A&E – No Measure | N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/31/20 |
E20-SEA-01 (2019-041) |
Crane Program Engineering and Consulting Services | SBE/A&E – 2.00% Goal SBE/G&S – No Measure |
N/A | N/A | N/A |
3.50% SBE - A&E Goal No Measure - SBE- Goods No Measure - SBE - Services |
N/A | ||
1/31/20 |
E19-WASD-02 |
DESIGN AND ENGINEERING SERVICES FOR TERTIARY TREATMENT AT THE CENTRAL WASTEWATER TREATMENT PLANT | SBE/A&E – 16% Goal SBE/G&S – 1% Goal |
N/A | N/A |
16.00% A&E Goal No Measure- SBE-G No Measure - SBE-Services |
N/A | |||
1/30/20 |
A19-MDAD-01 |
MIA Terminal Wide Re-Roofing and Lighting System Upgrades | SBE/A&E – 30% Goal | N/A | N/A | N/A |
30.00% SBE-A&E Goal 2.00% SBE - Services |
N/A | ||
1/27/20 |
E20-TPO-01 |
DEVELOPMENT AND APPLICATION SUPPORT OF SOUTHEAST FLORIDA REGIONAL PLANNING MODEL (SERPM) VERSION 9 | SBE/A&E – No Measure (Federally Funded) | N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/2/20 |
E19-DTPW-12 |
Professional Services Agreement for Highway Engineering Services for DTPW | SBE/A&E – 22% Goal | N/A | N/A |
19.00% SBE-A&E Goal |
19.00% SBE-A&E Goal | N/A | ||
12/17/19 |
A19-ISD-02 |
Owner’s Representative for Civil and Probate Courthouse |
SBE/Cons – 10% A&E Goal |
N/A | N/A | N/A |
10% A&E Goal |
N/A | ||
10/21/19 |
20190519 |
Franjo Road Improvements from SW 184 Street to Old Cutler Road | SBE/A&E – 34.16% Goal SBE/Cons – 20.3% Goal |
N/A | N/A | N/A |
34.16% SBE/A&E Goal |
N/A | ||
10/17/19/ |
E19-PROS-02 |
Professional Services Agreement (PSA) for Rickenbacker Causeway Bond Engineering Services, located within Commission District 7 | SBE/A&E – 16.00% Goal | N/A | N/A | N/A |
16.00% SBE - A&E Goal No Measure -SBE/Goods No Measure - SBE/Services |
N/A | ||
10/17/19 |
A19-MDAD-02 |
Facility Design and Construction Inspection Services (CIS) | DBE – 28% Goal | N/A | N/A | N/A |
28.00% DBE Goal |
N/A | ||
10/17/19 |
E19-DTPW-08 |
Professional Services for Bridge Inspection and Structural Analysis | DBE – No Measure (Federally Funded) | N/A | N/A | N/A |
No Measure |
N/A | ||
10/3/19 |
DB19-DTPW-03 |
Roadway Improvements to NE 2 Avenue from NE 20 Street to NE 36 Street | SBE/A&E – 100% Goal SBE/Cons – 10.3% Goal SBE/G&S – 4.0% Goal |
N/A | N/A | N/A |
25.00% SBE-A&E Goal |
N/A | ||
9/17/19 |
E19-DTPW-04 |
Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying Services | SBE/A&E – No Measure | N/A | N/A | N/A |
No Measure |
N/A | ||
9/17/19 |
E19-DTPW-06 |
Miscellaneous Professional Services Agreements to Provide Soils, Foundations and Geotechnical Testing Services | SBE/A&E – No Measure | N/A | N/A | N/A |
No Measure |
N/A | ||
9/17/19 |
E19-DTPW-07 |
Miscellaneous Professional Services Agreements to Provide Materials Testing/ Consulting/ Training Services | SBE/A&E – No Measure | N/A | N/A | N/A |
No Measure |
N/A | ||
9/13/19 |
E19-DTPW-05 |
NON-EXCLUSIVE PROFESSIONAL SERVICES AGREEMENT FOR SW 127TH AVENUE FROM SW 136TH STREET TO SW 128TH STREET | SBE/A&E – 20.00% Goal | N/A | N/A | N/A |
Tier 3 Set Aside |
N/A | ||
9/12/19 |
E19-DTPW-09 |
CEI Services for Various DTPW Projects | SBE/A&E – Set-Aside | N/A | N/A | N/A |
Tier 3 Set Aside w/exemption |
N/A | ||
9/12/19 |
E19-DTPW-10 |
General Engineering Services for Permitting, Plan Reviews and Maintenance of Traffic Reviews Processes | SBE/A&E – Set-Aside | N/A | N/A | N/A |
Tier 3 Set Aside |
N/A | ||
8/23/19 |
320008-328286-R. |
Westchester Cultural Arts-Center (WCAC) | SBE/Cons – 30% Goal SBE/G&S – 1% Goal |
N/A | N/A | N/A |
13.42% SBE-Con Goal 1.00% SBE - Services |
N/A | ||
7/25/19 |
E19-DTPW-03 |
Construction Engineering and Inspection Services for South Corridor (South-Dade Transitway) Rapid Transit Project | SBE/A&E – 20% DBE Goal | N/A | N/A | N/A |
20% DBE Goal |
N/A | ||
7/19/19 |
E19-DSWM-01 |
North Dade Landfill Vertical Expansion | SBE/A&E – 20.00% SBE/AE | N/A | N/A | N/A |
20.00% SBE/AE Goal |
N/A | ||
6/28/19 |
RPQ20160236 (E17-DTPW-02) |
CEI SERVICES FOR VARIOUS TRAFFIC SIGNALS, TRAFFIC SIGNS AND STREET LIGHTING PROJECTS | SBE/A&E – 30% Goal | N/A | N/A | N/A |
30% SBE/A&E Goal |
N/A | ||
6/19/19 |
RFP-01307 |
Metromover Comprehensive Wayside System Overhaul | DBE – 18% Goal | N/A | N/A | N/A |
18% DBE Goal |
N/A | ||
6/18/19 |
E19-MDAD-01 |
CC E New PCA Chiller Plant | SBE/A&E – 25% Goal SBE/G&S – .50% Goal |
N/A | N/A | N/A |
30.00% SBE-A&E Goal 0.50% SBE-Services |
N/A | ||
5/17/19 |
DB19-DTPW-01 |
Design-Build Services - South Corridor (South-Dade Transitway) Rapid Transit Project |
DBE – 5% Goal (Build) 24% DBE Goal (Design) |
N/A | N/A | N/A |
24.00% DBE Goal 5% DBE Goal |
N/A | ||
4/30/19 |
A18-MDAD-01 |
CAPITAL IMPROVEMENT PROGRAM (CIP) SPECIALIZED SERVICES AGREEMENT | DBE Goal– 25.0% Goal | N/A | N/A | N/A |
25.00% DBE Goal |
N/A | ||
4/17/19 |
A19-PHCD-01 |
CONCEPTUAL SCHEMATIC DESIGN AND PLANNING SERVICES FOR VARIOUS BUILDING TYPES |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/5/19 |
DB19-SEA-01 |
Cruise Terminal F Expansion and Berthing Re-Alignment Program |
SBE/A&E – 18% Goal |
N/A | N/A | N/A |
20.00% SBE-A&E Goal 8.91% SBE-Con Goal 4.00% SBE-Services 10.00% CWP Goal |
N/A | ||
3/11/19 |
E18-SEA-06 |
Management Financial Consulting and Bond Engineering Services |
SBE/A&E – No Measure |
N/A | N/A | N/A |
SBE/A&E - No Measure |
N/A | ||
2/27/19 |
A19-JHS-01 |
Professional Architectural and Engineering Continuing Services Term Contract(s) |
SBE/A&E – 100% Trade Set-Aside |
N/A | N/A | N/A |
Tier 3 Set -Aside |
N/A | ||
2/27/19 |
E18-DTPW-10 |
Construction, Engineering and Inspection Services for the Metromover Comprehensive Wayside System Overhaul |
DBE – 18% Goal |
N/A | N/A | N/A |
18% DBE Goal |
N/A | ||
2/15/19 |
E19-DTPW-01 |
General Engineering Consultant Services for Traffic Signal Operations |
SBE/ A&E – 10% Goal SBE/G&S - No Measure |
N/A | N/A |
10.00% SBE- A&E Goal No Measure SBE-Goods No Measure SBE - Services |
N/A | |||
1/30/19 |
E19-JHS-01 |
Structural Remediation and 40-Year Survey Engineering Services for Various Jackson Health System Facilities |
SBE/A&E – 100% Set-Aside |
N/A | N/A | N/A |
100% Tier 2 Set Aside |
N/A | ||
1/16/19 |
E19-MDFR-01 |
Recommendation for Non-Exclusive Professional Services Agreement to Perform Comprehensive Investment Grade Audit for Energy Savings and Guaranteed Energy Performance Savings Contract for the Miami-Dade Fire Rescue Fire Stations and Facilities. |
No Measure |
N/A | N/A |
No Measure |
N/A | |||
1/4/19 |
E18-SEA-05 |
Professional Services Agreement (PSA) for Port wide Traffic Impact Study and Master Roadway |
SBE/A&E – 18.00% |
N/A | N/A | N/A |
18% SBE-A&E Goal |
N/A | ||
12/28/18 |
E18-DTPW-05 |
Construction Engineering and Inspection Services for Department of Transportation and Public Works' Infrastructure Renewal Projects |
DBE Goal– No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/12/18 |
E18-SEA-04 |
Civil Infrastructure Engineering Services |
SBE/A&E – 18.00% |
N/A | N/A | N/A |
18.00% SBE-A&E Goal 0.50% SBE - Services Goal |
N/A | ||
12/5/18 |
E18-DTPW-09 |
ROADWAY IMPROVEMENTS FOR NW 12 STREET BUS ONLY LANES FROM THE DOLPHIN PARK AND RIDE FACILITY TO NW 114 AVENUE |
SBE/A&E – 20.00% Goal |
N/A | N/A | N/A |
100% Tier 3 Set Aside w/exemption |
N/A | ||
11/30/18 |
DB18-SEA-01 |
New Cruise Terminal H Program |
SBE/Cons –8.92% , SBE/A&E – 18%; SBE/G&S – 12% |
N/A | N/A | N/A |
8.91% SBE-Con 4.00% SBE-Services 18.50% SBE-A&E Goal 10.00% CWP Goal |
N/A | ||
11/15/18 |
E18-SEA-03 |
Program Management Consultant Services |
SBE/A&E – 15.00% |
N/A | N/A |
18.00% SBE A&E Goal |
N/A | |||
10/31/18 |
E18-DTPW-08 |
Professional Engineering Services for the Underline – Design Criteria Package – 7 Segments |
No Measure |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
10/11/18 |
A18-MDAD-02 |
MIA NTD/CTD Terminal Roofing and Lighting System Upgrades |
SBE/A&E – 30% Goal |
N/A | N/A | N/A |
30.00% SBE A&E Goal
|
|
N/A | |
10/10/18 |
E18-MDAD-03 |
Stormwater Master Plan |
SBE/A&E – 10% Goal |
N/A | N/A |
10% SBE A&E Goal 0.75% SBE G&S Goal |
N/A | |||
10/9/18 | DB18-WASD-02 | Design-Build Services for the Construction of South and Central District Wastewater Treatment Plants Sludge Thickening and Dewatering Buildings |
SBE/A&E – 14.00% Goal |
N/A | N/A | N/A |
2.00% SBE/GS Goal 9.43% SBE/Cons 10.00% CWP Goal |
N/A | ||
9/27/18 | A18-MDFR-01 | Fire Station rebuilds – Groups A, B, and C. Design Services for Various Miami-Dade County Fire Rescue Stations |
SBE/A&E – 20% Goal |
N/A | N/A | N/A |
32.00% - SBE/AE Goal |
N/A | ||
9/27/18 | A18-MDFR-02 | Fire Station rebuilds – Coastal Areas. Design Services for Miami-Dade County Fire Rescue Stations No. 20 and No. 21 |
SBE/A&E – 20% Goal |
N/A | N/A | N/A |
Set Aside Tier 2 100% SBE/AE Goal |
N/A | ||
9/4/18 | 2018-016 | Non-exclusive Professional Services Agreement for Environmental Services |
SBE/A&E – 15.00% Goal |
N/A | N/A |
1.00% SBE/GS Goal 15.00% SBE/AE Goal |
N/A | |||
8/20/18 | E18-WASD-04-A | Construction Inspection Services |
SBE/AE – 20% Goal |
N/A | N/A |
100% Set Aside SBE A/E |
N/A | |||
8/20/18 | E18-WASD-04-B | Construction Inspection Services |
SBE/A&E – Set Aside |
N/A | N/A |
20% SBE AE Goal |
N/A | |||
7/13/18 | A18-SEA-01 | Cruise Terminals and Ropax Facilities |
SBE/A&E – 18.00% Goal |
N/A | N/A |
18.00% SBE/AE Goal |
N/A | |||
7/13/18 | E18-SEA-01 | Marine Infrastructure Engineering Services |
SBE/A&E – 15.00% Goal SBE/G&S - .5% Goal |
N/A | N/A |
15.00% SBE/AE Goal |
N/A | |||
6/22/18 | 20180104 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Hialeah for Roadway Improvement Project along NW 102 Ave from NW 138 Street to NW 145 Place |
SBE/A&E : Land Surveying – 8.50% |
N/A | N/A |
SBE/GS 1.74% SBE/Cons 8.31% |
N/A | |||
6/19/18 | E17-PROS-01 | Request to Advertise FOR Parks, Recreation, and Open Spaces (PROS) Continuing Services of Engineering and Design Related Professional Services Under the Florida Department of Transportation (FDOT) Local Agency Program (LAP) |
DBE – 10.65% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
5/14/18 | E18-TPO-01 | General Planning Consultant (GPC) Support – Phase VII |
SBE/A&E – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/18/18 | E18-MDAD-01 | Fueling Systems Consulting Services at MIA & GAA |
SBE/A&E – 15% Goal |
N/A | N/A | N/A |
0.30% SBE/GS Goal 25.00% SBE/AE Goal |
N/A | ||
4/12/18 | DB17-WASD-02 | Design-Build Services for the Installation of a 54-Inch Diameter Water Transmission Main near Red Road from John E. Preston Treatment Plant to West 53 Street |
SBE/A&E – 19% Goal SBE/Construction 8.4% |
N/A | N/A | N/A |
0.50% SBE/GS Goal 10.40%SBE/Cons Goal 10% CWP Goal
|
N/A | ||
4/12/18 | E18-WASD-02 | Geotechnical Services, Special Inspections, Structural Assessments, Soils, Foundations and Materials Testing Services related to the Improvement, Upgrades and Expansions of Water and Wastewater Treatment Plants, Pump Stations, Collection, Distribution and Transmission Piping, and all related Facilities as necessary to ensure Quality Control/Assurance for Water and Sewer Department’s Capital Improvements Projects |
SBE/A&E – 20% Goal |
N/A | N/A | N/A |
100% Set Aside |
N/A | ||
3/7/18 | E18-DTPW-04 | Department of Transportation and Public Works (DTPW)’s 2020 to 2029 Transit Development Plan (TDP) – Major Update |
SBE/A&E – 4% Goal |
N/A | N/A | N/A |
25.00% SBE/AE Goal |
N/A | ||
3/6/18 | E18-DTPW-06 | Roadway Improvements to SW 157 Ave from SW 42 Street to SW 26 Street |
SBE/A&E – 20% Goal |
N/A | N/A | N/A |
20.00% SBE/AE Goal |
N/A | ||
3/6/18 | E18-DTPW-07 | Roadway Improvements to SW 157 Ave from SW 26 Street to SW 8 Street |
SBE/A&E – 17% Goal |
N/A | N/A | N/A |
17.00% SBE/AE Goal |
N/A | ||
2/23/18 | E17-MDAD-02, A | General MEP Engineering & Design Services |
SBE/A&E –15% Goal |
N/A | N/A | N/A |
1.00% SBE/GS Goal 100.00% Set Aside Tier 2 |
N/A | ||
2/23/18 | E17-MDAD-02, B | General MEP Engineering & Design Services |
SBE/A&E – Set-Aside |
N/A | N/A | N/A |
1.00% SBE/GS Goal 15.00% SBE/AE Goal |
N/A | ||
2/15/18 | E16-MDAD-02 | Baggage Handling Systems Services |
SBE/A&E – 20% Goal |
N/A | N/A | N/A |
20.00% SBE/AE Goal |
N/A | ||
1/10/18 | E17-RER-02 | Multimodal/Mobility Fee Study |
SBE/Cons – 5% Goal |
N/A | N/A | N/A |
5.00% SBE/AE Goal |
N/A | ||
10/19/17 | E17-DTPW-02 | Request for Proposals (RFP) for CEI Services for Various Traffic Signals and Signs and Street Lighting projects for the DTPW Projects |
SBE/A&E – 30% Goal |
N/A | N/A |
30.00% SBE/AE Goal |
N/A | |||
9/20/17 | MDAD W-104A PH2/3 | Phase II and III Warehouse and Office Building at Carrie Meek Warehouse Distribution Center |
SBE/Cons – 7.85% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
9/1/17 | E17-TPO-02 | Recommendation for Non-Exclusive Professional Services Agreement (PSA) for the 2045 Long Range Transportation Plan (LRTP) |
SBE/A&E – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/2/17 | E17-DSWM-02 | South Dade Landfill Cell 4 Closure |
0.50% SBE/GS Goal 30% SBE/AE Goal |
N/A | N/A | N/A |
0.50% SBE/GS Goal 30% SBE/AE Goal |
N/A | ||
8/2/17 | A17-MDAD-01 | MIA Employee Parking Garage A/E Services for Design Criteria Professional Services | SBE/A&E Goal- 20% SBE/G&S Goal- 0.5% |
N/A | N/A | N/A |
0.50% SBE/GS Goal 26.00% SBE/AE |
N/A | ||
7/24/17 | DB17-ISD-01 GOB ESP/ Z000144 | Design-Build Services for Electrical Repairs at the Miami-Dade County Courthouse | SBE/A&E – 25.00% Goal SBE/Cons – 25.66% Goal SBE/G&S – 2.57% Goal |
N/A | N/A | N/A |
5.00% SBE/AE Goal |
N/A | ||
7/18/17 | E17-MDAD-03 | Utilities Master Plan (Water) | SBE/A&E Goal- 10% SBE/G&S Goal- 0.75% |
N/A | N/A |
0.75% SBE/GS Goal 10.00% SBE/AE Goal |
N/A | |||
7/18/17 | E17-MDAD-04 | Stormwater Sampling and Monitoring | SBE/A&E Goal- 10% SBE/G&S Goal- 0.75% |
N/A | N/A |
0.75% SBE/GS Goal 10.00% SBE/AE Goal |
N/A | |||
7/18/17 | E17-MDAD-05 | Stormwater Pollution Prevention Plan | SBE/A&E Goal- 10% SBE/G&S Goal- 0.75% |
N/A | N/A | N/A |
0.75% SBE/GS 10.00% SBE/AE |
N/A | ||
6/20/17 | DB17-WASD-01 | Design-Build Services for the Construction of the Central District Wastewater Treatment Plant Oxygen Production Facility Consent Decree Project 2.27 | SBE/A&E – 13.13% Goal SBE/Cons – 7.15% Goal SBE/G&S – 1% Goal |
N/A | N/A | N/A |
SBE/GS 1.10% SBE/Cons 7.42% SBE/AE 17.13% |
N/A | ||
6/16/17 | E17-MDAD-02, B | General MEP Engineering & Design Services | SBE/A&E Goal- Set-Aside SBE/G&S Goal- 1% |
N/A | N/A | N/A |
1.00% SBE/GS Goal 15.00% SBE/AE Goal |
N/A | ||
6/16/17 | E17-MDAD-02, A | General MEP Engineering & Design Services | SBE/A&E Goal- Set-Aside SBE/G&S Goal- 1% |
N/A | N/A | N/A |
1.00% SBE/GS goal 100% SBE/AE Goal Set Aside Tier 2 |
N/A | ||
6/16/17 | E16-MDAD-02 | Baggage Handling Systems Services | SBE/A&E Goal- 20% SBE/G&S Goal- 0% |
N/A | N/A | N/A |
20.00% SBE/AE Goal No Measure SBE/GS |
N/A | ||
6/5/17 | E17-DSWM-01 | Professional Bond Engineering Services | SBE/A&E - No Measure (Insufficient Availability) | N/A | N/A | N/A |
No Measure |
N/A | ||
6/5/17 | DB17-SEA-01 | Design-Build Services for New Cruise Terminal B Program | SBE/A&E Goal – 18.00% SBE/Cons Goal – 8.92% SBE/G&S Goal – 6.00% |
N/A | N/A | N/A |
18.00% SBE/AE Goal 3.00% SBE/GS Goal 8.91% SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
6/1/17 | DB17-ISD-02 GOB ESP | Design-Build Services for Miami Dade Public Library System (MDPLS) Hialeah Gardens Branch Library | SBE/A&E – 17.00% Goal SBE/Cons – 25.97% Goal SBE/G&S – 2.00% Goal |
N/A | N/A | N/A |
17% SBE/AE Goal 2.00% SBE/GS Goal 25.97% SBE/Cons Goal |
N/A | ||
5/11/17 | E17-DTPW-01 | Request for Proposals (RFP) for CEI Services for Various Design-Build Projects; DTPW 20170006 | Set-Aside Tier 3 | N/A | N/A | N/A |
Set Aside Tier 3 100% |
N/A | ||
5/9/2017 | E17-MDAD-01 | Forensic Glazing Curtain Wall Consultant | SBE/A&E Goal – 10% SBE/ G&S Goal – .5% |
N/A | N/A | N/A |
SBE/GS Goal - 0.50% SBE/AE Goal - 15.00% |
N/A | ||
4/6/17 | E17-WASD-01 | Engineering Design and Related Services for the Design of Small Diameter Water and Wastewater Pipelines | 100% Set Aside Tier I SBE /A&E Goal | N/A | N/A |
100% Set Aside Tier 1 - SBE/&E Goal |
N/A | |||
2/27/17 | E16-MDAD-06 | Flamingo and Dolphin Garages Repairs and Upgrades | SBE/A&E Goal – 20% SBE/ G&S Goal – 1% |
N/A | N/A | N/A |
1.00% SBE/GS Goal 20.00% SBE/AE Goal |
N/A | ||
2/22/17 | E17-RER-01 | Technical services for the evaluation and development of Local Limits in Section 24-42.4 of the Code of Miami-Dade County | Under Review | N/A | N/A |
No Measure |
N/A | |||
2/3/2017 | E17-DTPW-01 | Request for Proposals (RFP) for CEI Services for Various Design-Build Projects; DTPW 20170006 | SBE/A&E Goal – Set-Aside | N/A | N/A |
Set Aside Tier 3 |
N/A | |||
2/6/17 | E17-MPO-01 | SMART Plan General Planning Consultant (GPC) Program | SBE/A&E Goal – No Measure (Federally Funded) | N/A | N/A | N/A |
No Measure |
N/A | ||
1/11/17 | E16-RER-01 | Sea Level Rise project | SBE/A&E Goal -3% | N/A | N/A | N/A |
6.00% SBE/AE |
N/A | ||
12/8/16 | E16-PROS-01 | A Professional Services Agreement for Black Creek Trail Segment B | SBE/A&E Goal - No Measure (Federally Funded) DBE Goal –9.91% |
N/A | N/A | N/A |
9.91% DBE Goal |
N/A | ||
11/10/16 | E16-MDAD-08 | General Special Systems Engineering Services | SBE/A&E Goal – 5.00% | N/A | N/A |
2.00% SBE/GS Goal 25.00% SBE/AE Goal |
N/A | |||
10/24/16 | A16-MDAD-04 | Airport Wayfinding/Signage Design Services | SBE/A&E Goal – 12.00% | N/A |
1.00% SBE/GS Goal 20.00% SBE/AE Goal |
N/A | ||||
9/19/16 | 20160075 | Joint Participation Agreement (JPA) Between Miami-Dade County and The City of Hialeah for Roadway Improvement Project Along NW 97 Avenue from NW 154 Street to NW 170 Street | SBE – A&E Goal – 14.0% SBE – Good & Services Goal – 0.2% SBE – Cons Goal – 3.9% - Concrete 0.9% - Landscaping 0.7% - Signage & Pavement Markings |
N/A | N/A | N/A |
SBE - A&E Goal 25.00% SBE - G&S Goal 1.18% SBE- Cons Goal - 4.61% |
N/A | ||
8/8/16 | DB16-DTPW-01 (20160163) | Design-Build Services for the Bridge Replacement at Old Cutler Road over C-100 Canal (874293), Old Cutler Road over Black Creek Canal (874432) | SBE/Cons Goal – Trade Set-Aside for Traffic Stripes and Markings SBE/A&E Goal – 7.80% (Surveying and Mapping) SBE/ G&S Goal – 5.52% (Maintenance of Traffic & Grass/Sod) |
N/A | N/A | N/A |
7.80% SBE/AE Goal 6.77% SBE/GS Goal Trade Set Aside - SBE/Cons Goal 10.00% CWP Goal |
N/A | ||
7/19/16 | E16-DTPW-02 | Professional Services Agreement for Engineering Services for Department of Transportation and Public Work’s Capital Improvement Plan (2) | DBE Goal- 22% | N/A | N/A | N/A | 22% DBE Goal | 22% DBE Goal | N/A | |
7/12/16 | E16-MDAD-10 | Aviation Acoustical and Land Use Compatibility Planning Services | No Measure (Insufficient Availability) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
7/12/16 | E16-MDAD-02(R) | Baggage Handling Systems Services | SBE/A&E Goal- 10% SBE/G&S Goal- 0% |
N/A | N/A | N/A | 20.00% SBE/AE Goal | 20.00% SBE/AE Goal | N/A | |
7/1/16 | A16-MDFR-01 | Design Services for Miami-Dade County Fire Rescue Station No. 68 | 20% SBE /A&E Goal | N/A | N/A | 100% Set Aside Tier 2 | N/A | |||
6/28/16 | E16-MDAD-06 | Flamingo and Dolphin Garages Repairs and Upgrades | SBE /A&E Goal – 14% SBE/ G&S Goal – Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
6/23/16 | E16-MDAD-07 | General MEP Engineering & Design Services | 15.0% SBE A & E Goals | N/A | N/A | N/A |
15.00% SBE/AE Goal 100% Set Aside Tier 2 |
N/A | ||
6/21/16 | DB16-DTPW-05 | Design-Build Services for the Bridge Replacement at SW 42 Avenue over Gables Waterway (874275) | Trade Set-Aside | N/A | N/A | N/A |
7.45% SBE/AE Goal |
7.45% SBE/AE Goal | N/A | |
07/29/16 | DB16-DTPW-02 (RPQ No. 20160164) | Design-Build Services for the Bridge Replacement at Snapper Creek West of SW 107 Avenue (874436), SW 16 Street West of SW 99 Avenue (874235), and NE 10 Avenue North of NE 79 Street (874178) | SBE/Cons Goal – Trade Set-Aside for Traffic Stripes and Markings SBE/A&E Goal – 7.05% |
N/A | N/A | N/A |
2.00% SBE/GS Goal Trade Set Aside SBE/Cons Goal 7.05% SBE/AE Goal |
N/A | ||
06/06/16 | E16-MDAD-02 | Baggage Handling Systems Services | 10% SBE A&E Goal | N/A | N/A | N/A | Under Review | Under Review | N/A | |
06/03/16 | DB16-DTPW-01 (RPQ No. 20160162) | Design-Build Services for the Bridge Replacement at Old Cutler Road Over C-100 Canal (874293) Standard Industrial Code (SIC) | 7.80% SBE - A&E Goal | N/A | N/A | N/A |
7.80% SBE - A&E Goal |
N/A | ||
5/25/16 | DB16-WASD-01 | Design-Build Services for the Construction of South District Wastewater Treatment Plant and Central District Wastewater Treatment Plant Sludge Thickening and Dewatering Buildings | 18.0% SBE A & E - 7.88% SBE Cons - 1% SBE Goods and Services 25/16 | N/A | N/A | 14.00% SBE/AE Goal | 14.00% SBE/AE Goal | N/A | ||
5/20/16 | A16-JHS-01 | General Civil Engineering Services | 100% Set Aside Tier 3 (w/exempt) | N/A | N/A | N/A | 100% Set Aside Tier 3 (w/exempt) | 100% Set Aside Tier 3 (w/exempt) | N/A | |
5/19/16 | A16-MDAD-03 | Terminal Optimization Program (TOP) Facility Design Services | 28.0% DBE Goal | N/A | N/A | N/A | 28.00% DBE Goal | 28.00% DBE Goal | N/A | |
5/19/16 | E16-MDAD-04 | Aviation Planning & Programming Consultant Services for Project | 25.0% DBE Goal | N/A | N/A | N/A | 25.00% DBE Goal | 25.00% DBE Goal | N/A | |
5/19/16 | A14-MDAD-01 | Terminal Optimization Program (TOP) | 23.4% DBE Goal | N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/6/2016 | A16-MDAD-01 | Airport Operations Center (AOC) Design Services | 27.0% DBE Goal | N/A | N/A | N/A | 27% DBE Goal | 27% DBE Goal | N/A | |
5/6/2016 | E16-MDAD-03 | General Civil Engineering Services | 23.0% DBE Goal | N/A | N/A | N/A | 23% DBE Goal | 23% DBE Goal | N/A | |
5/4/2016 | E16-SEA-02 (Project No. 2016-023 | Non-Exclusive Professional Services Agreement for Civil Infrastructure Engineering Services. | 18.0% SBE A & E Goal | N/A | N/A | N/A | 18.00% SBE/AE Goal | 18.00 SBE/AE Goal | N/A | |
4/22/16 | E15-SEA-01 (2016-008) | Planning Services | 11% SBE/AE Goal | N/A | N/A | N/A |
11.00% - SBE/AE Goal No Measure - SBE/GS |
N/A | ||
4/11/16 | E16-MDAD-01 | Miami International Airport (MIA) central Base Apron and Utilities Modification and Expansion | 15% SBE A/E and .0075% SBE G&S | N/A | N/A | N/A |
0.75% SBE/GS Goal 15.00% SBE/AE Goal |
N/A | ||
4/8/16 | E16-WASD-03 | Design Services for Wastewater Treatment Plants Related to the Ocean Outfall Legislation Projects | 20% - SBE A&E and 1% SBE G&S Goals | N/A | N/A | N/A |
4.00% SBE/GS Goal 20.00% SBE/AE Goal |
N/A | ||
3/15/16 | E16-MDAD-05 | Aviation Planning & Programming Consultant Services for MDAD | 20% SBE A & E, and .0030% SBE Goods & Services | N/A | N/A | N/A | 20.00% SBE/AE Goal | 20.00% SBE/AE Goal | N/A | |
3/10/16 | E15-SEA-02 | Program Management Consultant Services | Participation Goals: SBE A & E 15%, and SBE Goods & Services 2.00% | N/A | N/A |
2.00% SBE - G&S Goal 15.00% SBE - A&E Goal |
N/A | |||
3/4/16 | DB15-WASD-01 | Design-Build Services for Replacement of Water Mains and Service Conversions in the City of North Miami Beach “Donut Hole” Services Area | Participation Goals: SBE A & E 20%, SBE Construction 16%, and SBE Goods & Services 0.25% | N/A | N/A | N/A | 25.00% SBE/A&E Goal | 25.00% SBE- A&E Goal | N/A | |
2/29/16 | E16-PWWM-01 | Non-Exclusive Professional Services Agreement for NW 97 Avenue from NW 52 Street to NW 58 Street | Level 1 Set Aside | N/A | N/A | N/A | Level 1 Set Aside | Level 1 Set Aside | N/A | |
2/25/16 | E15-PWWM-13 | Florida Department of Transportation Local Agency Program Engineering and Design Related Professional Continuing Service Contracts for DTPW Safe Routes To School Projects | 9.91% - DBE – Goal | N/A | N/A | 9.91% DBE Goal | 9.91% DBE Goal | N/A | ||
2/9/16 | E15-RER-01 | Environmental Cleanup, Compliance and Related Services for Miami-Dade Transit Department and Other County | No Measure (DBE) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/9/16 | E15-RER-02 PTP | Environmental Cleanup, Compliance and Related Services for Miami-Dade Transit Department (MDT) and Other County Departments Utilizing People’s Transportation Plan (PTP) Funds. | Set Aside Tier 3 | N/A | N/A |
Set Aside Tier 3 100% SBE/AE Goal |
N/A | |||
2/9/16 | E15-RER-03 PTP | Environmental Cleanup, Compliance and Related Services for Miami-Dade Transit Department (MDT) and Other County Departments Utilizing People’s Transportation Plan (PTP) Funds. | 8% A & E Goal Participation | N/A | N/A | 11.00% SBE/AE Goal | 11.00% SBE/AE Goal | N/A | ||
1/28/16 | A15-AOC-01 GOB (R) | Notice of Professional Services Agreement for the Revision to the 2008 Eleventh Judicial Circuit-wide Courts and the 2008 Correctional Facilities Master Plans. | SBE A & E 10% Goal | N/A | N/A | N/A | Under Review | Under Review | N/A | |
1/21/16 | E15-MDAD-04-R | Automated People Mover System Consultant at MIA | SBE/A&E Goal- 1.5% SBE/G&S Goal- 0.5% |
N/A | N/A | N/A |
4.50% SBE/G&S Goal 6.00% SBE/A&E Goal |
N/A | ||
12/23/15 | DB15-PWWM-01 (20150195) | Roadway Improvements to NE 2 Avenue from NE 69 Street to NE 84 Street | 11.00% SBE/AE Goal 10.60% SBE/Cons Goal 2.40% SBE/GS Goal |
N/A | N/A | 21% SBE/A&E Goal | 21% SBE/A&E Goal | N/A | ||
12/16/15 | A15-AOC-01 GOB | Notice Of Professional Services Agreement For The Revision To The Courts Master Plan Phase 2 | No Measure | N/A | No Measure | No Measure | N/A | |||
12/9/15 | E15-DTPW-04 | Professional Services for Engineering Services for Miami-Dade | 0% DBE Goal | N/A | N/A | N/A | No Measure | No Measure | N/A | |
11/24/15 | E15-MDT-03 | Continuous Professional Services for Federally Funded Projects | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
11/24/15 | E15-WASD-18 | Engineering Design and Related Services for the Improvement, Renewal and Replacement of the Hialeah and John E. Preston Water Treatment Plants, and Associated Water Distribution System, Pipelines, Wellfields, and Re-pumping Facilities, Remote Storage and its Appurtenant Water Facilities | 20% - SBE/ A&E Goal 0% - SBE/ G&S Goal |
N/A |
24.00% - SBE/A&E Goal 3.00% - SBE/G&S Goal |
N/A | ||||
11/24/15 | E15-WASD-19 | Engineering Design and Related Services for the Improvement, Renewal and Replacement of the Alexander Orr Water Treatment Plant and the South Miami-Dade Water Supply System, which includes the following plants: Leisure City, Naranja, Elevated Water Tank, Everglades Labor Camp and Newton Water Treatment Plants; and Ancillary Facilities to those plants; as well as Well Fields, Re-pumping Facilities, Remote Storage and its Appurtenant Facilities | 20% - SBE/ A&E Goal 0% - SBE/ G&S Goal |
N/A |
24.00% - SBE/A&E Goal 3.00% - SBE/G&S Goal |
N/A | ||||
10/30/15 | E15-MDAD-04 | Automated People Mover System Consultant at MIA | SBE/A&E Goal- 5% SBE/G&S Goal- 4.5% |
N/A | N/A |
SBE/A&E Goal - 5.00% SBE/G&S Goal - 4.50% |
N/A | |||
10/30/15 | DB15-WASD-03 | Design-Build Services for Installation of a 48-inch Diameter Water Main Downtown | 20% SBE-A&E Goal 8.2% SBE-Cons Goal 0.5% SBE-G&S Goal |
N/A |
4% SBE/G&S Goal 14% SBE/Cons Goal 26% SBE/A&E Goal 10% CWP Goal |
N/A | ||||
10/30/15 | E15-WASD-17 | Hydrogeologic and Engineering Services for Disposal, Water Supply, Monitoring Wells and Aquifer Storage and Recovery Wells | 20% SBE-A&E Goal 0.5% SBE-G&S Goal |
N/A |
4.00% SBE/G&S Goal 25.00% SBE/A&E Goal |
N/A | ||||
10/29/15 | E15-MDT-01 | Professional Services for Additional Elevators at Dadeland North Metrorail Station | 0% DBE Goal | N/A | N/A | No Measure | No Measure | N/A | ||
9/30/15 | E15-PWWM-11 | Roadway Improvements to NW 25 Street from NW 117 Avenue to NW 87 Avenue | SBE/A&E Goal – 30.00% | N/A | N/A | 30.00% SBE/A&E Goal | 30.00% SBE/A&E Goal | N/A | ||
9/29/15 | E15-PWWM-07 | Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying Services | No Measure (Pre-Qualification Pool) | N/A | N/A | No Measure | No Measure | N/A | ||
9/29/15 | E15-PWWM-08 | Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying Services | No Measure (Pre-Qualification Pool) | N/A | N/A | No Measure | No Measure | N/A | ||
9/29/15 | E15-PWWM-09 | Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying Services | No Measure (Pre-Qualification Pool) | N/A | N/A | No Measure | No Measure | N/A | ||
9/24/15 | A15-JHS-01-A | A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope A, JNMC | SBE/A&E Goal – 20% | N/A | N/A | N/A | 20% SBE/A&E Goal | 20% SBE/A&E Goal | N/A | |
9/24/15 | A15-JHS-01-B | A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope B, JHS West | SBE/A&E Goal – 20.5% | N/A | N/A | N/A | 20.5% SBE/A&E Goal | 20.5% SBE/A&E Goal | N/A | |
9/24/15 | A15-JHS-01-C | A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope C, JHS Main Campus | SBE/A&E Goal – 26.15% | N/A | N/A | N/A | 26.15% SBE/A&E Goal | 26.15% SBE/A&E Goal | N/A | |
9/24/15 | A15-JHS-01-D | A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope D, JHS Main Campus | SBE/A&E Goal – 11.59% | N/A | N/A | N/A | 11.59% SBE/A&E Goal | 11.59% SBE/A&E Goal | N/A | |
9/24/15 | A15-JHS-01-E | A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope E, JSCH | SBE/A&E Goal – 13.75% | N/A | N/A | N/A |
6.43% SBE/A&E Goal |
6.43% SBE/A&E Goal | N/A | |
9/17/15 | DB15-SEA-01 /2015-055 | Cruise Terminal F Upgrades |
SBE/ Construction Goal- 9.87%% SBE/ Good & Services Goal – 6% |
N/A | N/A | N/A |
14% SBE/A&E Goal 6.00% SBE/G&S Goal 9.87% SBE/Construction Goal 10% CWP Goal |
N/A | ||
9/10/15 | E15-MDAD-03 | Environmental and Safety Management System | 15% SBE/A&E Goal | N/A | N/A | N/A | 15% SBE/A&E Goal | 15% SBE/A&E Goal | N/A | |
8/17/15 | A15-PROS-01 | PROS Full Services PSA – Costal Parks North | 10% SBE/AE Sub-consultant Goal | N/A | N/A | 33% SBE/A&E Goal | 33% SBE/A&E Goal | N/A | ||
8/17/15 | A15-PROS-02 | PROS Full Services PSA – Costal Parks South | 10% SBE/AE Sub-consultant Goal | N/A | N/A | 33% SBE/A&E Goal | 33% SBE/A&E Goal | N/A | ||
8/17/15 | A15-PROS-03 | PROS Full Services PSA – Region A | 10% SBE/AE Sub-consultant Goal | N/A | N/A |
33% SBE/A&E Goal 4% SBE/G&S Goal |
N/A | |||
8/17/15 | A15-PROS-04 | PROS Full Services PSA – Region B | 10% SBE/AE Sub-consultant Goal | N/A | N/A |
33% SBE/A&E Goal 4% SBE/G&S Goal |
N/A | |||
8/17/15 | A15-PROS-05 | PROS Full Services PSA – Region C | 10% SBE/AE Sub-consultant Goal | N/A | N/A |
33% SBE/A&E Goal 4% SBE/G&S Goal |
N/A | |||
8/17/15 | A15-PROS-06 | PROS Full Services PSA – Region D | 10% SBE/AE Sub-consultant Goal | N/A | N/A |
33% SBE/A&E Goal 4% SBE/G&S Goal |
N/A | |||
8/14/15 | A15-PROS-07 ESP | PROS Full Services PSA – West Kendall District Park | 10% SBE/AE Sub-consultant Goal .87% SBE/GS Subcontractor Goal |
N/A | N/A | Under Review | Under Review | N/A | ||
8/12/15 | E15-WASD-02 | Engineering Design And Related Services For The Improvement, Upgrades and Expansion of Local Wastewater Pump Stations and Related Facilities necessary for Capital Improvement Projects |
100% SBE/AE Set-Aside No Measure - SBE/GS |
N/A | N/A | 100% SBE/AE Set Aside Goal | 100% SBE/AE Set Aside Goal | N/A | ||
8/11/15 | E15-WASD-04 | Engineering Design and Related Services for the Improvement, Upgrades and Expansion of Regional Wastewater Pump Stations and Related Facilities necessary for Capital Improvement Projects |
20% SBE/AE Sub-consultant Goal No Measure - SBE/GS |
N/A | N/A |
20% SBE/AE Goal 4.00% SBE/GS Goal |
N/A | |||
8/10/15 | ASPCA- 999 | ASPCA/ASD Liberty City Clinic | 20% SBE/A&E Goal | N/A | N/A | N/A | 20% SBE/A&E Goal | 20% SBE/A&E Goal | N/A | |
8/4/15 | E15-WASD-03A | Engineering Design And Related Services For The Design Of Small Diameter Water And Wastewater Pipelines For The Water And Sewer Department’s Wastewater And Water Collection, Transmission And Distribution System | 100% SBE/AE Set-Aside | N/A | N/A | 100% SBE/AE Set Aside Tier 3 | 100% SBE/AE Set Aside Tier 3 | |||
8/4/15 | E15-WASD-03B | Engineering Design And Related Services For The Design Of Small Diameter Water And Wastewater Pipelines For The Water And Sewer Department’s Wastewater And Water Collection, Transmission And Distribution System | 20% SBE/AE Sub-Consultant Goal | N/A | N/A | 20% SBE/AE Goal | 20% SBE/AE Goal | |||
8/3/15 | E15-WASD-01 | Engineering Design And Related Services For The Design Of Large Diameter Water And Wastewater Pipelines For The Water And Sewer Department’s Wastewater And Water Collection, Transmission And Distribution System | 20% SBE/AE Sub-Consultant Goal | N/A | N/A | 20% SBE/A&E Goal | 20% SBE/A&E Goal | N/A | ||
7/24/15 | E15-WASD-14 | Water And Sewer Rates, Fee Analysis And Bond Engineering Services | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
7/22/15 | E15-WASD-13 | Geotechnical Services, Special Inspections, Structural Assessments, Soils, Foundations and Materials Testing Services related to the Improvement, Upgrades and Expansions of Water and Wastewater Treatment Plants, Pump Stations, Collection, Distribution and Transmission Piping, and all related Facilities as necessary to ensure Quality Control/Assurance for Water and Sewer Department’s Capital Improvement Projects | 20% SBE/A&E Sub-consultant Goal | N/A | N/A | 20% SBE/A&E goal | 20% SBE/A&E goal | |||
7/19/15 | E15-WASD-12 | Engineering Services For The Proposed Upgrades To The Miami-Dade South District Wastewater Treatment Plant And Its Appurtenant Facilities | 35% SBE/A&E Sub-consultant Goal | N/A | N/A | 35% SBE/A&E goal | 35% SBE/A&E goal | N/A | ||
7/19/15 | E15-WASD-11 | Engineering Services For The Proposed Upgrades To The Miami-Dade North District Wastewater Treatment Plant And Its Appurtenant Facilities | 35% SBE/A&E Sub-consultant Goal | N/A | N/A | 35% SBE/A&E goal | 35% SBE/A&E goal | N/A | ||
7/19/15 | E15-WASD-10 | Engineering Services For The Proposed Upgrades To The Miami-Dade Central District Wastewater Treatment Plant And Its Appurtenant Facilities Including Pump Stations 1 And 2 | 35% SBE/A&E Sub-consultant Goal | N/A | N/A | 35% SBE/A&E goal | 35% SBE/ A&E Goal | N/A | ||
7/17/15 | E15-MDT-02 | Professional Services Agreement – Bridge Inspection and Structural Analysis | No Measure (Federal Funds) | N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/18/15 | A15-JHS-01 | Jackson North Medical Center Programming, Design, Procurement and Construction Administration Services | 14.5% SBE-A/E Goal and 5% SBE-G&S Goal | N/A | N/A | 14.50% SBE/AE Goal | 14.50% SBE/AE Goal | N/A | ||
6/15/15 | E15-PWWM-02 | Roadway Improvements to NE 151 Street from Biscayne Blvd. to Bay Vista Blvd. | 25% - SBE - A&E - Goal | N/A | N/A | Under Review | Under Review | N/A | ||
5/28/15 | VZMP-AE-2015 | Vizcaya Museum and Gardens Master Plan Refinement | 20% - SBE - A&E - Goal | N/A | N/A | 22% - SBE- A&E - Goal | 22% - SBE - A&E - Goal | N/A | ||
5/18/15 | E15-MDAD-02 | Utilities Master Plan (Sanitary Sewer) | 10% - SBE - A&E - Goal | N/A | N/A | N/A | 10.00%-SBE- A&E Goal | 10.00%-SBE-A&E Goal | N/A | |
5/1/15 | E15-PWWM-01 | Roadway Improvements to NW South River Drive from NW 32 Ave to NW 38 Ave | 18% - SBE - A&E - Goal | N/A | N/A | 18%-SBE-A&E-Goal | 18%-SBE-A&E-Goal | N/A | ||
4/17/15 | A15-PROS-01 | PROS Full Services PSA’s | 10% - SBE - A&E - Goal | N/A | Project On Hold | Project On Hold | Project on Hold | |||
4/8/15 | DB14-WASD-08 | Design-Build Services for the Construction of a New Drinking Water Laboratory Building at the Alexander Orr, Jr. Water Treatment Plant |
38% - SBE – A&E – Goal 41.55% - SBE – Const – Goal 1.03% - SBE – G&S – Goal |
N/A | N/A |
1.03%-SBE-G&S Goal 41.55% - SBE- Const - Goal 38.00% - SBE-A&E Goal |
N/A | |||
4/7/15 | DB15-ISD-01 | Design-Build Services for the new Miami-Dade Police Department Academy Building | 28% - SBE – A&E – Goal | N/A | N/A | N/A | 31% -SBE-A&E Goal | 31%-SBE-A&E-Goal | N/A | |
4/1/15 | E15-PWWM-06 | Florida Department of Transportation Local Agency Program Engineering and Design Related Professional Continuing Service Contracts for PWWM Safe Route to School Projects | 9.91% – DBE – Goal | N/A | N/A | N/A | 9.91% – DBE – Goal | 9.91% – DBE – Goal | N/A | |
3/23/15 | DB14-WASD-06 | Design-Build Services for Replacement of Water Mains and Service Conversions in the South Miami Heights Area (PHASE A) |
20% - SBE – A&E – Goal 4.86% - SBE – Const – Goal .25% - SBE – G&S – Goal |
N/A | N/A |
25%-SBE-A&E - Goal 0.25% - SBE Goal 11.56% SBE-Const Goal 10% CWP Goal |
||||
3/23/15 | DB14-WASD-07 | Design-Build Services for Replacement of Water Mains and Service Conversions in the South Miami Heights Area (PHASE B) |
20% - SBE – A&E – Goal 4.88% - SBE – Const – Goal .25% - SBE – G&S – Goal |
N/A | N/A |
25%-SBE-A&E - Goal 0.25% - SBE Goal 12.01% SBE-Const Goal 10% CWP Goal |
||||
3/19/15 | E15-PWWM-02 | Construction Engineering and Inspection Services & Florida Department of Transportation Local Agency Program Compliance Services For Tamiami Canal Bridge Replacement |
9.91% – DBE – Goal | N/A | N/A | N/A | 9.91% - DBE Goal | 9.91%-DBE Goal | N/A | |
3/19/15 | E15-PWWM-03 | Florida Department of Transportation Local Agency Program Compliance Services For Two (2) Projects Along NW 74 Street | 9.91% – DBE – Goal | N/A | N/A | N/A | 9.91% - DBE Goal | 9.91% - DBE Goal | N/A | |
3/19/15 | E15-PWWM-04 | Florida Department of Transportation Local Agency Program Compliance Services for Two (2) Projects: Improvements to Old Cutler Trail Bicycle Route and Bridge Rehabilitation at 328 Street Over Levee L-31-E | 9.91% – DBE – Goal | N/A | N/A | N/A | 9.91% - DBE Goal | 9.91% - DBE Goal | N/A | |
3/19/15 | E15-PWWM-05 | Florida Department of Transportation Local Agency Program Compliance Services for Various Safe Routes to School Projects, Phase 9 through 13 | 9.91% – DBE – Goal | N/A | N/A | N/A | 9.91% - DBE Goal | 9.91% - DBE Goal | N/A | |
3/16/15 | CMJPA-2015.01 | JPA between Miami-Dade County and the City of Miami for Roadway Improvement at NE 2 Ave from NE 20 Street to NE 36 Street |
12.78% - SBE – A&E – Subcontractor Goal 12.51% - SBE – Const – Subcontractor Goal |
N/A | N/A |
21.94%-SBE-Const Goal 12.78%-SBE-A&E Goal |
N/A | |||
3/16/15 | CMJPA-2015.02 | JPA between Miami-Dade County and the City of Miami for Roadway Improvement at NE 2 Ave from NE 69 Street to NE 84 Street |
12.02% - SBE – A&E – Subcontractor Goal 11.98% - SBE – Const – Subcontractor Goal |
N/A | N/A |
12.02%-SBE -A&E Goal 21.88% - SBE - Const Goal 10% CWP Goal |
N/A | |||
3/13/15 | DB14-WASD-09 | Design-Build Services for Installation of a 36-Inch Diameter Sanitary Sewer Force Main in NW 107 Ave from NW 7 Street to NW 25 Street | 13% - SBE – A&E – Goal 8.3% - SBE – Const – Goal 2% - SBE – G&S – Goal |
N/A |
20% SBE-A&E Goal 2% SBE Goal 8% SBE-Const Goal 10% CWP Goal |
N/A | ||||
3/4/15 | AAA-3-4-2015 | American Airlines Arena Restaurant Renovation | 10%-SBE-A&E Goal | N/A | N/A | 10% SBE-A&E Goal | 10% SBE-A&E Goal | N/A | ||
3/3/15 | E15-MDAD-01 | Photogrammetric Mapping and Light Detection and Ranging (LIDAR) Services | No Measure | N/A | N/A | No Measure | No Measure | N/A | ||
2/12/15 | E15-MPO-01 | Non-Exclusive Professional Services Agreement (PSA) for the General Planning Consultant (GPC) Progr |
9.91% – DBE – Goal | N/A | N/A | N/A | 9.91% – DBE – Goal | 9.91% – DBE – Goal | N/A | |
1/20/15 | DB14-WASD-05 | Design-Build Services to Furnish and Install a 48-inch Force Main along North Miami Avenue from NW 8 St along to 36 St and along NE 36 St from North Miami Ave. to NE 2 Avenue |
17.5% - SBE – A&E – Goal 12.82% - SBE – Const – Goal .25% - SBE – G&S – Goal |
22% -SBE-A&E Goal 0.25% - SBE-G&S Goal 9.33%% -SBE-Const Goal 14.20% CWP Goal |
N/A | |||||
1/13/15 | DB14-MDT-01 | Quail Roost Park and Ride | 15% – DBE – Goal | N/A | N/A | N/A | 15% – DBE – Goal | 15% – DBE – Goal | N/A | |
1/13/15 | E14-MDT-01 | SR 836 Express Bus Service | 10% – DBE – Goal | N/A | N/A | N/A | 10% – DBE – Goal | 10% – DBE – Goal | N/A | |
1/8/15 | E14-MDAD-02 | Inspection Services and Environmental Oversight | 25% - SBE - A&E - Goal | N/A | 100% Set Aside Tier 2 | 100% Set Aside Tier 2 | N/A | |||
12/30/14 | DB14-WASD-03 | Design-Build Services for the Installation of a 48-inch diameter Water Transmission Main for Area N |
15% - SBE – A&E – Goal 7.20% - SBE – Const – Goal 0.25% - SBE – G&S – Goal |
N/A |
21% - SBE-A&E Goal 0.18%-SBE-A&E Goal 7.20% - SBE - Cons Goal |
N/A | ||||
12/19/14 | E14-MDAD-03 | Fueling System Consulting Services at MIA and GAA’s | 15% - SBE - A&E - Goal | N/A | N/A | Under Review | Under Review | N/A | ||
12/15/14 | E14-RER-01 | Professional Service Agreement for Environmental Cleanup, Compliance and Related Services for Miami-Dade County Facilities |
Set-Aside | 100% 2nd Tier Setaside | 100% 2nd Tier Setaside | N/A | ||||
12/15/14 | E14-RER-03 | Professional Service Agreement for Environmental Cleanup, Compliance and Related Services for Miami-Dade County Facilities |
5% - SBE - A&E - Goal | 15%-SBE-A&E Goal | 15%-SBE-A&E Goal | N/A | ||||
12/12/14 | A14-ISD-02 | Professional Service Agreement for the Richmond Heights Shopping Center | 11% - SBE - A&E - Goal | N/A |
Set Aside Tier 1 100% SBE- A&E Goal |
N/A | ||||
11/21/14 | E14-PWWM-09 | Non-exclusive Professional Service Agreement for South Miami Avenue Streetscape Improvements from 15 Rd to 8 St |
20% - SBE - A&E - Goal | N/A | SBE-A&E 28% Goal | SBE-A&E 28% Goal | ||||
11/5/14 | E14-PWWM-08 | Non-exclusive Professional Service Agreement for Bond Engineering Services. | CBE - 5% Goal SBE - Goods & Services - No Measure |
N/A |
SBE - A&E- 16% Goal SBE - Goods & Services - No Measure |
N/A | ||||
10/30/14 | E14-WASD-02 | NTPC for Professional Cost Estimating and Scheduling Services |
25% CBE Goal .5% SBE Goal |
N/A |
0.05% SBE - Goods & Services 30.00% SBE - A&E |
N/A | ||||
10/17/14 | 59250014004 | Zoo Miami – Animal Hospital Expansion | 13% CBE Goal | N/A | N/A | 13% CBE Goal | 13% CBE Goal | N/A | ||
9/29/14 | E14-PWWM-10 | FDOT Local Agency Program Compliance Services for Various Projects | 9.91% DBE Goal | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/14/14 | E14-PA-01 | Professional Services Agreement for Digital Referenced Oblique Aerial Imagery Solutions and Optional Orthophotography Services | No Measure | N/A | N/A | N/A |
CBE No Measure SBE No Measure |
N/A | ||
8/14/14 | E14-PWWM-07 | CEI Services & FDOT LAP Compliance Services for the Tamiami Canal Bridge Replacement | 8.6% DBE Goal | N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/1/14 | E14-SEA-01R | Professional Services Agreement for A&E Services for Management Financial Consulting and Bond Engineering Services |
6% CBE Goal SBE No Measure |
N/A |
6% CBE Goal SBE No Measure |
N/A | ||||
7/25/14 | E14-WASD-03 | Professional Engineering Services Relating to The Operations and Maintenance of The Water and Sewer Department’s Water System |
32% CBE Goal | N/A |
1% SBE Goal 32% CBE Goal |
N/A | ||||
7/21/14 | E14-PWWM-01 | Non-Exclusive Professional Services Agreement for Roadway Improvements to West Dixie Highway from NE 164th Street to NE 173rd Street | 7% CBE Goal | N/A | N/A |
1st Tier Setaside 100% CBE Goal |
N/A | |||
7/21/14 | E14-PWWM-03 | Non-Exclusive Professional Services Agreement for Roadway Improvements for NW 97 Ave from NW 58th Street to NW 70th Street | 8% CBE Goal | N/A | N/A |
1st Tier Setaside 100% CBE Goal |
N/A | |||
7/11/14 | DB14-PWWM-01 | Design-Build Services for The Venetian Causeway Bridge Rehabilitation - Street Bridge # 874459 |
No Measure SBE No Measure CBE Trade Set-Aside |
N/A | N/A |
No Measure SBE No Measure CBE Trade Set-Aside – Pavement Markings and Traffic Signage |
N/A | |||
5/20/14 | A14-JHS-02 | Consultant Services for Functional Space Programming, Comprehensive Design, Procurement And Constructional Administration Services for a New Rehabilitation Hospital | 9% CBE Goal | N/A | 18% CBE Goal | 18% CBE Goal | N/A | |||
5/5/14 | A14-ISD-01 GOB ESP | Professional Services Agreement for the Mental Health Facility Renovation | 14% CBE Goal | N/A | N/A | 28% CBE Goal | 28% CBE Goal | N/A | ||
4/4/14 | E14-PWWM-05 | Design Services for The Replacement of the North Miami Ave North of NW 146th Street Bridge | 10% CBE Goal | N/A | 1st Tier Set Aside -100% | 1st Tier Set Aside-100% | N/A | |||
4/4/14 | E14-PWWM-06 | Design Services for The Replacement of the NW 32nd Ave and NW 151st Street Bridge # 874032 E14-PWWM-06 – Project Package |
10% CBE Goal | N/A |
1st Tier Set Aside |
1st Tier Set Aside | N/A | |||
4/4/14 | E14-WASD-01 | Professional Engineering and Geological Services for Water, Wastewater and Reclaimed Water Planning Services | 25% CBE Goal | N/A | N/A | 30% CBE Goal | 30% CBE Goal | N/A | ||
3/27/14 | E13-SEA-04 | Non-exclusive Professional Services Agreement for Marine Infrastructure Services | 15% CBE Goal | N/A | N/A | 15% CBE Goal | 15% CBE Goal | N/A | ||
3/25/14 | E14-PW-02 | Non-exclusive Professional Services Agreement for Roadway Improvements to NW 58th Street from NW 97th Ave to SR-826 | 11% CBE Goal | N/A | 100% 1st Tier Setaside | 100% 1st Tier Setaside | N/A | |||
3/14/14 | E14-SEA-01 | Non-Exclusive Professional Services Agreement for Management Financial Consulting and Bond Engineering Services | 4% CBE Goal | N/A | N/A | 6% CBE Goal | 6% CBE Goal | N/A | ||
3/11/14 | DB14-WASD-01 | Design-Build Services for Replacement of 72-inch Sanitary Sewer Force Main along NW/NE 159th Street between NW 17th Ave and NW 10th Ave | 25% CBE Goal 10% CSBE Goal |
N/A |
15.50% CSBE Goal 10% CWP Goal 30% CBE Goal |
N/A | ||||
3/10/14 | A14-JHS-01 | Consultant Services for the JHS West Wing 9th, 10th and 11th Floor Modernization | 30% CBE Goal | N/A | N/A | 1st Tier Set aside - 100% | 1st Tier Set aside - 100% | N/A | ||
3/7/14 | E13-WASD-11 | Owner’s Representative for Professional Engineering Services relating to the State of Florida’s Ocean Outfall Legislation and Miami-Dade County’s Wastewater System |
22% CBE Goal | N/A | 28% CBE Goal | 28% CBE Goal | N/A | |||
1/31/14 | A14-CUA-01 | Professional Services Agreement for Architecture & Engineering Services | 15% CBE Goal | N/A | 20% CBE Goal | 20% CBE Goal | N/A | |||
1/28/14 | E13-WASD-10 | Capacity Management, Operation, and Maintenance Services Related to the Consent Decree | 19% CBE Goal | N/A | 25% CBE Goal | 25% CBE Goal | N/A | |||
1/17/14 | E14-SEA-01 | Non-exclusive Professional Services for Management Financial Consulting and Bond Engineering Services | 5% CBE Goal | TBD | N/A | N/A | 5% CBE Goal | 5% CBE Goal | N/A | |
12/20/13 | E13-RER-02 | Environmental Cleanup, Compliance and Related Services for Miami-Dade County Facilities | 12% CBE Goal (on each of the six (6) Agreement) | N/A | N/A | 14% CBE Goal | 14% CBE Goal | N/A | ||
12/17/13 | A13-MDAD-01 ESP | MIA Concourse H Roof Replacement and Miscellaneous Repairs | 30% CBE Goal | N/A | 1st Tier Set Aside 100% | 1st Tier Set Aside 100% | N/A | |||
12/16/13 | A13-MDAD-02 ESP | MIA Building 863 Roof Replacement | 30% CBE Goal | N/A | 1st Tier Set Aside 100% | 1st Tier Set Aside 100% | N/A | |||
12/5/13 | DB13-WASD-03 | Design-Build Services for Replacement of Water Mains and Service Conversions in The Shenandoah Area (Phase A) | 20% CBE Goal 16% CSBE Goal |
N/A | N/A |
26% CBE Goal 20% CSBE Goal 12.4% CWP Goal |
N/A | |||
12/5/13 | DB13-WASD-04 | Design-Build Services for Replacement of Water Mains and Service Conversions in The Shenandoah Area (Phase B) | 20% CBE Goal 16% CSBE Goal |
N/A | N/A |
26% CBE Goal 20% CSBE Goal 12.4% CWP Goal |
N/A | |||
12/2/13 |
A13-SEA-02 (Resubmittal) |
Professional Services Agreement for Architectural and Engineering Services for PortMiami Cruise Terminals | 15% CBE Goal | N/A | 15% CBE Goal | 15% CBE Goal | N/A | |||
12/2/13 | A13-SEA-04 | Professional Services Agreement for Architectural and Engineering Services for PortMiami Cruise Terminals | Tier II CBE Set-Aside (exemption of T.C. 5.05) | N/A |
Set Aside Tier 2 (w/exempt) 100% CBE Goal |
N/A | ||||
11/8/13 | A13-ISD-04 GOB | Professional Services Agreement for Surveying and Implementation of Stephen P. Clark Center – ADA Barrier Removal | 100% CBE Set-Aside | N/A | 1st Tier Set Aside | 1st Tier Set Aside | N/A | |||
11/8/13 | A13-CUA-02 | Professional Services Agreement for A&E Services | 10% CBE Goal | N/A | 28% CBE Goal | 28% CBE Goal | N/A | |||
11/7/13 | E13-WASD-05 | Design Services for Wastewater Treatment Plants Related to Consent Decree Projects | 25% CBE Goal | N/A | 30% CBE Goal | 30% CBE Goal | N/A | |||
10/11/13 | E13-WASD-06 | Capacity Management, Operation, and Maintenance Services Related to the Consent Decree Projects | 32% CBE Goal | N/A | 32% CBE Goal | 32% CBE Goal | N/A | |||
10/11/13 | E13-WASD-07 | Engineering Services for Geographic Information Systems Utility Backlog Required by the Consent Decree | 15% CBE Goal | 20% CBE Goal | 20% CBE Goal | N/A | ||||
10/8/13 | E13-WASD-04 | Design Services for Wastewater Collection and Transmission Systems Related to the Consent Decree Projects | 22% CBE Goal | N/A |
30% CBE Goal |
30% CBE Goal | N/A | |||
9/10/13 | A13-ISD-01 GOB ESP | Non-Exclusive Professional Services for the Renovations to the Culmer Neighborhood Service Center | Tier 1 CBE Set-Aside | TBD | N/A | TBD | TBD | N/A | ||
8/26/13 | E13-WASD-03 (five (5) Agreements) | Design Services for the Implementation of a Pump Station Improvement Program | 40% CBE Goal | 40%CBE Goal | 40% CBE Goal | N/A | ||||
8/22/13 | E13-RER-01 (six (6) Agreements) | Environmental Cleanup, Compliance and Related Services for Miami-Dade County Facilities | (1) Tier 2 CBE Set-Aside | N/A |
1 Agreement -CBE Tier 2 Set-Aside 3 Agreements-9% CBE goal 2 Agreements-No Measure |
N/A | ||||
8/12/13 | A13-CUA-01 | Professional Services Agreement for A/E Services | 20% CBE Goal | N/A | N/A | 28% CBE Goal | 28% CBE Goal | N/A | ||
8/7/13 | P252A-OSC-B702A-J104A-3 | MIA Operating System and O & M Oversight Services Consultant (OSC) for the Satellite E & Other MIA APM Operating Systems | Bid Waiver & 10% CBE Goal | N/A | N/A | N/A | Bid Waiver & 10% CBE Goal | 10% CBE Goal | N/A | |
8/1/13 | E13-SEA-01 | Non-Exclusive Professional Services Agreement for Civil Infrastructure Engineering Services | 25% CBE Goal | N/A | N/A | 25% CBE Goal | 25% CBE Goal | N/A | ||
8/1/13 | E13-SEA-02 | Non-Exclusive Professional Services Agreement for Civil | 18% CBE Goal | N/A | N/A | 18% CBE Goal | 18% CBE Goal | N/A | ||
8/1/13 | E13-SEA-03 | Non-Exclusive Professional Services Agreement for Marine Infrastructure Engineering Services | 22% CBE Goal | N/A | N/A | N/A | 22% CBE Goal | 22% CBE Goal | N/A | |
8/1/13 | E13-SEA-04 | Non-Exclusive Professional Services Agreement for Marine Infrastructure Engineering Services | 22% CBE Goal | N/A | N/A | N/A | 22% CBE Goal | 22% CBE Goal | N/A | |
7/23/13 | A13-SEA-03 | Non-Exclusive Professional Services Agreement for Architectural and Engineering Services for PortMiami Federal Inspection Facility | 19% CBE Goal | N/A | 19% CBE Goal | 19% CBE Goal | N/A | |||
7/11/13 | DB13-WASD-01 | Design-Build Services for Gravity Sewer Interceptors for Pump Station No. 3 | 16.5% CBE Goal & 11.2% CSBE Goal | N/A | N/A | 17.50% CBE Goa & 11.20% CBE Goal | N/A | |||
7/8/13 | A13-ISD-02-GOB | Non-Exclusive Professional Services for Preparation of Design Criteria Package for the Mental Health Facility Renovation | 25% CBE Goal | TBD | N/A | 28% CBE Goal | 28% CBE Goal | N/A | ||
7/2/13 | A13-MDAD-01 | MIA Concourse H Roof Replacement and Miscellaneous Repairs | 30% CBE Goal | TBD | N/A | N/A | 30% CBE Goal | 30% CBE Goal | N/A | |
7/2/13 | A13-MDAD-02 | MIA Building 863 Roof Replacement | 30% CBE Goal | TBD | N/A | N/A | 30% CBE Goal | 30%CBE Goal | ||
6/27/13 | P252A | MIA Satellite E APM System Replacement | 12% CBE Goal & Bid Waiver | N/A | N/A | 12% CBE Goal & Bid Waiver | 12% CBE Goal & Bid Waiver | |||
5/15/13 | E13-WASD-01-R | Non-Exclusive Professional Services Agreement for Program and Construction Management Services Related to the Wastewater System | 28% CBE Goal | N/A | None | N/A | 28% CBE Goal | 28% CBE Goal | N/A | |
5/15/13 | E13-WASD-02-R | Non-Exclusive Professional Services Agreement for Program and Construction Management Services for the Implementation of a Pump Station Improvement Program | 29% CBE Goal | N/A | None | N/A | 29% CBE Goal | 29% CBE Goal | N/A | |
5/14/13 | A13-SEA-02 | Architectural and Engineering Services for PortMiami Cruise Terminals | 15% CBE Goal | None | 15% CBE Goal | 15% CBE Goal | N/A | |||
5/2/13 | 123203-13-002 | Ives Estate District Park – Multipurpose Synthetic Field and Scoreboard | 23% CBE Goal | TBD | N/A | 32% CBE Goal | 32% CBE Goal | N/A | ||
4/18/13 | E13-MDAD-02 | Pavement Management Systems | 20% CBE Goal | TBD | 15% CBE Goal | 15% CBE Goal | N/A | |||
4/5/13 | EOI-02-08 (Parcel A) | Expression of Interest for Development Sites at MIA (Business Park) | 10% CBE Goal 14.3% CSBE Goal |
TBD | None | N/A | 10% CBE Goal 14.35% CSBE Goal |
10% CBE Goal 14.35% CSBE Goal |
N/A | |
4/5/13 | EOI-02-08 (Parcel B) | Expression of Interest for Development Sites at MIA (Convenience Center) | 10% CBE Goal 14.3% CSBE Goal |
TBD | None | N/A | 10% CBE Goal 14.35% CSBE Goal |
10% CBE Goal 14.35% CSBE Goal |
N/A | |
4/5/13 | EOI-02-08 (Parcel C) | Expression of Interest for Development Sites at MIA (Hospitality Center) | 10% CBE Goal 14.3% CSBE Goal 1% SBE Goal |
TBD | None | N/A | 10% CBE Goal 14.3% CSBE Goal 1% SBE Goal |
10% CBE Goal 14.35% CSBE Goal 1% SBE Goal |
N/A | |
4/2/13 | E13-WASD-02 | Non-Exclusive Professional Services Agreement for Program and Construction Management Services for the Implementation of a Pump Station Improvement Program | 19% CBE Goal | TBD | TBD | 24% CBE Goal | 24% CBE Goal | N/A | ||
4/2/13 | E13-WASD-01 | Non-Exclusive Professional Services Agreement for Program and Construction Management Services Related to the Wastewater System | 12% CBE Goal | TBD | TBD | 18% CBE Goal | 18% CBE Goal | N/A | ||
3/25/13 | A13-SEA-01 | Professional Services Agreement for Port Miami Portwide Wayfinding | 25% CBE Goal | N/A | 25% CBE Goal | 12% CBE Goal | N/A | |||
3/22/13 | E13-MDT-01 | Miami-Dade Transit Fiscal Year 2015-2024 Transit Development Plan | 4% CBE Goal | TBD | N/A | 25% CBE Goal | N/A | |||
3/18/13 | E13-MDAD-01 | Aviation Planning Consultant Services | 15% CBE Goal | None | N/A | N/A | 15% CBE Goal | 15% CBE Goal | N/A | |
3/5/13 | A12-HT-01 | Professional Services Agreement For A&E Services | 10% CBE Goal | Tier 1 CBE Set-Aside | 28% CBE Goal | |||||
1/18/13 | A12-SEA-01 | Professional Services Agreement For Architectural and Engineering Services for The Port of Miami Cruise Terminals and Central Examination Facilities | 14% CBE Goal | N/A | 15% CBE Goal | 15% CBE Goal | N/A | |||
1/17/13 | DB12-WASD-01 | Replacement of Existing 54” Sanitary Sewage FM Pipeline from CDWWTP to Fisher Island Under Norris Cut Channel |
20% CBE 11% CSBE Goal |
N/A | N/A | |||||
12/10/12 | e12-PWWM-03 | Miscellaneous Professional Services Agreements to Provide Materials Testing/Consulting/Training Services | No Measure | N/A | N/A | N/A | No Measure – Pool PSA | No Measure – Pool PSA | N/A | |
12/10/12 | e12-PWWM-02 | Miscellaneous Professional Services Agreements to Provide Soils, Foundations, and Materials Testing Services | No Measure | N/A | N/A | N/A | No Measure – Pool PSA | No Measure – Pool PSA | N/A | |
12/10/12 | e12-PWWM-01 | Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying | No Measure | N/A | N/A | N/A | No Measure – Pool PSA | No Measure – Pool PSA | N/A | |
11/24/12 | A12-CUA-02 | Miscellaneous Professional Services Agreement for A&E Services | No Measure | Tier 1 CBE Set-Aside (Exemption for Specialty Services) | 10% CBE Goal | |||||
11/13/12 | DB12-ISD-01 | Design-Build Services for the New MDPD Academy Building | 28% CBE Goal & 21% CSBE Goal | N/A | N/A | N/A | 28% CBE Goal (resubmittal – 5/11/2011) 21% CSBE Goal (resubmittal – 5/11/2011) | 28% CBE Goal (resubmittal – 5/11/2011) 21% CSBE Goal (resubmittal – 5/11/2011) | N/A | |
11/07/12 | A12-CUA-02 | Professional Services Agreement for Architectural and Engineering Services | 10% CBE Goal | N/A | TBD | TBD | ||||
10/05/12 | E12-SEA-03 | Nonexclusive Professional Services Agreement for Port of Miami Deep Dredge Monitoring Services | 8% CBE Goal | N/A | TBD | 8% CBE Goal | N/A | |||
10/05/12 | E12-WASD-04 | CONTRACT ADMINIS. AND CONSTRUCTION MANAGEMENT SERVICES - REPLACEMENT OF THE 54-INCH SANITARY SEWAGE FORCE MAIN PIPELINE WITH A 60-INCH SANITARY SEWAGE FORCE MAIN PIPELINE FROM FISHER ISLAND (UNDER THE NORRIS CUT), TO THE CDWTP AT VIRGINIA KEY (SIC 871) |
25% DBE Goal | N/A | N/A | 27% CBE Goal | 27% CBE Goal | N/A | ||
09/18/12 | ITB-MDAD-04-12 (A&E) | Invitation to Bid – Satellite E APM Replacement and O&M Services Project Phases 1 and 2 | 22.24% CBE Goal | N/A | N/A | 35% CBE Goal | 35% CBE Goal | |||
09/18/12 | ITB-MDAD-04-12 (A&E-CIS) | Invitation to Bid – Satellite E APM Replacement and O&M Services Project Phases 1 and 2 | 35% CBE Goal | N/A | N/A | 27% CBE Goal | 27% CBE Goal | |||
09/18/12 | E12-WASD-03 | Non-Exclusive Professional Services Agreement for a Program Management Consultant and Related Services | 10% CBE Goal | 25% CBE Goal | 25% CBE Goal | |||||
08/06/12 | E12-SEA-02 | Non-Exclusive Professional Services Agreement for Geographic Information System Services | 20% CBE Goal | N/A | 20% CBE Goal | 20% CBE Goal | ||||
06/21/12 | E12-MPO-03 | Non-Exclusive Professional Services Agreement (PSA) for the Regional Transportation Plan for Southeast Florida (2040 RTP) Program | 8.6% DBE Goal | N/A | N/A | 8.6% DBE Goal | 25% CBE Goal | |||
06/18/12 | E12-MPO-01 | Non-Exclusive Professional Services Agreement (PSA) for the 2040 Long Range Transportation Plan | 8.60% DBE Goal | N/A | N/A | 8.60% DBE Goal | 8.60% DBE Goal | |||
06/16/12 | E12-SEA-01 | Cargo Gate Modifications and Improvements | 25% CBE Goal | N/A | N/A | 25% CBE Goal | 25% CBE Goal | |||
05/16/2012 | E11-PWWM-01 | Bond Engineering Services | No Measure | N/A | No Measure | No Measure | ||||
04/25/2012 | E12-WASD-02 | Non-exclusive Professional Services for the Replacement/Rehabilitation of a 72-inch Sanitary Sewage Force Main along NW/NE 159th Street between NW 17th Ave and NE 10th Ave |
15% CBE Goal | N/A | Tier 1 CBE Set-Aside | 25% CBE Goal | ||||
02/22/2012 |
DB10-GSA-01 |
Design-Build Services for the New MDPD Academy Building |
28% CBE Goal |
N/A |
N/A |
N/A |
28% CBE Goal |
N/A |
||
12/30/2011 |
DB10-GSA-02 |
Design Build Services to Renovate/Retrofit Existing Mental Health Facility |
12% CBE Goal & 21% CSBE Goal |
Resubmittal |
TBD |
15% CBE Goal |
N/A |
|||
11/28/2011 |
E11-SEA-03 |
Non-Exclusive Professional Services for Program Management Consultant (PMC) |
14% CBE Goal |
19% CBE Goal |
||||||
09/31/11 |
E03-SEA-05-2 |
Area 2 (Bay 177-183) Construction of Seawall |
No Measure - Awarded |
N/A |
N/A |
N/A |
No Measure - Awarded |
N/A |
||
09/28/2011 |
E11-MDAD-02 |
Stormwater Master Plan |
5% CBE Goal |
N/A |
N/A |
|||||
08/16/11 |
A11-OCI-01 |
Non-Exclusive Professional Services Agreement for Construction Inspection Services (CIS) |
(Two Agreements) - i. 1st Tier CBE Set-Aside ii. 30% CBE Goal |
N/A |
N/A |
|||||
07/19/2011 |
A11-SEA-02 |
Non-Exclusive Professional Services Agreement for Portwide Wayfinding |
25% CBE Goal |
N/A |
N/A |
|||||
06/21/11 |
A11-PARK-01 GOB ESP |
Westchester Cultural Arts Center |
15.4% CBE Goal |
N/A |
||||||
06/03/2011 |
E11-SEA-01 |
No Exclusive Professional Services for Environmental Services |
30% CBE Goal |
N/A |
N/A |
|||||
05/24/2011 |
A11-GSA-01 GOB ESP |
Design Services for Renovation/Expansion of History Miami |
18% CBE Goal |
Project Canceled |
Project Canceled |
Standing Review Committee deferred item for further analysis |
||||
05/20/2011 |
A11-SEA-03 |
Cruise Terminal F & G Remodeling |
23% CBE Goal |
N/A |
N/A |
You are now leaving the official website of Miami-Dade County government. Please be aware that when you exit this site, you are no longer protected by our privacy or security policies. Miami-Dade County is not responsible for the content provided on linked sites. The provision of links to these external sites does not constitute an endorsement.
Please click 'OK' to be sent to the new site, or Click 'Cancel' to go back.